Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹15.2 LAdmitted-Finance | H1 | Admitted-Finance | ||
| 2 | H2₹15.2 L−₹3,750.15 (0.25%)Admitted-Finance | H2 | Admitted-Finance | ||
| 3 | H3₹14.9 L−₹28,951.22 (1.91%)Admitted-Finance 47 HANDWARA HANDWARA HANDWARA BUDGAM JAMMU KASHMIR 191111 UDYAM JK 12 0000914 | BUDGAM | JAMMU AND KASHMIR | 191111 | H3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Rejected on Request | ||
| 5 | Not Admitted-Fee/PreQual/Technical 380 SR GUNJ WATAL KADAL THAGBABA SAHIB SHAH KADAL SRINAGAR JAMMU KASHMIR 190002 | SRINAGAR | JAMMU AND KASHMIR | 190002 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
16 Sept 2026, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
PDDSS2627100246-Augmentation of sub-stations for critically overloaded DTs for winter preparedness under UT Capex Budget 2026-27 for ED HAndwara
2026_PDD_322505_1
e-nit 36 of 2026-27
Open Tender
Electrical Works
Turn-key
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹1,000
PDDSS2627100246-Augmentation of sub-stations for c
₹30,000
25 Sept 2026
27 Aug 2026
17 Sept 2026
29 Aug 2026
16 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 100 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, cu. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 3 | No. | 2,12,963.48 | ₹6,38,890.44 |
| 2 | Supply , Carriage upto site,installation ,testing & commissioning of 11/0.433kV, 63 KVA , 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Efficient Level-2, cu. wound , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. | 4 | No. | 1,75,200 | ₹7,00,800 |
| 3 | Supply, laying, testing & commissioning of 185 mm² Single-Core Cable,1.1k V Grade, XLPE un armoured FRLS type | 285 | No | 513.59 | ₹1,46,373.15 |
| 4 | Dismantling of Existing Material and return of same in divisional stores, including transportation, loading & un-loading.(complete Job) | 7 | No | 2,000 | ₹14,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tendernotice_2.pdf
PDF • 1.12 MB
BOQ_1082098.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .