Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | L1 | Accepted-AOC Lowest Quote | |
| 2 | L2₹17.3 L+₹4.0 L (29.7%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Rejected-Finance Not the Lowest Quote | |
| 3 | Rejected-Technical 301 VARDHAMAN CHAMBER II VIKASPURI NEW DELHI 110018 | WEST | DELHI | 110018 | - | Rejected-Technical Shortfall documents not submitted | |
| 4 | Rejected-Technical ASHOK MARG LUCKNOW UTTAR PRDESH 226001 | LUCKNOW | UTTAR PRADESH | 226001 | - | Rejected-Technical No tender fees and EMD submitted | |
| 5 | Rejected-Technical | - | Rejected-Technical No tender fees and EMD submitted |
Tender Value
Refer Docs
EMD Value
₹42,697
Closing Date
21 Aug 2020, 6:00 pmClosed
AGM (Engg-E)
AAI, CA Jammu
Annual Comprehensive Maintenance of AC Units, Water Coolers and Purifiers at CA Jammu for the year 2020-22.
2020_AAI_54833_1
AAI/Jammu/Elect/W05
Open Tender
Electrical Works
Item Rate
730 days
AAI, CA Jammu
As per NIT
15 documents required · 15 mandatory
₹1,180
Airports Authority of India
₹42,697
10 Nov 2020
11 Aug 2020
28 Aug 2020
11 Aug 2020
21 Aug 2020
11 Aug 2020
11 Aug 2020 - 18 Aug 2020
Amount
SH:I For First Year (2020-21) Annual Comprehensive maintenance of following items by deploying 1 No. Technician (Skilled) and 1 No. Helper (Unskilled) for carrying out day to day maintenance, maintaining day to day records as per Agreement/ Tender doc on all working days etc. complete as req. as Instructed by EIC or its reprenstative,
Annual Comprehensive maintenance of following Air Conditioning units including repair and maintenance of voltage stabilizers etc complete as required.
5.5 TR, 3Ph Ductable/ Casette/ Tower type split AC Units
3-4 TR, 3Ph Ductable/Casette/Tower type split AC
2 TR, 1Ph Hi wall/ Ductable split AC
1.5 TR, 1 Ph Hi Wall Split AC Units
Annual Comprehensive maintenance of storage type water coolers of capacity including repair and maintenance of voltage stabilizers etc complete as required.
Upto 80 Ltrs
Above 80 Ltrs and upto 150 Ltrs
Annual Comprehensive maintenance of RO system including replacement of defective membranes, filters papers, Adopter,Pumps, Pressure switch,valves etc as required.
50LPH RO System
25 LPH RO System
Annual Comprehensive maintenance of Domestic RO including replacement of defectives membranes, filters,etc as required.
Annual comprehensive maintenance of water dispensers of capacity 16 Ltr., having cooling and heating capacity (make Blue Star) including replacement of defective parts, filters etc complete as required.
Dismantling of following type split AC units upto 4 mtrs copper piping including mouting of indoor and outdoor units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythene/PVC piping etc as complete as required.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Installation of following type split AC units upto 4 mtrs copper piping including mouting of indoor and outdoor units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythene/PVC piping etc as complete as required.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Providing, installation, testing and commissioning of refrigerant (copper) piping including insulation for suction and discharge line for split AC units.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required (for drain piping)
20 mm dia
Extra charges for supplying and laying following sizes PVC insulated and PVC round sheathed of 1.1 KV grade flexible copper conductor cable ISI marked on wall/ surface.
3C X 2.5 sq.mm
4C X 4.0 sq.mm
SH:II For Second Year (2021-22) Annual Comprehensive maintenance of following items by deploying 1 No. Technician (Skilled) and 1 No. Helper (Unskilled) for carrying out day to day maintenance, maintaining day to day records as per Agreement/ Tender doc on all working days etc. complete as req. as Instructed by EIC or its reprenstative,
Annual Comprehensive maintenance of following Air Conditioning units including repair and maintenance of voltage stabilizers etc complete as required.
5.5 TR, 3Ph Ductable/ Casette/ Tower type split AC Units
3-4 TR, 3Ph Ductable/Casette/Tower type split AC
2 TR, 1Ph Hi wall/ Ductable split AC
1.5 TR, 1 Ph Hi Wall Split AC Units
Annual Comprehensive maintenance of storage type water coolers of capacity including repair and maintenance of voltage stabilizers etc complete as required.
Upto 80 Ltrs
Above 80 Ltrs and upto 150 Ltrs
Annual Comprehensive maintenance of RO system including replacement of defective membranes, filters papers, Adopter,Pumps, Pressure switch,valves etc as required.
50LPH RO System
25 LPH RO System
Annual Comprehensive maintenance of Domestic RO including replacement of defectives membranes, filters,etc as required.
Annual comprehensive maintenance of water dispensers of capacity 16 Ltr., having cooling and heating capacity (make Blue Star) including replacement of defective parts, filters etc complete as required.
Dismantling of following type split AC units upto 4 mtrs copper piping including mouting of indoor and outdoor units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythene/PVC piping etc as complete as required.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Installation of following type split AC units upto 4 mtrs copper piping including mouting of indoor and outdoor units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythene/PVC piping etc as complete as required.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Providing, installation, testing and commissioning of refrigerant (copper) piping including insulation for suction and discharge line for split AC units.
1.5 to 2 TR split AC units
3 to 4 TR 3 phase cassette/ Tower split AC units
Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/ recess including cutting the wall and making good the same in case of recessed conduit as required (for drain piping)
20 mm dia
Extra charges for supplying and laying following sizes PVC insulated and PVC round sheathed of 1.1 KV grade flexible copper conductor cable ISI marked on wall/ surface.
3C X 2.5 sq.mm
4C X 4.0 sq.mm
ANOOP REFRIGERATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .