| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.8 LRejected-Finance | ₹33.8 L | L1 | Rejected-Finance REJECT |
| 2 | L2₹34.3 LRejected-Finance | ₹34.3 L | L2 | Rejected-Finance REJECT |
| Sl No | Description | Qty | Unit | M.R.K.Construction L2 | G.Sunil Kumar L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | |||||
| 2.00 | Footing | 92.88 | cum | 20.3 ₹1,885.46 | 20 ₹1,857.6 |
| 3.00 | Plinth Beam | 70.81 | cum | 103.45 ₹7,325.2 | 90 ₹6,372.89 |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 9.86 | cum | 1,591.52 ₹15,699.6 | 1,568 ₹15,467.58 |
| 5.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 9.86 | cum | 5,513.68 ₹54,389.89 | 5,432.2 ₹53,586.1 |
| 6.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 7.00 | Column | 532.42 | sqm | 1,409.23 ₹7,50,294.47 | 1,388.4 ₹7,39,206.37 |
| 8.00 | Plinth Beam | 78 | sqm | 354.68 ₹27,665.14 | 349.44 ₹27,256.29 |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 2,126.77 | Kg | 94.62 ₹2,01,231.59 | 93.22 ₹1,98,257.72 |
| 10.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 85.07 | cum | 8,701.7 ₹7,40,261.11 | 8,573.1 ₹7,29,321.29 |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
31 Jul 2025, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION AVADI
Construction of Compound wall and providing Paver Block at Kavarapalayam Community hall in ward 22.
2025_MAWS_587135_1
Roc No.4661/2025/E1/Z4/1
Open Tender
Civil Works
90 days
ward 22.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,000
21 May 2026
30 Jul 2025
31 Jul 2025
30 Jul 2025
31 Jul 2025
30 Jul 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_701310.xls
BOQ • 0.24 MB
BID.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid