Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹24.2 L
EMD Value
₹24,300
Closing Date
8 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, R.W.Division, Angul
Executive Engineer, R.W.Division, Angul
Construction of 1 no E type Qtr at PHC Saharagurujang
2025_CERWI_122313_25
Online AGL-18
Open Tender
Civil Works - Buildings
Percentage
120 days
Angul
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹24,300
Yes
2 Dec 2025
2 Dec 2025
9 Dec 2025
2 Dec 2025
8 Dec 2025
2 Dec 2025
2 Dec 2025 - 6 Dec 2025
Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other T &P required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess.
Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess.
Providing cement concrete M10 (1:3:6) using 40 mm HG Metal in luding cost conveyance of all material,ramming with rammers with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess.
Cement concrete work (1:2:4) using 12 mm to 20 mm size black hard crusher broken granite stone chips of approved quality from approved quarry including hoisting,lowering , laying and compacting concrete watering and curing for 28 days including finishing the exposed surface including cost , conveyance, royalties and taxes of all the materials and cost of all labour, T&P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-charge
Providing Cement Concrete (1:4:8) in foundation with 4cm nominal size of hand broken hard granite metal of approved quality from approved quarry including hoisting, lowering, and laying in postition in layers not exceeding 150mm. thick with proper packing and ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc. complete in all respect as per the specification and as per direction of the Engineer-in-Charge
R.C.C. M-25 having a minimum compressive strength(in work test) 250 Kg/cm.2 in 15cm cubes at 28 days after mixing and tests conducted in accordance with I.S. 456 and I.S.516 using 20mm & down graded size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering laying and compacting concrete, watering and curing for 28days centering, shuttering, finishing the exposed surfacs inculding ceiling, smooth, providing grooves beads where necessary and providing, required No of fan Hooks as directed including, cost, conveyance, royalities and taxes of all materials and cost, of all labour and T & P required for the work etc. complete in all respect including 1% cess as per direction of the Engineer-in-Charge but excluding the cost of M.S.Rods or Tor steel and binding wire and labour charges for bending, binding and tying grills.
a) Column Base
b) Column & Beam
c) Plinth Band
d) Lintel Band
e) Chajja
f) Roof Slab
Cutting, streightening the bent up M.S./TS Rods bending, binding, welding, jointing if necessary and tying the grills and placing in position, as required for R.C.C work and for providing required No. of Fan Hooks hoisting, lowering, laying including, cost, conveyance, taxes of all M.S. Rods or Tor steel and binding wires of 118 to 20 gauge required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Rods or Tor steel only and no separate payment will be made towards the weight of binding wires) including 1% cess as per direction of the Engineer-in-Charge
Fly Ash bricks masonary (1:6) in foundation and plinth using 25cm x 12cm x 8 cm size bricks having crushing strength not less than 75 kg/cm2 including splays cutting, circular, moulding and corbelling, champhering and similar such type of works watering and curing etc. complete, including, cost, conveyance, royalities and taxes of all materials and cost of all labour and T & P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-Charge
2.5cm Damp proof course with CC (1:2:4 ) using 12mm size chips including, cost, conveyance, royalities and taxes of all materials and cost of all labour and T & P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-Charge
Fly Ash bricks masonary (1:6) in Superstructure using 25cm x 12cm x 8 cm size bricks having crushing strength not less than 75 kg/cm2 including splays cutting, circular, moulding and corbelling, champhering and similar such type of works watering and curing etc. complete, including, cost, conveyance, royalities and taxes of all materials and cost of all labour and T & P required for the work etc. complete including 1% cess and as per the specification as directed by the Engineer-in-Charge
12 mm thick cement plaster(1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete including 1% cess as directed by the Engineer-in-Charge
16 mm thick cement plaster(1:6) over brick massonary finished smooth, after racking out the joints including watering, and curing with cost, conveyance, royalities and taxes of all materials, and cost of all labour and T & P required for the work complete including 1% cess as directed by the Engineer-in-Charge
20 mm thick C.P in CM ( 1:4) in grading plaster over roof slab including cost of all labour , material etc complete including 1 % cess & as per direction of Engineer-in-charge
Fixing of Vitrified tiles (600 x 600) in fioors,walls,treads landings etc on 25mm thick bed of c.m(1:1) with neat cement slury mixed with pigment to match the shade of the tiles including cost of tiles etc complete
Fixing Vetrified tiles of size 600mmx600mm (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including all costs complete.
Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Casement Door - 60- Series duly manufactured using UPVC reinforced profiles of 60mmx55mmx2.5mm for outer frames, 102mmx60mmx2.25mm for casement door sash profile and 74mmx60mmx2.5mm mulion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 2.0 mm prefabricated and welded through fushion welding the door sash shall be fitted with 12mm thick WPC board of green play make duly fixed with EPDM wheathering seal resistance accessories like clipping locking system made of aluminium 1 No per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards.
Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Three track -Three panel sliding window-60-series duly manufactured using UPVC reinforced profiles of 108mmx45mmx2.5mm of outer frames and window sash of 39 mmx58mmx2.5mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fushion welding the window frame shall be fitted with 6mm thick clear touchenced glass of SAINT -GOBAIN make duly fixed with EPDM wheathering seal resistance and the system is to be installed using Unreinforced large coupler at the site using anchoner fasteners, silicon rubber sealant , easy glazing/deglazing at site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards.
Providing , fitting & fixing Steel Angle Iron window frame with M.S grill manufactured from standard rolled steel angle section 40 mm X 40 mm X 6 mm cornered of the frame duly metered and electrically welded with fish tail hold fasts made out of M.S flats of size 200 mm X 50 mm X 30 mm wide & 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & M.S Grills made out of 19 mm x 5 mm flat properly welded to the window frame with one coat of anti corrosive red oxide zinc chrome primere as per direction of Engineer - in - Charge including 1 % cess .
Finishing plastered surface of wall surface with Cement based putty & making smooth to recive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete.
Painting two coats with approved paint over a coat of primer of any approved shade with cost, conveyance, taxes of all materials, all labour and T&P required for the work including the cost of primer all other materials aetc complete including 1% cess as per direction of the Engineer-in-Charge
Distempering two coats to wall with approved distemper of approved shade including cost, conveyance & taxes of all material, labour etc complete including 1% cess and as per specification and direction of the EIC
Finishing walls with weather coat of approved shade on new work two coat over acoat of primer to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete. including 1 % cess. as per direction of the Engineer-in-charge.
Cement washing one coat with cement over new plaster surface including cost of cement with all cost, conveyance royalty taxes of all materials and all labour T&P required for the work including 1 % CESS etc complete as per direction of the Engineer-in-charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_568662.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .