Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance WARD NO 12 RAM BILAS BASTI BHUCHO MANDI BATHINDA | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 L+₹25,010.45 (3.64%)Admitted-Finance | ₹7.1 L+₹25,010.45 (3.64%) | L2 | Admitted-Finance |
| 3 | L3₹7.2 L+₹35,996.23 (5.24%)Admitted-Finance | ₹7.2 L+₹35,996.23 (5.24%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P K TRADERS L2 | GPS CONSTRUCTIONS CIVIL & ELECTRICALS L1 | DB CONTRACTORS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Screening the gravel collected from around the foundations. | 6.75 | Cum | 30 ₹202.5 | 25 ₹168.75 Lowest | 27 ₹182.25 |
| 2.00 | Stacking the gravel collected from around the foundations. | 6.75 | Cum | 20 ₹135 | 17 ₹114.75 Lowest | 19 ₹128.25 |
| 3.00 | Re-spreading of gravel in the yard area in 3'' thick layer after finishing of foundations. | 6.75 | Cum | 150 ₹1,012.5 | 128 ₹864 Lowest | 137 ₹924.75 |
| 4.00 | Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres. | 142.75 | Cum | 170 ₹24,267.5 | 160 ₹22,840 Lowest | 171 ₹24,410.25 |
| 5.00 | Earth filling under floors with surplus
ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 2.29 | Cum | 60 ₹137.4 | 56 ₹128.24 Lowest | 59 ₹135.11 |
| 6.00 | Dismantling Reinforced cement concrete | 1.57 | Cum | 2,000 ₹3,140 | 1,967 ₹3,088.19 Lowest | 2,066 ₹3,243.62 |
| 7.00 | Shuttering for faces of concrete fdns and fdns. Beam & Plinth Beam. | 52.02 | Sqm | 200 ₹10,404 | 187 ₹9,727.74 Lowest | 197 ₹10,247.94 |
| 8.00 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including
attached pilasters buttresses etc. | 34.1 | Sqm | 310 ₹10,571 Lowest | 361 ₹12,310.1 | 380 ₹12,958 |
| 9.00 | Centering and Shuttering for Columns | 46.08 | Sqm | 410 ₹18,892.8 Lowest | 425 ₹19,584 | 447 ₹20,597.76 |
| 10.00 | Centring & shuttering for flat surfaces such as suspended floors, roofs landings etc. | 4.66 | Sqm | 410 ₹1,910.6 Lowest | 475 ₹2,213.5 | 499 ₹2,325.34 |
Tender Value
₹8.1 L
EMD Value
₹16,300
Closing Date
22 May 2026, 3:00 pmClosed
Sr.Xen CWD PSTCL Patiala
o/o Sr XEN Civil Works Division Flat no. 28, Officers Flat Complex, PSTCL , Near 23 No. Fatak, Patiala
Work of Construction of 1 no. addl. 3rd 20 MVA 66/11 KV Transformer plinth alongwith allied civil works at 220 KV S/S Rajla
2026_POWER_167992_1
12/2026-27
Open Tender
Civil Works
Item Rate
225 days
132 KV Sub station Rajla
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹16,300
Yes
2 Jun 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Screening the gravel collected from around the foundations. | - | Cum | 26 | - |
| - | Stacking the gravel collected from around the foundations. | - | Cum | 18 | - |
| - | Re-spreading of gravel in the yard area in 3'' thick layer after finishing of foundations. | - | Cum | 130.36 | - |
| - | Earth Work in Excavation in foundation trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including disposal of all surplus soil as directed with in lead of 30 metres. | - | Cum | 162.5 | - |
| - | Earth filling under floors with surplus
ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | - | Cum | 56.25 | - |
| - | Dismantling Reinforced cement concrete | - | Cum | 1,967.86 | - |
| - | Shuttering for faces of concrete fdns and fdns. Beam & Plinth Beam. | - | Sqm | 187.5 | - |
| - | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including
attached pilasters buttresses etc. | - | Sqm | 361.61 | - |
| - | Centering and Shuttering for Columns | 1 | Sqm | 425.89 | ₹425.46 |
| - | Centring & shuttering for flat surfaces such as suspended floors, roofs landings etc. | - | Sqm | 475 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
1Mainpage125mvaRajla.pdf
Tender Documents • 0.33 MB
2TandC125mvarajla.pdf
Tender Documents • 0.64 MB
3techspec.pdf
Tender Documents • 2.61 MB
DnitRajla.pdf
Tender Documents • 2.79 MB
BOQ_341642.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .