| Sl No | Description | Qty | Unit | SULTHAN ABDUL KADER H1 | SULTHAN ABDUL KHADER NAVASKHAN H2 |
|---|---|---|---|---|---|
| 1.00Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inthe following classification including otherincidental charges such as barricading etcexcluding refilling in hard stiff clay,stiff blackcotton,hard red earth, shales, murram, gravel, stoneyearth and earth mixed with small size bouldersand hard gravelly soil Exculding BT & CC Road Cutting charges etc., complete as directed by the Engineer--in-charge. | |||||
| 1.01 | 110mm HDPE PIPES - PE 100 AS PER IS 4984/2016 | 2,500 | RM | 250 ₹6,25,000 | 111.95 ₹2,79,875 Lowest |
| 2.00Refilling the trenches with excavated earth (other than sand) in layers and watering, ramming and consolidation as per standard specification etc complete and as directed by officers | |||||
| 2.01 | 110mm HDPE PIPES - PE 100 AS PER IS 4984/2016 | 2,500 | RM | 30 ₹75,000 | 22.95 ₹57,375 Lowest |
| 3.00Supplying and conveying to site, the following sizes of HDPE pipes of class PN6 (PE-100) confirming to IS:4984/1995, as specified in Technical specifications in standard lengths including labour charges for loading, unloading and stacking at site and transportation charges etc., complete as per standard specifications and as directed by the Departmental Engineer.(TWAD SOR-2023-24,Pg.No-29) | |||||
| 3.01 | 110mm HDPE PIPES - PE 100 AS PER IS 4984/2016 | 2,500 | RM | 400 ₹10,00,000 | 360.71 ₹9,01,775 Lowest |
| 4.00Lowering the following pipes and specials into trench and laying to proper grade and alignment complete as per standard specifications and as directed by the Departmental Engineer. | |||||
| 4.01 | 110mm HDPE PIPES - PE 100 AS PER IS 4984/2016 | 2,500 | RM | 24 ₹60,000 | 16.18 ₹40,450 Lowest |
| 5.00Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and asper IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by Departmental Engineer.(TWAD SOR-2023-24,Pg.No-279) | |||||
| 5.01 | 110mm HDPE PIPES - PE 100 AS PER IS 4984/2016 | 200 | Nos | 250 ₹50,000 | 189.49 ₹37,898 Lowest |
Tender Value
₹16.4 L
EMD Value
₹16,400
Closing Date
9 Sept 2024, 3:00 pmClosed
Commissioner, Adirampattinam Municipality
Municipal Office, Adirampattinam
Extention of Main Distribution Pipe Line at Mariyamman Kovil (Elango Nagar) in Adiramapttinam Municipality
2024_MAWS_477987_1
1133/2024 E1
Open Tender
Civil Works
Lump-sum
90 days
ADIRAMPATTINAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹16,400
Yes
5 Nov 2025
29 Aug 2024
9 Sept 2024
29 Aug 2024
9 Sept 2024
29 Aug 2024
Amount
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m inthe following classification including otherincidental charges such as barricading etcexcluding refilling in hard stiff clay,stiff blackcotton,hard red earth, shales, murram, gravel, stoneyearth and earth mixed with small size bouldersand hard gravelly soil Exculding BT & CC Road Cutting charges etc., complete as directed by the Engineer--in-charge.
110mm HDPE PIPES - PE 100 AS PER IS 4984/2016
Refilling the trenches with excavated earth (other than sand) in layers and watering, ramming and consolidation as per standard specification etc complete and as directed by officers
110mm HDPE PIPES - PE 100 AS PER IS 4984/2016
Supplying and conveying to site, the following sizes of HDPE pipes of class PN6 (PE-100) confirming to IS:4984/1995, as specified in Technical specifications in standard lengths including labour charges for loading, unloading and stacking at site and transportation charges etc., complete as per standard specifications and as directed by the Departmental Engineer.(TWAD SOR-2023-24,Pg.No-29)
110mm HDPE PIPES - PE 100 AS PER IS 4984/2016
Lowering the following pipes and specials into trench and laying to proper grade and alignment complete as per standard specifications and as directed by the Departmental Engineer.
110mm HDPE PIPES - PE 100 AS PER IS 4984/2016
Jointing HDPE Pipes and Specials by butt fusion welding / electro fusion welding joints using fusion equipment as per ISO 21307-2011 and asper IS 7634 (part-2) : 2012 including cost of hire charges for butt fusion equipment power supply arrangements etc., complete as per directed by Departmental Engineer.(TWAD SOR-2023-24,Pg.No-279)
110mm HDPE PIPES - PE 100 AS PER IS 4984/2016
Supply, delivery of HDPE Specials As Per IS 1736-1995 including unloading, transportation and stacking charges.Specials for HDPE pipes as per IS 8360/1977/ Part I(Reaffirmed 1992) Part II and III (Reaffirmed 2002). Reaffirmed to IS 4984-2016 conveyance to work site etc., complete as directed by the Engineer charge. (TWAD SOR-2023-24,Pg.No-32).
110mm HDPE Bend
110mm HDPE Equal Tee
110mm HDPE End cap
SULTHAN ABDUL KHADER NAVASKHAN (BID ID -1131540)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .