Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.9 L
EMD Value
₹11,100
Closing Date
8 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Karnataka Forest Department
ACF Ballari
Erection of barbed wire fencing with RCC pillars along the forest boundary at Mincheri RF F.Sy. No 65 of Ballari Range under KMERC Scheme during the year 2026-27 (Unit No 19-CAT-II(A))
KFD/2026-27/OW/WORK_INDENT44227
KFD/2026-27/OW/WORK_INDENT44227
Reserved
Other Works
Two Tender Document System(Two Cover)
KFD ACF Territorial Sub Division Office Bellari
5 documents required · 1 mandatory · 4 optional
Work done certificate as per tender notification
₹500
₹11,100
24 Nov 2026
24 Nov 2026
9 Dec 2026
3 Dec 2026
26 Nov 2026
90 days
Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.. [PWD SR 2023-24, Vol-2, SI.No 11.62, Page No. 96]
Per Pole
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle. [PWD SR 2023-24, Vol-3, SI.No 2.4.i.a, Page No. 9]
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. [PWD SR 2023-24, Vol-1, SI.No 2.1.4, Page No. 15]
Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. [PWD SR 2023-24, Vol-2, SI.No 11.57.1, Page No. 95]
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. [PWD SR 2023-24, Vol-2, SI.No 8.29, Page No. 45]
Add 18% GST
Estimate preparation 0.5%
Scrutiny Charges 0.5%
Miscellaneous
Grand Total
Certified that the rates adopted in this estimate are as per the SSSR of PCCF, Bangalaore for the year 2024-25 and PWD SSR 2023-24
Certified that the works provided in this estimate have not been included in any of the estimates sanctioned during the year 2025-26
Certified that the above works has been included in the annual plan of operation for the year 2026-27
Ballari Range, Ballari
GPS READING :
Item Description
Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.. [PWD SR 2023-24, Vol-2, SI.No 11.62, Page No. 96]
Per Pole
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle. [PWD SR 2023-24, Vol-3, SI.No 2.4.i.a, Page No. 9]
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. [PWD SR 2023-24, Vol-1, SI.No 2.1.4, Page No. 15]
Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. [PWD SR 2023-24, Vol-2, SI.No 11.57.1, Page No. 95]
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. [PWD SR 2023-24, Vol-2, SI.No 8.29, Page No. 45]
Add 18% GST
Estimate preparation 0.5%
Scrutiny Charges 0.5%
Miscellaneous
Grand Total
Certified that the rates adopted in this estimate are as per the SSSR of PCCF, Bangalaore for the year 2024-25 and PWD SSR 2023-24
Certified that the works provided in this estimate have not been included in any of the estimates sanctioned during the year 2025-26
Certified that the above works has been included in the annual plan of operation for the year 2026-27
Ballari Range, Ballari
GPS READING :
Item Description
Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.. [PWD SR 2023-24, Vol-2, SI.No 11.62, Page No. 96]
Per Pole
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle. [PWD SR 2023-24, Vol-3, SI.No 2.4.i.a, Page No. 9]
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. [PWD SR 2023-24, Vol-1, SI.No 2.1.4, Page No. 15]
Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. [PWD SR 2023-24, Vol-2, SI.No 11.57.1, Page No. 95]
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. [PWD SR 2023-24, Vol-2, SI.No 8.29, Page No. 45]
Add 18% GST
Estimate preparation 0.5%
Scrutiny Charges 0.5%
Miscellaneous
Grand Total
Certified that the rates adopted in this estimate are as per the SSSR of PCCF, Bangalaore for the year 2024-25 and PWD SSR 2023-24
Certified that the works provided in this estimate have not been included in any of the estimates sanctioned during the year 2025-26
Certified that the above works has been included in the annual plan of operation for the year 2026-27
Ballari Range, Ballari
GPS READING :
Item Description
Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.. [PWD SR 2023-24, Vol-2, SI.No 11.62, Page No. 96]
Per Pole
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle. [PWD SR 2023-24, Vol-3, SI.No 2.4.i.a, Page No. 9]
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. [PWD SR 2023-24, Vol-1, SI.No 2.1.4, Page No. 15]
Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. [PWD SR 2023-24, Vol-2, SI.No 11.57.1, Page No. 95]
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. [PWD SR 2023-24, Vol-2, SI.No 8.29, Page No. 45]
Add 18% GST
Estimate preparation 0.5%
Scrutiny Charges 0.5%
Miscellaneous
Grand Total
Certified that the rates adopted in this estimate are as per the SSSR of PCCF, Bangalaore for the year 2024-25 and PWD SSR 2023-24
Certified that the works provided in this estimate have not been included in any of the estimates sanctioned during the year 2025-26
Certified that the above works has been included in the annual plan of operation for the year 2026-27
Ballari Range, Ballari
GPS READING :
Item Description
Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.. [PWD SR 2023-24, Vol-2, SI.No 11.62, Page No. 96]
Per Pole
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle. [PWD SR 2023-24, Vol-3, SI.No 2.4.i.a, Page No. 9]
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. [PWD SR 2023-24, Vol-1, SI.No 2.1.4, Page No. 15]
Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. [PWD SR 2023-24, Vol-2, SI.No 11.57.1, Page No. 95]
Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. [PWD SR 2023-24, Vol-2, SI.No 8.29, Page No. 45]
Add 18% GST
Estimate preparation 0.5%
Scrutiny Charges 0.5%
Miscellaneous
Grand Total
Certified that the rates adopted in this estimate are as per the SSSR of PCCF, Bangalaore for the year 2024-25 and PWD SSR 2023-24
Certified that the works provided in this estimate have not been included in any of the estimates sanctioned during the year 2025-26
Certified that the above works has been included in the annual plan of operation for the year 2026-27
Ballari Range, Ballari
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Mincheri RF barbed Wire Fencing Estimates.xlsx
Tender Document • 0.04 MB
Civil Works KW1 Tender Notification.PDF
Tender Document • 13.45 MB
Reservation Details.PDF
Tender Document • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .