Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹19,980
Closing Date
28 Feb 2020, 2:00 pmClosed
Executive Engineer Central Div JMC Jammu
Executive Engineer Central Div JMC Jammu
eNIT57c 3
2020_HAUDD_93288_3
eNIT57c of 2019-20
Open Tender
Civil Works
Item Rate
90 days
JMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Central Div JMC Jammu
₹19,980
29 Feb 2020
20 Feb 2020
28 Feb 2020
20 Feb 2020
28 Feb 2020
20 Feb 2020
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead 1:3:6 or richer mix
Earth work in excavation by manual means over area exceeding 30 cm and upto 1.5m in depth,1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 1m from cutting edges, disposed earth to be leveled and neatly dressed in all kind of soil
Centering and Shuttering incl. strutting propping etc. and removal of form work for foundation, footing , bases of columns.
Steel work welded in built up section / framed work including cutting hoisting, fixincg in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railing, brackets, gates and similar works
Reinforcement for R.C.C works including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Dismentaling of brick work in 1:6 mix
Demolishing RCC work manually/by Mechancial means incl. stacking of steel bars and disposal of unserviceable material within 50metres lead
Providing and Laying in position cement concrete. of specified grade excl. the cost of centering and Shuttering all work upto Plinth level (1:5:10) 1 cement: 5 coarse sand: 10 crushed graded stone Agg. 20mm nominal size
Providing & laying RCC (1:1.5:3) 20mm size Excl. cost of shuttering. All works upto Plinth level
Reinforcement of cement concrete 1:1.5:3 mix columns and slab beams
Centering and Shuttering incl. strutting propping etc. and removal of form work for Plinth beams
Centering and Shuttering incl. strutting propping etc. and removal of form work for foundation , footing , bases of columns
Removal of Excavated malba dismantled unserviceable material from the site of work by mech. Transport / Animal Transport or otherwise including loading complete job.
Carriage of material by Mech.Transport a)Sand/Aggregate
ARUN SUDAN
DEVINDER KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .