| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC Techno Commercially Accepted | |
| 2 | L2₹3.9 L+₹3,877.48 (1.01%)Rejected-Finance BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L2 | Rejected-Finance Techno Commercially Rejected | |
| 3 | L3₹4.0 L+₹10,787.82 (2.80%)Rejected-Finance BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | L3 | Rejected-Finance Techno Commercially Rejected |
Tender Value
₹3.8 L
EMD Value
₹4,900
Closing Date
28 Nov 2024, 6:00 pmClosed
MANTU KUMAR
KEDLA WASHERY HAZARIBAGH AREA CCL
Different off-loading mechanical works pump section of main plant at Kedla Washery
2024_CCL_321350_1
PO/KW/eTender/24-25/66, Date 16.11.2024
Open Tender
Electrical and Maintenance Works
Item Rate
12 days
KEDLA WASHERY
AS PER NIT
2 documents required · 2 mandatory
₹4,900
18 Jan 2025
16 Nov 2024
29 Nov 2024
18 Nov 2024
28 Nov 2024
18 Nov 2024
18 Nov 2024 - 23 Nov 2024
Amount
1.Repairing of damaged rake-arms of static thickener. (a) Dismantling of scraper.
Shifting of scraper for repairing and shifting of after repairin g.
Installation after repairing.
Alignment of rake arm after repairing. Labour cost.
Thickener by-pass arrangement for plant operation. Labour cost.
Fasteners used for repairing of rake-arm. (a) H.T. Bolt (M24X120)mm
(b) H.T. Bolt (M20X65)mm
(c) H.T. Bolt (M16X50)mm
Dismantling , repairing and re-installation of Hyd. Jack of static thickener, Wt. of. Hyd. Jack=1.1MT & break down of gear box of static thickener. Wt. of gear box to be dismantling.=2MT .Hyd. Jack+Gear box= 1.1+2= 3.1MT (a) Dismantling of equipments.
(b) Shifting of equipments for repairing and Shifting after repairing.
(c) Installation of equipments for operation.
Fabrication and erection of over-head strecture of 258 and 260 pump removing. (a) Shifting of materials for fabrication.
(b) Installation after fabrication.
Collection of m.S. plate of dia 500mm and length40m, after dismantling from side washery to Kedla washery. Dismantling of pipe of dia 500mm and length 40mtrs. Wt. of pipe =3.14X0.500X40mX8mmX7.85Kg/mm mtr.²=3943.84Kg (a) Dismantaling of pipe.
(b) Shifting of pipe.
Dismantling, Shifiting for repairing, shifting after repairing for Installation of following break down. (a) Dismantling of pump for repairing.
(b) Shifting of pump for repairing and Shifting of pump after repairing.
(c) Installation of pump after repairing.
(d) Dismantling of motor after repairing of base
€ Installation of motor after repairing of base as well as alignment of pump
Replacement of damaged pipe line of 270 suction pipe and 270/C delivery pipe line. (a) Dismantling of pipe.
(b) Shifting of pipe for repairing and Shifting of pipe after repairing.
(c) Installation of pipe for operation.
Total impact of GST for the purpose of CTC
TRIDEO CONSTRACTION (BID ID -1102246)
CHAHAT CONSTRUCTION COMPANY (BID ID -1103278)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .