Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | Admitted-Finance |
| 2 | Admitted-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
| 3 | Admitted-Finance B 1 1ST FLOOR AL SHAMS RESIDENCY KANKE ROAD NEAR CHANDANI CHOWK BHITHA RANCHI JHARKHAND 834008 | RANCHI | JHARKHAND | 834008 | Admitted-Finance |
| 4 | Rejected-Technical COAL ROAD PTPS PATRATU | Rejected-Technical PQC NOT QUALIFIED |
Tender Value
₹88.2 L
EMD Value
₹1.5 L
Closing Date
7 Aug 2024, 4:00 pmClosed
Superintending Engineer
Superintending Engineer OAndMC2, 3X210 MW, ATPS, Anpara
Maintenance contract of boiler pressure parts, Servicing of HP/LP Valves and associated work for units of subcritical boiler of all three units of 3x210 M.W ATPS, Anpara
2024_RVUNL_937688_1
N-ANP/A/OMC2/BMD1/6000004263
Open Tender
Power/Energy Projects/Products
Item Rate
365 days
Anpara
As per Tender Document
3 documents required · 3 mandatory
₹1,180
Dy.Chief Finance and Account Officer,Anpara
₹1.5 L
10 Sept 2024
11 Jul 2024
9 Aug 2024
11 Jul 2024
7 Aug 2024
11 Jul 2024
Amount
Inspection of pressure parts, tightening of glands of valves & bolts of flanges, minor rectification of dozing pumps, cleaning of oil guns, attending coal leakage from elbow, nozzle etc.(One shift in all three unit is treated as one job)
Removal of accumulated soot from heating surface by operating wall blower No. 01 to 56 from local panels of boiler of unit No. 01, 2 & 3.Frequency:- daily/unit(operation of one unit is treated as one job)
Removal of accumulated soot from heating surface by operating LRSB No. 57 to 80 from local panels of boiler of unit No. 01, 2 & 3. Frequency: - twice a week/unit Unit No. -1: Monday, Thursday. Unit No.-2: Tuesday, Friday. Unit No.-3: Wednesday, Saturday. (operation of one unit is treated as one job)
Routine Maintenance of wall blowers and LRSB’s of Boiler of unit No. 01, 02 &03. Frequency- as follows: Monday: Unit#1 wall blower Tuesday: Unit#2 wall blower Wednesday: Unit#3 wall blower Thursday: Unit#1 LRSB Friday: Unit#2 LRSB Saturday: Unit#3 LRSB
Complete servicing repairing/replacement of jammed/ damaged wall blowers of unit no.1, 2 & 3 for their smooth operation as and when required.
Complete servicing repairing/replacement of jammed/ damaged long retractable soot blowers of unit no.1.2 &3 for their smooth operation as and when required
Complete servicing /repairing/replacement of steam valves of wall blowers & LRSB’s of unit no.1.2 &3 for their smooth operation as and when required
Mobilization the team & attending the leakages of pressure parts in different zones of Boiler up to ten joints.
Replacement of eroded /damaged tubes/bends of pressure parts in different zones of Boiler during preventive maintenance or after 10 joints during attending leakages.
Fixing of sky climber in boiler furnace after making proper platform on bottom ash hopper, its operation during execution of the works and dismantling and removal of ash hopper platform after completion of jobs. Rates should be quoted on as per job basis.
Shifting of sky climber in boiler furnace at different location for attending and inspection of various pressure part zones. Rate should be quoted on as per job basis.
Erection of Scaffolding and plate form in Economizer hopper (above)
Erection of Scaffolding and plate form in S-Panel & bottom ash hopper
Erection of Scaffolding and plate form in Reheater inlet & outlet
Erection of Scaffolding and plate form Water wall screen tube / final super heater / super heater screen tube
Erection of Scaffolding and plate form in Platen super heater tube zone
Stitch Welding of fins of water / steam cool wall for securing of respective positions of tubes
Build up of eroded portion of the tubes caused by ash / steam erosion using suitable welding electrodes matching with parent metal composition. Depth of erosion up to 2.5 mm, length of erosion up to 250 mm
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Carbon Steel
Fabrication of Hot bends of various degrees and radius of curvature from straight pressure parts tubes by filling sand and heating gas to required temperature of Alloy Steel.
Removal of damaged U clamps and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.
Removal of damaged Scallop bars and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.
Removal of damaged Binders, support band, lugs and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.
Removal of damaged Flexible connectors (male/female) and replacement/ refitting of the same with new/repaired one in different zones of the pressure parts.
Rectification / replacement of tubular (half round) in the following pressure part zones.
Rectification / replacement of box type Protector /Cassette baffles found damaged / eroded / dislocated in in the following pressure part zones.
Lifting and taking out the complete coils in pair of LTSH horizontal coils (upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil
Lifting and taking out the complete coils of Economizer (upper or lower) after cutting clamps supports, clits, stoppers and releasing from subsequent headers and coil & their restoration after placement of coil
Rectification of Buck Stay / Putting buck stay pin on its position in second pass of Boiler / corner No.1, 2, 3 & 4
Cutting and removal of skin casing / high crown plate by grinder and welding the same with suitable electrode by High pressure welding method, after completion of repair jobs of pressure parts if any of Thickness - up to 15 mm
Cutting and removal of skin casing / high crown plate by grinder and welding the same with suitable electrode by High pressure welding method, after completion of repair jobs of pressure parts if any of Thickness -16 mm or above
Repairing/replacement of skin casing plates, expansion plates of one pannel complete of boiler roof in pent house above sealing Super heater from drum to platen superheater tubes.
Repairing/replacement of skin casing plates, expansion plates of 1/5th pannel complete of boiler roof in pent house above sealing Super heater tubes from drum to platen superheater tubes.
Repairing/replacement of casing plates pannel of platen superheaters, reheaters of pent house of boiler.
Repairing/replacement of damaged side plate below/side of boiler drum by cutting, grinding and welding with suitable electrode
Repairing/replacement of damaged skin casing plates in second pass by cutting, grinding and welding with suitable electrode
System line up for filling of feed water through Boiler Fill Pumps & Pressurization of pressure parts of Boiler Feed pump for hydraulic Test of Boiler, Normalization of the same after hydraulic Test and Making system ready for Light-up.
Servicing of feed line gate control valves NRV size NB- 300mm NP-250 Kg./ cm² valves covered are E-1, E-2, BF-29, 30,33,34,37&BF-38.
Servicing of low load line gate & control valves size NB-200mm NP-250Kg/ cm² valves covered are BF-31, 32,35,36,39 & BF-40
Servicing of Pneumatically operated S/H, R/H attemperation control valves & RH Spray block valves.
Servicing of main Isolating valve BF-61 at the inlet of SH spray station, size: Nb- 150mm, NP-250Kg / cm²
Servicing of main isolating valve of main steam line (L&R) M.S.-29 & M.S.-30,Nb-250mm, NP-250Kg/ cm²
Servicing bypass valves of main steam valves, MS-29A, and MS-30A, Nb-25mm, NP-250Kg/ cm²
Servicing of bypass valves of feed station, low load line valve and main isolation valve of inlet to SH-Nb-25mm, NP-250Kg/cm².
Servicing of boiler drum safety valves and safety valve on main steam line on right hand side of boiler at 52meter elevation
Servicing of electromagnetic relief valve (implies safety valve).
Servicing of safety valves installed on hot reheat and cold reheat line at about 50meter elevation.
Servicing of safety valve on soot blower line at 52mtr elevation
Servicing of high-pressure valve & NRV’s at different elevation from ‘0’meter level to 54 meter level, in dozing hall nominal bore may vary from Ø10mm to Ø100mm.
Replacement of H.P. Valves/NRV of sizes-Nb-10 / 15 / 25mm (H/ O, M/O) at different floors from ‘0’meter level to 54meter level, Dozing hall and at Dearator floor by cutting of damaged valve and welding of new valve after its revisioning.
Servicing/replacement of hydra motor valves of oil station at AB / CD / EF elevation
Servicing of oil line valves and NRV’s of oil station at AB / CD / EF elevation of boiler
Servicing/overhauling of pneumatic operated dia150mm/dia 250mm valves on Aux. PRDS line and Dearator.
Servicing /overhauling of electrically drive steam valve dia 100mm to 250mm on Aux. PRDS line
Servicing/overhauling of electrically driven Nb- 400mm gate valve at Dearator
Servicing/overhauling of electrically drove Nb- 50mm valves on Aux. PRDS line.
Servicing/overhauling of pneumatic operated control valve size 50 to 100mm
Servicing/overhauling of hand operated valve/NRV’s of size 150 to 250mm
Servicing /overhauling of hand operated valves /NRV’s of size 300/350 mm.
Servicing and revisioning of steam valves & NRV’s of Aux. PRDS line and Dearator. Rate to be quoted per mm basis.
Changing flange gaskets of valves & flange at different elevation of boiler. Rate should be quoted on per MM basis
Replacement of gland packing with new one from valves leaking from glands. Rate should be quoted on per MM basis.
Replacement of various safety valves of critical piping such as Boiler Drum, Super Heater, CRH, HRH, etc
Replacement of 150 mm Motorized Valve (PRDS (BiG), BF-61 and similar Valves)
Replacement of 100 mm Motorized Valve (PRDS (small) and similar Valve )
Attending leakages of pipeline & headers etc. of main boiler, Dearator and aux. PRDS of 3x210 MW by cutting grinding and H.P. welding of damaged portion putting new spools/bends if required.
Servicing/overhauling of pneumatically operated actuators of valve. Size dia 40 to 100mm.
Servicing/overhauling of pneumatically operated actuators of valves size dia 202 to 300mm
Fabrication of H.P. drip/drain line bends out of available pipe by cutting, grinding & H.P. welding.
Servicing / Replacement/overhauling of safety valve of Aux. PRDS.
Servicing/Replacement/overhauling of safety valves of Dearator/CBD Tank/Pegging Line.
Blanking of hot reheat and cold reheat NRV by blanking device & normalizing the same
Replacement of H.P. valves /NRV of size 100 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision
Replacement of H.P. valves /NRV of size 150 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision
Replacement of H.P. valves /NRV of size 200 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision
Replacement of H.P. valves /NRV of size 250 mm at Dearator floor by cutting of damaged valves/NRV and welding with New/repaired valve/NRV after its revision
Replacement of H.P. valve (H/O, M/O, Pneumatic)/ NRV of the following sizes at Dearator floor of flange end Type by opening Nut and Bolts of flange and installation of new /repaired valves/NRV on it properly after replacement of gasket and servicing of valve. size 200 / 250mm valve / NRV
Replacement of start up vents (R /H & S / H) at 54-mtr elevation
Replacement of high Pressure valves (motor operated / hand operated/Pneumatic) of critical piping of Boiler of size:Nb-40mm to 65mm
Replacement of Electrical / Pneumatic actuators of valve size up to Nb-300mm at different elevations;
Replacement of H.P. drain/drip pipes of size Nb-200mm, Thickness- 6mm, Material- Carbon Steel. Rate will be quoted on joint basis.
Replacement of H.P. drain/drip pipes of size Nb-150 mm, Thickness- 8mm, Material- Carbon Steel. Rate will be quoted on joint basis.
Replacement of 150 mm PRDS Control Valve
Replacement of 100 mm PRDS Control Valve.
Replacement of DSH of PRDS line
Servicing /revisioning of gear box of Phosphate dozing Pump
Servicing / revisioning of gear box of hydrazine dozing Pump
Servicing of Phosphate dozing pump (Suction & Discharge NRV of pump body)
Servicing of hydrazine dozing pump (Suction & Discharge NRV of pump body)
Servicing of pressure relief valve of phosphate / hydrazine dozing pumps
Complete cleaning & removal of foreign materials from phosphate metering, temporary preparation tanks and their strainers. Its servicing and back washing of M/ tank.
Complete cleaning & removal of foreign materials from Hydrazine metering, temporary preparation tanks and their strainers. Its servicing and back washing of M/ tank
Cleaning / flushing of pipe lines of phosphate / hydrazine dozing system to remove any chocking in the system
Repairing/Reconditioning of 100mm, class 1500, flange end, Deaerator (D/A) drain valve
Repairing/Reconditioning of 18 ata 250 NB, C.C.S. gate valve, flanged end, hand operated valves.
Repairing/Reconditioning of 200 mm, C.C.S. gate valve, BW, flanged end, class-300, hand operated valve
Repairing/Reconditioning of 150 mm, C.C.S. gate valve, BW, flanged end, class-600, hand operated valve.
Repairing/Reconditioning of150 mm, BFP recirculation gear operated hand valve, BW, class-2500, seat & disc.
Repairing/Reconditioning of 150 mm, class -600, lift check valve(NRV)
Repairing/Reconditioning of 200 mm,class -600, BW, swing check valve (NRV).
Repairing/Reconditioning of 250 mm, class-600, BW, swing check valve (NRV).
Repairing/Reconditioning of Superheater/ Reheater startup vent, size-100 mm, class-2500.
Repairing/Reconditioning of Superheater spray control valve and M/O valve & R/H spray block valve.
Repairing/Reconditioning of Boiler drum air vents & similar valve size-65mm glove.
Repairing/Reconditioning of R/H spray control valve and M/O valve
Inspection & removal of minor defects of Deaerator
Repairing of manholes of boiler
Repairing of peepholes of Boilers
Servicing /replacement of spring hangers, supports Anchors and restraints of boiler critical piping & ducts and resetting the spring hangers on cold set values
Replacement of coal nozzle assembly complete (coal nozzle and adj. coal nozzle tip / seal plate) with new or repaired one
Repairing / servicing of burner tilting lever.
Replacement of coal inlet elbows (long / short )
Servicing / repairing / replacement of gun guide assembly at AB, CD and EF elevation
Replacement / Servicing of Igniter guide assembly at AB, CD and EF elevation
Repairing of wind box (L&R).
Servicing of S/A dampers in wind box (L&R).
Repairing / Servicing of scanner guide assembly
Repairing / Servicing of scanner air fan.
Attending coal dust leakages from FI Elbow / Coal Nozzle casting by Patch Welding
Repairing & Hard facing of S.S. Adjustable Coal Nozzle Tips.
Repairing and Hard facing of Coal Nozzle Casting
Hard facing of Coal Nozzle Casting
Repairing and Hard facing of Fuel Inlet Elbows.
Repairing of oil gun assembly.
Erection / repair of grating at different elevation of boiler and other places
Fabrication and erection of steel structure work vize chute, plate form stair at boiler side.
Repairing / replacement of plate-form railing in boiler side.
Cleaning of Cold PA ducts (left and right) from P.A. fans outlet dampers to APH.
Cleaning of Cold SA ducts (left and right) from S.A. fans outlet dampers to APH.
Cleaning of Dog House.
Cleaning of Hot SA duct (Right)
Cleaning of Hot SA duct (Left)
Cleaning of Wind Box (Right)
Cleaning of Wind Box (Left)
Cleaning of Gooseneck cat house front and rear.
Cleaning of Economiser chamber of boiler
Cleaning of gallery between Reheater and arch tubes.
Cleaning of gallery between exit super heater and hangers tubes to conv. super heater
Cleaning of second pass (LTSH)
Cleaning of from water wall of first pass (furnace) from ‘0’ meters to 48 meters elevation.
Cleaning of Pent house above furnace.
Cleaning of gallery between platen super heater and cold reheat headers in pent house.
Cleaning between exit super heater and convector super heater headers in pent house.
Cleaning of space between header No.10 & rear sidewall in pent house.
Cleaning of gallery between cold reheat headers in pent house.
Cleaning of gallery in left and right of pent house between water wall and skin casing.
Cleaning of Space below boiler drum between front water wall and front drum houseman hole.
Cleaning second pass of pent house (above ceiling tube of pent house)
Cleaning of all four Economiser hoppers.
Cleaning of all the four flue gas ducts from air pre-heater to ESP inlet.
Cleaning of inter connecting duct of flue gas at ESP inlet.
Cleaning of flue gas duct hopper just before and after F.G.-3 and F.G.-4 dampers.
Cleaning and removal of accumulated fly ashes / foreign materials / debris / scraps etc. from the boiler roof and its disposal to ‘0’Mtr.level boiler and from ‘0’Mtr. to dumping yard.
M/S K K POWER CONSTRUCTION
TECHNO HITECH PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .