Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹17.3 Laccepted-aoc | ₹17.3 L | accepted-aoc |
Tender Value
₹34.6 L
EMD Value
₹34,643
Closing Date
27 Feb 2026, 5:00 pmClosed
CGM(Engg) Revenue Circle
Khairatabad Hyderabad
Laying of Water Supply and Sewerage lines in various localities under O and M Dn.No.XI, XIII and XIV under Deposit Contribution Works
681796
EP-316/CGM(E)/RC/2025-26, Dt:21.02.2026
OPEN
Water Supply
HYDERABAD, TELANGANA
11 documents required · 11 mandatory
₹1,227
₹34,643
27 Feb 2026
21 Feb 2026
21 Feb 2026
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 400mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Supply and delivery of Spun Yarn of good quality inckuding cost and conveyance etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply and delivery of Cement of good quality inckuding cost and conveyance etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 400mm dia DI pipes and specials with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Making dummy arrangements to 150mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Six Lakh Fifty Nine Thousand Twenty Five and Eighty Five Paisa only)
Conveyance of 300mm dia SWG pipes from departmental stores of HMWSSB to work site including transportation loading, unloading and stacking etc., all labour incidental and operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for manhole all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Lowering, laying and jointing 300mm SWG pipes ready made trenches true to alinement and gradient,jointing and testing of stone ware pipes including cost of jointing materials such as CM(1:1) proportion and hemp yarm but excluding cost and conveyance of pipes etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Construction of 0.9M X 0.9M dia meter sewer manhole up to 1m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
Collection, Supply and filling ( quarry dust)with HBG stone chips 2.36mm and below in trenches of foundations and basement and the pipe line trenches with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer watering consoliditing each layer watering and ramming including cost of collection of sand and other requied materials conveyance of water to worksite and all operational incidental, labouer charges hire charges of T and P complete for finished item work ect., complete as directed by the H.M.W.S.&.S. Board Engineers.
Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
CC Road restoration in 1:2:4 mix using 6mm to 20mm HG metal machine mixing including cost and conveyance of all materials to site including labour charges curring etc., as directed by the H.M.W.S.&.S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Nine Lakh Ninety Eight Thousand Five Hundred Thirty Two and Forty One Paisa only)
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers. (excluding bailing of water)
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Jointing of 200mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Making dummy arrangements to 150mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Six Lakh Ninety Three Thousand Nine Hundred Forty Three and Twenty Nine Paisa only)
Cutting of BT road with 75 mm thgick including labour charges all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 300mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing the 300mm dia C.I/DI K7 pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jöinting materials such as rubber gasket and filling with water and testing to required field test pressure of 8kg/sqcm, including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing the 200mm dia C.I/DI K7 pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jöinting materials such as rubber gasket and filling with water and testing to required field test pressure of 8kg/sqcm, including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 300mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 200mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 300mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 200mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Making dummy arrangements to 200mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
Making dummy arrangements to 300mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
(Rupees Six Lakh Eighty Seven Thousand Four Hundred Eighty Three and Ninety Five Paisa only)
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Cutting of 250mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.(5HP)
Manufacture supply and delivery of 250mm dia MS pipe ended with barrel pipe made in 8mm thick MS plate including fabrication charges, all taxes including transportation and painting with anti corrosive epoxy paint complete etc. as directed by the HMWSSB Engineers.
Manufacture supply and delivery of MS 'T' of size 1100X1100X250 mm dia ended with barrel length of 1.80M fabricated with pipe made in 12mm thick and branch for a length of 1.00m fabricated with 10mm thich MS plate including cost of MS plate and fabrication charges, all taxes including transportation and painting with anti corrosive epoxy paint complete etc. as directed by the HMWSSB Engineers.
Manufacture supply and delivery of MS plain 'T' of size 250X250X250 mm dia ended with barrel length of 0.80M fabricated with pipe made in 10mm thick and branch for a length of 0.80m fabricated with 10mm thich MS plate including cost of MS plate and fabrication charges, all taxes including transportation and painting with anti corrosive epoxy paint complete etc. as directed by the HMWSSB Engineers.
Enganging Hydraulic Truck Crane 16T Hour hire charges of wages of operator and all incidental and operational charges etc.. complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 250mm dia MS/DI (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cost of MS 250mm dia Laying, Jointing, Hydrostatic Filed Test Pressure, including Cost of Site Welding, Jointing Materials And Cost of Transportation of Water Including Emptying Pipe Line After Completion Of Field Testing for different diameters of MSpipes etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Site welding charges for M.S. pipes and specials including hire charges of welding machine, generator, wages of skilled work men including cost of electrodes including all incidental operational charges, tools and plants etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 450mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 250mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering and keeping in position 450mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering and keeping in position 250mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Constuction of Valve Chamber for Distribution Lines (1.40 Mts at bottom,1.40 mts at top 1.25 Mts Depth with wall thickness 0.20 meters) 250mm dia to 400mm dia valve etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Manufacturing supply and delivery of 250mm dia of sluice valve keyrods etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Manufacturing supply and delivery of 450mm dia of sluice valve keyrods etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
CC Road restoration in 1:2:4 mix using 6mm to 20mm HG metal amchine mixing including cost and conveyance of all materials to site including labour charges curring etc., as directed by the H.M.W.S.&.S. Board Engineers.Bed Blocks 1100mm dia MS Tee
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
CC Road restoration in 1:2:4 mix using 6mm to 20mm HG metal amchine mixing including cost and conveyance of all materials to site including labour charges curring etc., as directed by the H.M.W.S.&.S. Board Engineers.250mm dia DI Line
Engaging of Diesel generating set 50 KVAHire charges of wages of operator and all incidental and operational charges etc complete as directed by the HMWS&SB Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
(Rupees Four Lakhs Twenty Five Thousand Three Hundred Forty Six and Twenty Nine Paisa only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule A.xls
TENDER_DOCUMENT • 0.09 MB
Schedule B.xls
TENDER_DOCUMENT • 0.53 MB
Schedule C.xls
TENDER_DOCUMENT • 0.09 MB
Schedule D.xls
TENDER_DOCUMENT • 0.09 MB
Schedule E.xls
TENDER_DOCUMENT • 0.09 MB
TENDER DOCUMENT.doc
TENDER_DOCUMENT • 0.22 MB
Download all tender documents and submit your bid