Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 CrAccepted-Finance | ₹11.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹11.2 Cr+₹18.9 L (1.71%)Accepted-Finance HABITAT STREET MAIN ROAD VIII WARD NO 10 GP WARD WARD NO 10 BLOCK ULB NABARANGAPUR MPL P O DIST NABARANGAPUR 764059 ODISHA | NABARANGPUR | ODISHA | 764059 | ₹11.2 Cr+₹18.9 L (1.71%) | L2 | Accepted-Finance L2 |
| 3 | L3₹11.5 Cr+₹46.7 L (4.22%)Rejected-Finance AT JAGATJANANI STREET VIP LANE JEYPORE PO PS JEYPORE DIST KORAPUT ODISHA | JEYPORE | KORAPUT | ODISHA | ₹11.5 Cr+₹46.7 L (4.22%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.8 Cr+₹74.1 L (6.71%)Rejected-Finance | ₹11.8 Cr+₹74.1 L (6.71%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.9 Cr+₹88.3 L (8.00%)Rejected-Finance AT ANANTAPUR BALIANTA PHULNAKHARA DIST KHURDA ODISHA | PHULNAKHARA | KHURDA | ODISHA | ₹11.9 Cr+₹88.3 L (8.00%) | L5 | Rejected-Finance L5 |
Tender Value
₹13.8 Cr
EMD Value
₹13.8 L
Closing Date
4 May 2026, 5:00 pmClosed
Chief Engineer, Buildings-II (I/c), Odisha, BBSR.
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of Block Level Stadium (With Indoor Hall) in Kudumulgoma Block under Malkangiri District.
2026_EICCL_128180_3
CE-Bldg-II-57/2025-26
Open Tender
Civil Works - Buildings
Percentage
547 days
MALKANGIRI DIST
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹13.8 L
Yes
7 Aug 2026
16 Apr 2026
5 May 2026
16 Apr 2026
4 May 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Excavation in all kinds of soil with hydraulic excavator (1 cum capacity) including cutting and loading in tippers, trimming bottom and side slopes ,in accordance with requirements of lines,grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.work complete as directed by the Engineer-in-charge.
FOOTBALL FIELD | - | Cum | - | - |
| 2 | ATHELETIC TRACK | - | Cum | - | - |
| 3 | VOLLEY BALL COURT | - | Cum | - | - |
| 4 | KHO KHO ,KABADDI COURT | - | Cum | - | - |
| 5 | CUTTING FILLING | - | Cum | - | - |
| 6 | RETAINING WALL (PERIPERIAL) | - | Cum | - | - |
| 7 | RETAINING WALL (INTERNAL) | - | Cum | - | - |
| 8 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction as directed by the Engineer-in-charge.
FOOTBALL FIELD | - | Cum | - | - |
| 9 | FOOTBALL FIELD PATHWAY | - | Cum | - | - |
| 10 | ATHELETIC TRACK | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_587972.xls
BOQ • 0.99 MB
DTCN.pdf
Tender Documents • 17.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .