Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.6 LAccepted-AOC 1207 SECTOR 9 A 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 1 | Accepted-AOC Work Allotted | |
| 2 | 2₹29.0 L+₹1.4 L (5.04%)Rejected-Finance H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹30.5 L+₹2.9 L (10.4%)Rejected-Finance KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | 3 | Rejected-Finance 3 | |
| 4 | Not Admitted-Fee/PreQual/Technical G 84 NEW PALAM VIHAR PHASE 1 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Parveen kumar Contractor L3 | M/S DDR Buildtech L2 | LAKHAN INFRA CONSTRUCTIONS PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and making saw cut transverse construction /contraction joint as per approved drawing provided at a maximum distance of 4.5 m including the cost of covering of dowel bars with the plastic sheath for at least 60% of the length from one end. Initially 3 to 4 mm wide cut shall be made after 1 to 2 days up to 1/3rd depth of slab and including cost of scaling
temporarily with a jute rope. At the time of sealing of the joint temporary seal shall be taken out and 5 mm wide grove shall be
make up to a depth of 5 mm. Before sealing the joint temporary with a jute rope. At the time of sealing temporarily seal shall be
taken out and 10 and 12 mm. Before sealing the joint 5 mm thick compressible de-boding strips with paper back shall be
inserted to the bottom of the groove. The groove shall be filled with poly sulphide/silicon sealant. The sealant shall be applied slightly at a lower level than the slab with a tolerance of 24 mm complete in all respect` | 200 | Metre | 300 ₹60,000 | 250 ₹50,000 | 5 ₹1,000 Lowest |
| 2.00 | Making connection of sewer line with existing sewer line of dia 600 mm complete in all respect. | 3 | Each | 9,000 ₹27,000 | 8,000 ₹24,000 Lowest | 25,000 ₹75,000 |
| 3.00 | Making house connection of water supply damaged during excavation. | 95 | Nos. | 900 ₹85,500 | 800 ₹76,000 Lowest | 1,000 ₹95,000 |
| 4.00 | Making house connection of sewer line damaged during excavation. | 95 | Nos. | 900 ₹85,500 | 850 ₹80,750 Lowest | 1,000 ₹95,000 |
| 5.00 | Diversion of sewerage water through pumping | 60 | Per day | 4,000 ₹2,40,000 | 3,300 ₹1,98,000 | 2,250 ₹1,35,000 Lowest |
Tender Value
₹26.3 L
EMD Value
₹52,700
Closing Date
23 Mar 2026, 12:00 pmClosed
Tushar Yadav
Municipal Corporation Gurugram
Construction of road with RMC, Providing and laying of Sewer line and water line house no. 133/4 to 149/4, 70/4 to 78/4 and budhi raja park to tikona park 4 marla ward no. 29 Div 2B under MCG. Recall
2026_HRY_508498_1
2026A966CC19 5479 4E96 8D03 CFAC3D0ED52A285ULB
Open Tender
Civil Works
Works
120 days
Gurugram
As per CBD
2 documents required · 2 mandatory
₹2,000
₹52,700
Yes
9 Apr 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and making saw cut transverse construction /contraction joint as per approved drawing provided at a maximum distance of 4.5 m including the cost of covering of dowel bars with the plastic sheath for at least 60% of the length from one end. Initially 3 to 4 mm wide cut shall be made after 1 to 2 days up to 1/3rd depth of slab and including cost of scaling
temporarily with a jute rope. At the time of sealing of the joint temporary seal shall be taken out and 5 mm wide grove shall be
make up to a depth of 5 mm. Before sealing the joint temporary with a jute rope. At the time of sealing temporarily seal shall be
taken out and 10 and 12 mm. Before sealing the joint 5 mm thick compressible de-boding strips with paper back shall be
inserted to the bottom of the groove. The groove shall be filled with poly sulphide/silicon sealant. The sealant shall be applied slightly at a lower level than the slab with a tolerance of 24 mm complete in all respect` | 200 | Metre | - | - |
| 2 | Making connection of sewer line with existing sewer line of dia 600 mm complete in all respect. | 3 | Each | - | - |
| 3 | Making house connection of water supply damaged during excavation. | 95 | Nos. | - | - |
| 4 | Making house connection of sewer line damaged during excavation. | 95 | Nos. | - | - |
| 5 | Diversion of sewerage water through pumping | 60 | Per day | - | - |
stage.html
html • 0.05 MB
techsummary_587271.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_587271.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .