Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC | ₹39.8 L Quoted ₹33.8 L | L1 | Accepted-AOC 1st Lowest amount |
| 2 | L2₹33.8 LRejected-Finance | ₹33.8 L | L2 | Rejected-Finance 2nd Lowest amount |
| 3 | L2₹33.8 LRejected-Finance | ₹33.8 L | L2 | Rejected-Finance 2nd Lowest amount |
Tender Value
₹39.8 L
EMD Value
₹3.4 L
Closing Date
12 May 2026, 3:00 pmClosed
E.O.
NPP Jaunpur
Civil work 14
2026_DOLBU_1143163_14
190/8-Nirman
Open Tender
Civil Works
NPP Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,485
E.O.
₹3.4 L
29 Jun 2026
29 Apr 2026
12 May 2026
29 Apr 2026
12 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all T&P. | 825.81 | Cum | 189 | ₹1,56,078.09 |
| 2 | Concrete with 4cm gauge brick ballest, fine local sand of 1.25FM and cement in proportion of 12:6:1 in foundation and under floor including supply of all materials labour T&P etc require for proper complete of the work | 75.22 | Cum | 4,746.12 | ₹3,57,003.15 |
| 3 | Close timbering in case of shafts, well cesspits, manholes and the like including strutting shoring and packing cavities etc all complete. | 876 | sqm | 99.4 | ₹87,074.4 |
| 4 | Supply and spreading of fine sand in base of sewer pipe including all complete. | 32.85 | Cum | 850 | ₹27,922.5 |
| 5 | Supply and laying of 1000mm dia RCC hume pipe NP3 including all complete. | 219 | rmt | 7,100 | ₹15,54,900 |
| 6 | Carriage of 750mm dia RCC hume pipe NP3 including all complete. | 219 | rmt | 73.5 | ₹16,096.5 |
| 7 | Construction of brick masonary manhole coverd with heavy dutty chamber cover having battom dia 2700mm and top dia 900mm including all complete | 7 | rmt | 32,500 | ₹2,27,500 |
| 8 | M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants, ect, required for proper completion of work. | 27.98 | Cum | 6,805.4 | ₹1,90,415.09 |
| 9 | Providing 12 mm thick 1:3 Plaster with cement and coarse sand mortar. | 54.75 | sqm | 175.5 | ₹9,608.63 |
| 10 | Providing and laying P.C.C. 1:2:4 cement concrete with cement, Coarse Sand and 20 mm Stone ballast in the base. | 0.45 | Cum | 7,996.1 | ₹3,598.25 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2135237.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid