Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 LAccepted-AOC OFF EASTERN EXPRESS HIGHWAY 6TH FLOOR 6 603 FLOWER VALLEY NITIN CADBURY FLYOVER KHOPAT THANE 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹38.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹38.9 LRejected-AOC | ₹38.9 L | L2 | Rejected-AOC L2 |
| 3 | L3Rejected-AOC 502 FLOWER VALLEY COMPLEX EASTERN EXPRESS HIGHWAY NEAR BANTA COMPOUND KHOPAT THANE WEST 400601 | THANE | THANE | MAHARASHTRA | 400601 | - | L3 | Rejected-AOC L3 |
Tender Value
₹38.1 L
EMD Value
₹38,200
Closing Date
11 May 2026, 11:00 amClosed
Superintending Engineer, MIDC Circle Office, CSN
Superintending Engineer, MIDC Circle Office, CSN
Providing Specialized treatment to the Effluent sump No.-4 at Waluj Industrial Area.
2026_MIDC_1299750_1
05/A/09
Open Tender
Civil Works
Percentage
CSN
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹38,200
22 Aug 2026
2 May 2026
13 May 2026
2 May 2026
11 May 2026
6 May 2026
2 May 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the sludge from effluent sump or from any other ancillary structure such as screen and grit chambers, by mechanical means or manually for all depths. Lift and lead upto 100 m from the edge of sump or structure including stacking the sludge as directed. Item includes cost of all mechnical equipments, labour, fuel, safety devices, tools and plants. | 87 | Per Cubic Meter | 370 | ₹32,190 |
| 2 | Removing lime or cement plaster including disposing off the spoils as directed with all leads & lifts. | 750 | Square Meter | 52 | ₹39,000 |
| 3 | Providing and applying RP-100 polymer modified repair plaster a high quality polymer modified cement based ready mixed plaster mortar, which has a very high strength and is crack resistant and has good adhesion to all concrete, including all cost of labour and material as per directions of Engineer-In-Charge etc.complete. | 112.5 | Square Meter | 2,540 | ₹2,85,750 |
| 4 | Providing and applying flexible coating of CW 100 to provide flexible water proof barrier on the cementitious surface to provide anti carbonation and to withstand high hydrostatic pressure including all cost direction of Engineer-In- charge etc. complete | 750 | Square Meter | 1,135 | ₹8,51,250 |
| 5 | Providing and applying two coast of EP PLUS 800 (HIGH BUILT EPOXY COATING) it can be applied to most of surfaces to provide waterproof , dust proof and hard wearing surface with excellent chemical resistance. Mixing ratio of resin and hardem is 88:12 the finish surface should be smooth and semi glossy. Film thickness 125-150 microns per coat . Packaging of material is of 5 to 25 Kg etc. complete. | 750 | Square Meter | 3,475 | ₹26,06,250 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
TenderDocument.pdf
Tender Documents • 0.36 MB
BOQ_2232003.xls
BOQ • 0.29 MB
ItemSpecification.pdf
Other Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].