| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹1.1 Cr−₹5.7 L (5.00%)Accepted-AOC | ₹1.1 Cr−₹5.7 L (5.00%) | H3 | Accepted-AOC Accepted |
| 2 | H1₹1.1 CrRejected-Finance 65 1 R G ILLAM JAYAM NAGAR NEAR ATC DIPPO VALAPADY POST SALEM DISTRICT 636 115 | SALEM | TAMIL NADU | 636115 | ₹1.1 Cr | H1 | Rejected-Finance Above the estimate Rate |
| 3 | H2₹1.1 Cr−₹2.3 L (2.05%)Rejected-Finance 1 118 MARIYAMMAN KOVIL STREET KALPAGANUR POST ATTUR TK SALEM DISTRICT | MADURAI | TAMIL NADU | 625001 | ₹1.1 Cr−₹2.3 L (2.05%) | H2 | Rejected-Finance Above the estimate Rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical SI. No 4, 6, 10,12 not Submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical SI.No 5,6, 8 not Submitted |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
20 May 2025, 3:00 pmClosed
Executive Officer
Town panchayat office, Keeripatty
BT Road at Ward No.15 Melthombai Kattukottai Tank to Mavu thottam west to East and Ward 15 Keelthombai Bridge to Burrial ground road end in Keeripatty Town Panchayat
2025_DTP_555125_1
292-2025
Open Tender
Civil Works
Works
Keeripatty
Work contract
3 documents required · 3 mandatory
₹0
₹2.7 L
Yes
Town panchayat office, Keeripatty
12 Jun 2025
8 May 2025
20 May 2025
8 May 2025
20 May 2025
8 May 2025
8 May 2025 - 20 May 2025
14 May 2025
Amount
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
Edge packing
Providing, laying, spreading and compacting wet mix macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer. as per as per standar specification MORTH IV 406
Providing and laying Prime Coat over WMM surface using 7Kgs of Bitumen emulsion SS I for 10sqm including labour charges for preparing the surface and applying the required quantity of bitumen as teak coat etc., complete.
Providing and laying Tack coat over WMM surface treated with prime coat using 2.5kgs of Bitumen’s VG 30 for 10sqm including labour charges for preparing ;the surface and applying the required quantity ofl bitumen as teak coat etc., comple.
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.024 kgs of shredded plastic for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying of hot applied thermoplastic compound 2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification NO.803
SSS CONSTRUCTION (BID ID -1344584)
B VENKATESWARAN (BID ID -1345681)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .