| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-Finance | 1 | Accepted-Finance correct BOQ uploaded | |
| 2 | 2₹17.6 L+₹2.7 L (18.2%)Accepted-Finance | 2 | Accepted-Finance correct BOQ uploaded |
Tender Value
₹15.4 L
EMD Value
₹30,845
Closing Date
15 Jul 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
LPWD Division office Amini
Construction of 1 No water collection sump (1,50,000 Ltr capacity) with pump house for LTTD plant at Chetlat
2020_UTL_1165_1
NIT NO 49/EE/LPWD/AMN/2019-20
Open Tender
Civil Works - Buildings
Item Rate
90 days
Amini Island
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, LPWD Amini
₹30,845
22 Jul 2020
6 Jul 2020
16 Jul 2020
6 Jul 2020
15 Jul 2020
6 Jul 2020
90 days
Amount
Surface dressing of the ground including removing vegitation and in equalities not exceeding 15cm deep and disposal of rubbish lead up to 50meter and lift up to 15 meter.(Labour Element)
Earth work excavation by manual means in foundation trenches or drains (not exceeding 1.5m width or 10sqm on plan) including dressing of sides and ramming of bottom,lift up to 1.5,including getting out othe excavated soil and disposal of surplus excavated soil as dirdcted ,withinm a lead of 50mtr. Ordinary Soil (Labour Element)
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundation etc layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead up to 50mtr and lift up to 1.5mtr.(Labour Element)
Providing and laying cement concrete 1:4:8 (1cement :4 M.sand :8 Granite chips) foundation and plinth .(Labour Element)
Reinforced cemnt concrete 1:1:5:3(1cement 1.5 M. sand :3granite chips 20mm nominal size ) excluding cost of cenring shuttering and reinforcement all work up to plinth level.(LE)
a) Foundation footings bases of column etc,and mass concrete.
Reinforced cement concret working (wall any thickness) including attached pilasters ,buttresses plinth and string course, fillets, column, pillars, piers ,abutments,post and struts etc..up to floor five level excluding cost of centering and shuttering finishing and reinforcement.1:1.5:3(1 cement 1.5 M. sand :3 granite chips 20 mm nominal size )(Labour Element)
Reinforced cement concrete work in beams ,suspended floors ,roofs,having slope up to 15 degree landing ,shelves chejjas,lintels ,bands,palin window sills,staircase and spiral staircase up to five level excluding cost of centering and shuttering finishing and reinforcemetn with 1:1.5:3(1cement 1.5 M.sand :3graded stone sggregate 20mm nominal size).(Labour Element)
Providing and fixing pre-cast cement concrete 1:2:4(1 cement: 2 M.Sand: 4 graded stone aggregate 20 mm nominal size) set in position with cement mortar 1:2 (1 cement: 2 coarse sand) and finished smooth with 6mm thick cement plaster 1:3 (1cement: 3 fine sand) on exposed surfaces including centering and shuttering in -.(Labour Element)
Centering and shuttering including strutting propping etc and removal of form work for Foundation footings bases of column etc,and mass concrete..(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work for walls (any thickness) including attached pilastrs, buttressess, plinth and string.(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work for Suspended floors,roofs,landings,balconies and acess plat form.(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work for Lintels,beams,plinth beams,girders.bressumers and cantilevers.(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work for Column,piller,piers,abutments,posts and struts.(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work Stairs,(excluding landings) except spiral-staircase.(FC)
Cold twisted steel reinforcement for RCC work including bending,binding and placing inposition complete.(Labour Element)
Brick work in superstrucutre above plinth level up to floor five level in cement mortor 1:6(1 cement 6M.sand).(Labour Element)
Half brick work in superstrucute above plinth level up to floor five level in cement mortor 1:4(1 cement 4 M.sand).(Labour Element)
Providing wood work in frames of doos ,windows,clearstory windows and othe fames wrough ,framed and fixed in position complete Ist class karimaruth or equivalent.(Full Cost)
Providing and fixing 35mm thick panelled ,glazed or panelled and glazed shutters for doors, windows and clestory windows including anodised aluminium butt hinges with necessery screw.first class karimaruth or equivalent.Including 4mm thick float glass panes (Full Cost)
Providing and fixing karimaruth wood or equivalent 25mm square wooen bars to a required spacing in wooden frames of windows and clerestory windows.(Full Cost)
Proviidng 40x3mm Iron hold fast 40cm long i/c fixing to frames 10mm dia bolts,nuts and wooden plugs and embedding in cement concrete blocks of size 30x10x15cm of mix 1:3:6(1cement 3M.sand 6stone aggregate 20mm nominal size).(Department shall provide cement , sand and stone aggregate and contractor has to bring Iron hold fast)
Providing and fixing Bright finished brass door latch with necessery screws.(Full Cost) a)300mmx 16mm x 5mm
Providing and fixing anodised Brass tower bolt(barrel type) with screws etc complete.(Full Cost)
a)225mmx10mm
b)100mmx10mm
Providing and fixing anodised aluminium Handles anodised transparent or dyed to required colour and shde with necessry screws ect complete.a) 125 mm (Full Cost)
Providing and fixing anodised Aluminium Hooks and eye anodised transparent or dyed to required colour and shde with necessry screws ect complete.(Full Cost).200mm
Providing and laying vitrified floor tiles (premium quality)in different sizes (thickness to be specified by the manufacture) with water absorbtion less than 0.08% and confirming to IS:15622 of approved make in all coloures and shades,laid 20mm thick cement mortor 1:4 (1 cement :4 M.sand )including griouting the joints with white cement and matching pigments etc.complete(flooring) Department shall be provide cement and sand .Contractor has to be bring tiles size of 800x800mm.(Polished vitrified tiles-Khajariya/ Jhonson / Bell/Zeal top.(Full Cost)
Providing and laying vitrified wall tiles (premium quality)in different sizes (thickness to be specified by the manufacture) with water absorbtion less than 0.08% and confirming to IS:15622 of approved make in all coloures and shades, in skirting riser of steps,over 12mm thick bed cement mortor 1:3 (1 cement :3 M.sand )including griouting the joints with white cement and matching pigments etc.Department shall be provide cement and sand .Contractor has to be bring tiles size of 800x800mm.(Polished vitrified tiles-Khajariya/ Jhonson / Bell/Zeal top.(Full Cost)
12mm thick cemnt plaster 1:3(1 cement 3 plastering sand) finidhshed with floating coat of neat cement . (Department shall provide only cement and contractor has to bring plastering sand)
12mm thick cement plaster 1:4( 1 cement 4 plastering sand). (Department shall provide only cement and contractor has to bring plastering sand)
6mm thick cemnt plaster to ceiling 1:3( 1 cement 3 plastering sand) (Department shall provide only cement and contractor has to bring plastering sand)
12mm thick cement plaster 1:6 ( 1 cement 6 plastering sand) . (Department shall provide only cement and contractor has to bring plastering sand)
15mm thick cemnt plaster 1:6 ( 1 cement 6 plastering sand) on the rough side of single or half brick wall . (Department shall provide only cement and contractor has to bring plastering sand)
Providingand applying wall putty of2mm thickness over plastered surface to prapre the surface even and smooth complete.Birla white/ Berger Bison/ JK(Full Cost)
Finishing with Delux multi surface paint system for interior and exteriors using primer as per manuifacture specifications two or more coats applied on walls @ 1.25 ltr/10 sqm over including priming coat of special primer appiled@ 0.75 ltr/10sqm.With Teflon coating (Berger / Nerolac / Asian paint)(Full Cost)
Applying priming coat with ready mixed pink or geey primer of approved brand and manufacture (Berger / Nerolac / Asian paint)(Full Cost)
Pinting wood work with Delux multi surface paint to give an even shade.Two or more coats applied on @0.90ltr/10sqm over uner coat of primer applied @0.75ltr/10sqm of approved manufacture.(Berger /Shalimar/Asian paints)(Full Cost)
Providing and laying PVC pipes of approved quality complete with special flang compression type fittings including trenching and refilling etc..External work..(Full Cost)
b)90mm diametre
Mohammed Hussain PP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .