Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
10 Aug 2026, 3:00 pmClosed
BHOLA NATH YAGNIK
PROJECT DIRECTOR
ZILA PARISHAD CAMPUS 1ST FLOOR, BUIDCO, BEGUSARAI
BHOLA NATH YAGNIK
PROJECT DIRECTOR
Development and Beautification of Beldaur Children Park under Nagar Panchayat Beldaur, District Khagaria.
137238
NIT-05-26-27 GR 02
Open Tender
CIVIL
Khagaria
• AS PER NIT
CIVIL
ITEM RATE
L1
1
1 document required · 1 mandatory
₹17,700
Yes
Processing Fee: 5900
₹3.0 L
Yes
Zila Parishad Building 1st Floor Buidco Begusarai
10 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
3 Aug 2026
Civil Work
Plumbing
Electrical
CCTV & Bench
Boring
TOTAL Cost A
Seniorage Fees (B)
Seign Board
Cost Including seniorage C
Design & Drawing including vetting @ .7% of C
Sub Total Cost (D)
Centage @ 7 %
Total Cost Of Project
Civil Park
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
TOTAL QTY:-
Foundations, footings, bases of columns, etc. for mass concrete
TOTAL QTY:-
TOTAL QTY:-
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
Below Path Way
TOTAL QTY:-
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
Carriage of Materials
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Amount
Total Carriage Cost
Total Carriage cost with Enhanced 18 % GST (B)
Sub Total C=(A+B)
Boundary Wall
TOTAL QTY:-
TOTAL QTY:-
TOTAL QTY:-
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
TOTAL QTY:-
Foundations, footings, bases of columns, etc. for mass concrete
TOTAL QTY:-
TOTAL QTY:-
TOTAL QTY:-
TOTAL QTY:-
12 mm cement plaster of mix: 1:4(1 cement :4 coarse sand)
TOTAL QTY:-
New work (Two or more coats applied @ 3.28 ltr/ 10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
TOTAL QTY:-
With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works
Two or more coats on new work over an under coat of suitable shade with ordinary pain+ of approved brand and manufacture
Main Campus Gate ( 3m X 2.7m )
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
Carriage of Materials
Local Sand
Coarse Sand
Stone Chips
Bricks
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Carriage Cost
Total Carriage cost with 18 % GST (B)
Total Cost of Scheduled Item C=(A+B)
Toilet Block
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Toilet Block
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
Toilet Block
Foundations, footings, bases of columns, etc. for mass concrete
12 mm cement plaster of mix: 1:4(1 cement :4 coarse sand)
1:3 (1 cement : 3 fine sand)
Thermo-Mechanically Treated bars of grade Fe-500D or more.
TOTAL QTY:-
TOTAL QTY:-
30 mm thick pre laminated PVC door shutters
Sub Total
Sub Total cost with 18 % GST (A)
Carriage of Materials
Local Sand
Coarse Sand
Stone Chips
Bricks
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Amount
Total Carriage Cost
Total Carriage cost with 18 % GST (B)
G/Total (A+B)
Toilet Block (Plumbing)
DPR Prepaired by Using - BCD-2022 & DSR 2023, Gem & Market Rate
PLUMBING & SANITARY
75 mm diameter
110 mm diameter
Coupler 75 mm
Coupler 110 mm
Single tee with door 75x75x75 mm
Single tee with door 110x110x110 mm
Bend 87.5° 75 mm
Bend 87.5° 110 mm
32 mm nominal outer dia Pipes
25 mm nominal outer dia Pipes
20 mm nominal outer dia Pipes
15 mm nominal outer dia Pipes
Supplying, fitting and fixing Toilet fittings with the following items all complete job as per direction of E/I.
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
SOR Electrical = 2022 & GeM Portal
6 A to 32'A, Single pole
2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
16 sq. mm, 4 core
35 sq. mm, 3.5 core
70 sq. mm, 3.5 core
10 sq. mm, 2 core
25 sq. mm, 3.5 core
95 sq. mm, 3.5 core
Total Cost with 18 % GST (A)
1Unit Toilet (Electrical )
Meter
Meter
25mm PVC Conduit
40mm PVC Conduit
5/6 A switch
15/16 A switch
3 pin 5/6 A socket outlet
6 pin 15/16 A socket outlet
3 Module (100mmX75mm)
3 Module (100mmX75mm)
8 Module (125mmX125mm)
12 Module (200mm X 150mm)
Total Cost of Electyrical Work with 18 % GST
Total
BORING
DETAIL OF QUANTITY
BORING
300mm dia
300mm dia
100mm dia
Total cost for Tube well item
Total with 18% GST enhance of 12 % (A)
Seigniorage Fee
Local Sand
Coarse Sand
Total
10% of total
total of sub items
Total of Scheduled items
NON SHEDULED ITEMS
Toilet Plumbing
ELECTRIC ITEMS
Gym & Children Play Equipments
Children Play Equipment
Benches
Dustbins
CCTV & Bench
CCTV Surveillance System
PARK BENCH
GAZEBO
BORING
HORTICULTURE
Quantity Vide item no. (11)in Cum
total of non scheduled items
Design & Drawing including vetting .7% of total
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
Toilet Block
Toilet Block
Column Foundation
G/Total
Toilet Block
Column Foundation
Floor Filling (Male And Female )
G/Total
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
Toilet Block
Column Foundation
G/Total
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Toilet Block
Column Foundation
Padestal
Column
Plinth Beam
G/Total
Quantity Vide Item no.1
Toilet Block
Column Foundation
Padestal
Column
G/Total
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
Toilet Block
Column
Roof Beam
G/Total
Toilet Block
Female
Superstructure
Female
Deduction
Lintle
Door D1
G/Total
Toilet Block
Female
G/Total
Foundations, footings, bases of columns, etc. for mass concrete
Toilet Block
Column Footing
Paestal
G/Total
Toilet Block
G/Total
Toilet Block
Roof Beam
Bottom
Plinth Beam
Lintle Beam
G/Total
Toilet Block
Column
G/Total
12 mm cement plaster of mix: 1:4(1 cement :4 coarse sand)
Toilet Block
Female
Internal Partation
125mm B/w Work below Foundation
Female
Deduction
Ventilation
Bottom S.T
Partation
G/Total
Toilet Block
Internal Partation
125mm B/w Work below Foundation
Female
Deduction
G/Total
floor V level.
Quantity Vide Item no.(15)
G/Total
1:3 (1 cement : 3 fine sand)
Toilet Block
Roof Ceiling
Roof Beam
G/Total
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Quantity Vide Item no.(6+4) in Cum
105kg/cum Of the Quantity
TOTAL QTY:-
Toilet Block
Wall Tile 300 X600
Female
Common
Common
G/Total
Toilet Block
Female
Common
Common
G/Total
Toilet Block
Deduction
G/Total
Exterior Toilet Block
TOTAL QTY:-
Extruded section profile size 42x50 mm
Toilet Block
Deduction
G/Total
30 mm thick pre laminated PVC door shutters
Toilet Block
G/Total
Bottom S.T
Partation
G/ Total
Bottom S.T
Partation
G/ Total
Sub Total
Sub Total cost with 18 % GST (A)
Carriage of Materials
Local Sand
Coarse Sand
Stone Chips
Bricks
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Amount
Total Carriage Cost
Total Carriage cost with 18 % GST (B)
G/Total (A+B)
Say Rs
Material Statements
Local Snad Filling
Brick work 250mm thk (1:6)
Half work (1:3)
Reinforcement
Brick Flat Soiling
Neet Punning
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
Boundary Wall
All Kinds of soil
Column Foundation
Combined Footing
TOTAL QTY:-
Column
Sand Filling
Foundation
Foundation Column
Taper Portion (A1+A2+SQRT A1A2)*h/3-
Combined Footing
Sand Filling
Foundation
Taper Portion (A1+A2+SQRT A1A2)*h/3-
TOTAL QTY:-
Column
Combined Footing
Below the Plinth Beam
TOTAL QTY:-
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
Column
Combined Footing
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Small Footing ( 1050 X 1050 )
Column
Foundation
Padestal Column
Taper Portion (A1+A2+SQRT A1A2)*h/3-
Combined Footing
Padestal Column
Foundation
Taper Portion (A1+A2+SQRT A1A2)*h/3-
RCC Plinth Beam
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
Column
RCC Bend
TOTAL QTY:-
Foundations, footings, bases of columns, etc. for mass concrete
Small Footing ( 1050 X 1050 )
Column
Foundation
Padestal Column
Combined Footing
Padestal Column
Foundation
Small Footing ( 1200 X 1200)
Column
Foundation
Combined Footing
Padestal Column
TOTAL QTY:-
RCC Plinth Beam
RCC Bend
TOTAL QTY:-
Column
TOTAL QTY:-
Quantity Vide Item no. (6+5) in Cum
105.kg/Cum of RCC
TOTAL QTY:-
Length Of Wall
Deduction Column
TOTAL QTY:-
12 mm cement plaster of mix: 1:4(1 cement :4 coarse sand)
Boundary wall { Vertical (2+.3 ) + Top (.125*2)}
TOTAL QTY:-
New work (Two or more coats applied @ 3.28 ltr/ 10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm
Boundary wall { Vertical (1.8+.3 ) + Top (.125*2)}
TOTAL QTY:-
With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works
Total
Two or more coats on new work over an under coat of suitable shade with ordinary pain+ of approved brand and manufacture
Total
Main Campus Gate ( 3m X 2.7m )
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
Carriage of Materials
Local Sand
Coarse Sand
Stone Chips
Bricks
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Carriage Cost
Total Carriage cost with 18 % GST (B)
Total Cost of Scheduled Item C=(A+B)
Grand Total
Material Statements (Boundary Wall )
Local Snad Filling
Brick work 250mm thk (1:4)
Reinforcement
Carriage
Local Sand
Coarse Sand
Brick
Cement
Steel
Extra Cost
Brick
Cement
Total Amount
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
civil work
All Kinds of soil
Street Light
Highmast
G/Total
Highmast
Street Light
Below Path Way
Cycling Track
Foot Pathway
G/Total
Highmast
Street Light
For 1:2:4 PCC Area
Cycling Track
G/Total
Highmast
Column
Sand Filling
Foundation
Foundation Column
TOTAL QTY:-
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size)
Highmast Footing ( 2150X2150) )
Foundation
Padestal Column
Street Light Footing ( 400X400 )
Foundation
TOTAL QTY:-
Foundations, footings, bases of columns, etc. for mass concrete
Highmast Footing ( 2150X2150) )
Foundation
Padestal Column
Street Light Footing ( 400X400 )
Foundation
For 1:4:8 PCC Area
Cycling Track
Foot Pathway
For 1:2:4 PCC Area
Cycling Track
TOTAL QTY:-
Quantity Vide item no. (5)in Cum
105.kg/Cum of RCC
TOTAL QTY:-
1.4.8 (1 Cement :4 coarse sand :8 graded stone agregate 40 mm nominal size)
Below Path Way
Cycling Track
Foot Pathway
TOTAL QTY:-
Foot Pathway
G/Total
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
Carriage of Materials
Local Sand & Earth
Coarse Sand
Stone Chips
Bricks
Cement
Steel
Difference of cost of material
Bricks
Cement
Total Amount
Total Carriage Cost
Total Carriage cost with Enhanced 18 % GST (B)
Sub Total C=(A+B)
HORTICULTURE
Filling
G/Total
Manure
G/Total
Good Earth
Manure
Below Path Way
Cycling Track
Foot Pathway
G/Total
Quantity Vide item no. (11)in Cum
G/Total
Hagdes Beside Cyclin Track
Hagdes Beside Footpath Track
G/Total
Hagdes Beside Cyclin Track
Hagdes Beside Footpath Track
G/Total
Green carpet Area
Deduction
Below Path Way
Cycling Track
Foot Pathway
G/Total
Green carpet Area
G/Total
Total Cost Horticulture work
Total Cost Of Work C+D =E)
Material Statements
Local Sand Filling
Paver Block 60 mm
Steel
Total
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
Toilet Block (Plumbing)
DPR Prepaired by Using - BCD-2022 & DSR 2023, Gem & Market Rate
PLUMBING & SANITARY
75 mm diameter
Internal
Total
110 mm diameter
Internal
G/Total
Coupler 75 mm
Coupler 110 mm
Single tee with door 75x75x75 mm
Single tee with door 110x110x110 mm
Bend 87.5° 75 mm
Bend 87.5° 110 mm
32 mm nominal outer dia Pipes
Total
25 mm nominal outer dia Pipes
Total
20 mm nominal outer dia Pipes
Total
15 mm nominal outer dia Pipes
Total
Supplying, fitting and fixing Toilet fittings with the following items all complete job as per direction of E/I.
Total Cost
Total Cost of Boundary wall with 18 % GST (A)
NON SECHDULE
Total Cost Including GST 18% = B
Total Cost of work (C=A+B)
Say Rs
SOR Electrical = 2022 & GeM Portal
6 A to 32'A, Single pole
2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire
16 sq. mm, 4 core
35 sq. mm, 3.5 core
70 sq. mm, 3.5 core
10 sq. mm, 2 core
25 sq. mm, 3.5 core
95 sq. mm, 3.5 core
Total Cost with 18 % GST (A)
NON SECHDULE ITEM
Total Cost Non schdule with 18 % GST (B)
Total Cost of work C= (A+B)
Say Rs
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
1Unit Toilet (Electrical )
Cafeteria
G/Total
2 X2.5 sq. mm
Cafeteria
G/Total
25mm PVC Conduit
Cafeteria
G/Total
40mm PVC Conduit
Cafeteria
G/Total
5/6 A switch
15/16 A switch
3 pin 5/6 A socket outlet
6 pin 15/16 A socket outlet
3 Module (100mmX75mm)
3 Module (100mmX75mm)
8 Module (125mmX125mm)
12 Module (200mm X 150mm)
Total Cost of Electyrical Work with 18 % GST
Say Rs
NAME OF SCHEME :-: "Beautification & Restoration of Children Park Beldau, Khagaria, Bihar"
Gym & Children Play Equipments
Children Play Equipment
Benches
Total Cost (Including GST 18% )
Total Cost of work (A)
Grand Total Cost
CCTV Surveillance System
PARK BENCH
GAZEBO
Total Cost including GST
DETAIL OF QUANTITY
BORING
300mm dia
300mm dia
100mm dia
Total cost for Tube well item
Total with 18% GST enhance of 12 % (A)
Total Non Schedule Item Cost (B)
Total (A+B)
Grand Total
Seigniorage Fee
Local Sand
Coarse Sand
Total
10 % of Total
NAME OF SCHEME :-: "Beautification Waterfront Rajendra Sarovar Restoration, Khagaria, Bihar"
Carriage Of Material as per BCD 2022
Local Sand/EART {Lead 3Km( 2P + 1K )}
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Bricks {Lead 8Km( 7P + 1K )}
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Kiul Sand to work site {Lead 110Km( 108P + 1K )}
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Cement & Steel Rod { Lead 3 Km( 3P + 0K)}
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Stone Chips (138 KM) Mirza Chowki to Gogri Jamalpur Via Mansi Yard
Mirza Chowki To Mansi Yard
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Paver Block (5Km)
Loading & Unloading
Add 12% GST on X
Add 1% Labour Cess ---
Difference of Cost of 100A B/W w.r.t. BCD
As per RCD 2024
Patna
Muzaffarpur
Munger
Bhagalpur
Darbhanga
Saharsa
Purnea
Saran
Difference of cost of OPC 43 cement w.r.t. BCD
As per RCD 2024
Patna
Muzaffarpur
Munger
Bhagalpur
Darbhanga
Saharsa
Purnea
Saran
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT-05, Khagaria.pdf
NIT • 2.29 MB
NIT-05, Khagaria.pdf
NIT • 2.29 MB
Beldau Children Park Rev-3 14.04.2025.xlsx
NIT • 3.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .