| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50,000Admitted-Finance | ₹50,000 | L1 | Admitted-Finance |
| 2 | L2₹84,645.50+₹34,645.50 (69.3%)Admitted-Finance | ₹84,645.50+₹34,645.50 (69.3%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UMESH ENTERPRISES L2 | M/S R.K. ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1. Removal of old scrap material of cabin. 2. Cleaning of wall and roof. 3. Repairing/fabrication of operator cabin. 4. Fitting of heat insulation of roof and wall 5. Replacement of heavy duty door lock 6. Removal of old wiring, switches and load point. 7. Layout of PVC wire from JN to load point 8. Fixing of load point and switch board. 9. Connection of wire from switchboard to JN point and load point. 10. Measurement of the inner portion of operator cabin: (i) RHS Wall- 6'x8'= 48 sqft (ii) LHS wall- 4'x8' = 32 sqft ( iii) Back wall 6'x9'= 54 sqft (iv) Roof area = 6'x9'= 54 sqft (v) Floor mat= 6'x9'= 54 sqft Maximum deployment of for the above scope of work will be 1. Skilled for 16 nos. of manshifts, 2. Semi-Skilled for 10 nos. of manshift & 3. Un-Skilled for 17 nos. of manshifts. | |||||
| 2.00 | Labour charges for Cleaning of the working area, Repairing/fabrication of inner portion of operator cabin and Repairing/reconditioning of wiring of operator cabin including contractor's profit. | 1 | Job | 32,012 ₹32,012 | 1,050 ₹1,050 Lowest |
| 3.00Material charges for above scope of work | |||||
| 3.01 | Doorbeat 1" (25 rft) | 1 | No. | 2,100 ₹2,100 | 500 ₹500 Lowest |
| 3.02 | Door handle with door lock | 1 | No. | 1,590 ₹1,590 | 500 ₹500 Lowest |
| 3.03 | Screw Nut Bolt 1/2" x 2.5" | 100 | Nos. | 25 ₹2,500 Lowest | 30 ₹3,000 |
| 3.04 | Heat insulation of roofs and side, rear and door 1/2" thickness | 175 | Sq. Ft | 89.9 ₹15,732.5 Lowest | 125 ₹21,875 |
| 3.05 | Sun mica with ply for ceiling, door LHS | 175 | Sq. Ft | 77.4 ₹13,545 | 60 ₹10,500 Lowest |
| 3.06 | Floor Mat (1/2'' thick) | 45 | Sq. Ft | 130.4 ₹5,868 | 125 ₹5,625 Lowest |
| 3.07 | Solution | 10 | Ltr. | 410 ₹4,100 | 300 ₹3,000 Lowest |
Tender Value
₹1.1 L
EMD Value
₹1,400
Closing Date
6 May 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Repairing OR fabrication of the inner portion of operator cabin and reconditioning of wiring and light fitting of PnH 3 Shovel of Khadia Project.
2026_NCL_358488_1
KHD/G.M. (Excv)/E-Tender/26-27/ 57
Open Tender
Excavation Department Work
Item Rate
9 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,400
13 Jul 2026
18 Apr 2026
8 May 2026
18 Apr 2026
6 May 2026
20 Apr 2026
18 Apr 2026 - 27 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Scope of Work/Technical Specifications etc.
1. Removal of old scrap material of cabin.
2. Cleaning of wall and roof.
3. Repairing/fabrication of operator cabin.
4. Fitting of heat insulation of roof and wall
5. Replacement of heavy duty door lock
6. Removal of old wiring, switches and load point.
7. Layout of PVC wire from JN to load point
8. Fixing of load point and switch board.
9. Connection of wire from switchboard to JN point and load point.
10. Measurement of the inner portion of operator cabin: (i) RHS Wall- 6'x8'= 48 sqft (ii) LHS wall- 4'x8' = 32 sqft ( iii) Back wall 6'x9'= 54 sqft (iv) Roof area = 6'x9'= 54 sqft (v) Floor mat= 6'x9'= 54 sqft
Maximum deployment of for the above scope of work will be 1. Skilled for 16 nos. of manshifts, 2. Semi-Skilled for 10 nos. of manshift & 3. Un-Skilled for 17 nos. of manshifts. | - | - | - | - |
| - | Labour charges for Cleaning of the working area, Repairing/fabrication of inner portion of operator cabin and Repairing/reconditioning of wiring of operator cabin including contractor's profit. | - | Job | - | - |
| - | Material charges for above scope of work | - | - | - | - |
| - | Doorbeat 1" (25 rft) | - | No. | - | - |
| - | Door handle with door lock | - | No. | - | - |
| - | Screw Nut Bolt 1/2" x 2.5" | - | Nos. | - | - |
| - | Heat insulation of roofs and side, rear and door 1/2" thickness | - | Sq. Ft | - | - |
| - | Sun mica with ply for ceiling, door LHS | - | Sq. Ft | - | - |
| - | Floor Mat (1/2'' thick) | - | Sq. Ft | - | - |
| - | Solution | - | Ltr. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
ITB.pdf
Tender Documents • 0.38 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
Annexures.pdf
Tender Documents • 0.80 MB
BOQ_371360.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .