Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹37,616.98Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹37,616.98 | H1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | H2₹36,293.77−₹1,323.21 (3.52%)Admitted-Fee/PreQual/Technical/Finance | -4.00% | ₹36,293.77−₹1,323.21 (3.52%) | H2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
5 May 2026, 6:00 pmClosed
Executive Engineer ICD Pampore
Executive Engineer ICD Pampore
Annual Maintenance, Repairs and other emergent works of PnD Sub Division Baramulla for the Financial Year 2026-27
2026_IFC_309033_1
NIT No. 05 of 2026-27
Open Tender
Civil Works
Percentage
Baramulla
Please refer Tender documents.
10 documents required · 10 mandatory
₹100
Yes
Convener, purchase committee, Directorate of ISM
₹2,000
13 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-
Charge. All kinds of soil : | 1 | Cum | 592.9 | ₹592.9 |
| 2.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 1 | Cum | 187.3 | ₹187.3 |
| 2.02 | Ordinary Rock | 1 | Cum | 392.8 | ₹392.8 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed:
All Kinds of soil | 1 | Cum | 479.3 | ₹479.3 |
| 4.01 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material.
All kinds of soil. | 1 | Cum | 89.75 | ₹89.75 |
| - | Ordinary rock | 1 | Cum | 161 | ₹161 |
| 5 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 1 | Sqm | 12.49 | ₹12.49 |
| 6 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions of Engineer Incharge, all inclusive | 1 | Cum | 189.2 | ₹189.2 |
| 7 | Engagement of Labourer (Skilled) | 1 | Per Day | 734 | ₹734 |
| 8 | Engagement of Labourer (UnSkilled) | 1 | Per Day | 553 | ₹553 |
stage.html
html • 0.02 MB
finance_1000728.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1000728.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .