Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance KHALISANI ULUBERIA HOWRAH PIN 711307 | ULUBERIA | HOWRAH | WEST BENGAL | 711307 | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 L+₹749.34 (0.30%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.5 L+₹999.12 (0.40%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical VILL CHENGAIL PO CHENGAIL P S ULUBERIA DIST HOWRAH PIN 711308 | ULUBERIA | HOWRAH | WEST BENGAL | 711308 | - | Rejected-Technical As per NIeT |
Tender Value
₹2.5 L
EMD Value
₹4,996
Closing Date
12 Sept 2026, 1:00 pmClosed
Executive Engineer,Howrah Division, PWD
Howrah Division, PWD, Onkarmal Jetia Road, Howrah
Road side jungle cutting and flank dressing work at Nimdighi Basudevpur Road from 2.00 km to 6.50 km under Howrah Division, PWD during the year 2026-27.
2026_WBPWD_5021635_1
WBPWD/EE/HD/NIeT_46/2026_27
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
15 days
Howrah Division, PWD, Onkarmal Jetia Road
Pl. refer Tender Documents
4 documents required · 4 mandatory
₹4,996
3 Oct 2026
3 Sept 2026
14 Sept 2026
4 Sept 2026
12 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land
including uprooting rank vegetationgrass, bushes, shrubs, saplings and treegirth up to 300 mm, removal of stumpof trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or
auctioned, up to a lead of 1000 metreincluding removal and disposal of top
organic soil not exceeding 150 mm in
thickness. (Reference to MoRT&H'specification clause 201) 3(II) By Mechanical Means
3(II)(A) In area of light jungle | 0.63 | Hectare | 50,633.31 | ₹31,898.99 |
| 2 | Maintenance of Earthen Shoulder
(filling with fresh soil)
Making up
irregularities/loss of
material on shoulder to the design
level by adding fresh approved soil
and compacting it with appropriate
equipment as per the requirement
of MORT&H's specification 3003. | 3,037.5 | Sqm | 47.78 | ₹1,45,131.75 |
| 3 | Maintenance of Earth Shoulder
(stripping excess soil)
Stripping excess soil from the
shoulder surface to achieve the
approved level and compacting with
plate compactor as per the
requirement of MORT&H's
specification 3003. | 2,025 | Sqm | 17.11 | ₹34,647.75 |
| 4 | GST @18% Sl no 1 to 3 | - | INR | 0.18 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_5100450.xls
BOQ • 0.29 MB
2911.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .