| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹97.5 L+₹67,225 (0.69%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹98.3 L+₹1.5 L (1.50%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical Not qualified |
| Sl No | Description | Qty | Unit | BHARTIYA ENGINEERS L2 | M/S INDRA PRATAP SINGH L1 | M/S KRISHNA ENGINEERS ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Tube Well | ||||||
| 1.01Drilling of bore well for tube well construction by DC/RC/DTH rig machine including transportation, errection, dismantling of rig and associated T&P complete in all respect including all material, labour etc. | ||||||
| 1.02 | Transportation, errection and dismantling of Rig Machine. | 3 | Job | 28,000 ₹84,000 | 21,500 ₹64,500 Lowest | 25,000 ₹75,000 |
| 1.03DC/RC Drilling. | ||||||
| 1.04 | Drilling of 500 mm dia bore from G.L. to 65 m BGL | 130 | M. | 2,140 ₹2,78,200 | 1,920 ₹2,49,600 Lowest | 2,000 ₹2,60,000 |
| 1.05 | Drilling of 450 mm dia bore from 65 m BGL to 130 m BGL | 130 | M. | 1,940 ₹2,52,200 | 1,980 ₹2,57,400 | 1,900 ₹2,47,000 Lowest |
| 1.06 | Drilling of 625 mm dia bore from G.L. to 70 m BGL | 70 | M. | 2,040 ₹1,42,800 Lowest | 2,140 ₹1,49,800 | 2,100 ₹1,47,000 |
| 1.07 | Drilling of 500 mm dia bore from 70 m BGL to 135 m BGL | 65 | M. | 2,100 ₹1,36,500 | 2,080 ₹1,35,200 | 2,050 ₹1,33,250 Lowest |
| 1.08 | Logging of bore hole by departmental / approved electrical logger. | 3 | Job | 16,000 ₹48,000 Lowest | 18,000 ₹54,000 | 19,000 ₹57,000 |
| 1.09TUBE WELL ASSEMBLY : | ||||||
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
18 Oct 2024, 3:00 pmClosed
Chief General Manager
C and D S EM Wing UP Jal Nigam (Urban)
Construction of 03 nos tube wells and related works and supply and laying of PVC pipe line in different places against Payjal Hetu Vyavastha under Rajya Sector Yojana 2024 - 25
2024_CDSNW_960244_2
831 / Karya- 3 / (24) / 71 Date 25.09.2024
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Item Rate
180 days
Jhunsi Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
Director C and D S EM Wing UP Jal Nigam
₹2.0 L
Yes
Lucknow
21 Oct 2024
28 Sept 2024
19 Oct 2024
28 Sept 2024
18 Oct 2024
28 Sept 2024
4 Oct 2024
Amount
Construction of Tube Well
Drilling of bore well for tube well construction by DC/RC/DTH rig machine including transportation, errection, dismantling of rig and associated T&P complete in all respect including all material, labour etc.
Transportation, errection and dismantling of Rig Machine.
DC/RC Drilling.
Drilling of 500 mm dia bore from G.L. to 65 m BGL
Drilling of 450 mm dia bore from 65 m BGL to 130 m BGL
Drilling of 625 mm dia bore from G.L. to 70 m BGL
Drilling of 500 mm dia bore from 70 m BGL to 135 m BGL
Logging of bore hole by departmental / approved electrical logger.
TUBE WELL ASSEMBLY :
M.S. Tube well assembly with all required parts like plain pipe/ slotted pipe (as required up 50% of plain pipes) rings, wellcap, bail plug, clamp, reducer, central guide, support structure etc. as required and as per typed design complete in all respect.
150 mm dia
200 mm dia
300 mm dia
Supply of Pea Gravel
Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
300 mm dia up to 65 m
200 mm dia from 65 m to 120 m
200 mm dia up to 60 m
150 mm dia from 60 m to 115 mtr.
Development of Tube well
Transportation, Installation Dismantling of 250/350/600 PSI Compressor
Development by 350 PSI air compressor.
Development by 250 PSI air compressor.
Transportation,Erection Dismantling of 1 Cusec / 3 Cusec OP Unit and Yield test.
Development of TW by 3 cusec OP Unit
Development of TW by 1 cusec OP Unit
Chemical and Bacteriological Test of water sample from departmental /approved Lab.
Chemical and Bacteriological test.
Supply of bentonite powder (40 Kg)
Rental Charges for Rig M/C, Compressor & O.P. Unit
Site Clearance for tube well constructional work.
Pumping Plant Work
SITC of Pumping plant including starter, control Panal, cable, complete in all respect with all required material T&P labour etc.
SITC of Main Piping & Valves with 42 mtr. Column pipe, Electronic type Chlorinating plant Power wiring, earthing, Printing, Tools sets, wiring of pump house (internal & External ) Chain Pulley block and gauges complete in all respect with all required material, T&P labour,
80 mm Dia size
150 mm Dia size
Supply of sodium hypo solution (12%)
Watch and ward
Pipe Line work
Supply and carting of following sizes and types of pipe with all jointing material such as socket rubber gasket as per IS 4984/2016 and IS 8329/2000 or their latest amendment including FOR destination and all taxes and insurance etc with loading unloading and stacking all complete.
150 mm dia DI pipe class (K-7)
100 mm dia PVC pipe @ 6 Kg/cm2
100 mm dia DI pipe class (K-7)
Excavation of earth in ordinery soil(loam,clay) with lift up to 1.5 m and lead up to 50 m from trenches including filling back excavated earth into the trenches with watering, ramming and disposal of surplus earth within 50 m lead.
150 mm dia D.I. pipe class (K-7)
100 mm dia PVC pipe @ 6 Kg/cm2
100 mm dia D.I. pipe class (K-7)
Supply and carting of following sizes C.I. D/F sluice valve including FOR destination and taxes and insurance etc complete as per relevant IS code
150 mm dia C.I. D/F sluice valve
100 mm dia C.I. D/F sluice valve
25 mm dia C.I. single ball type air valve.
Supply of all materials construct following chambers as per type design with supply of all labours T&P etc complete.
Air valve chamber
Masonary type
Dismantling of following types of road and stacking of usfull materials and temporary reinstment of raod with old material etc complete.
C.C. Road
Interlocking Road
Bituminious Road
Reinstatment of following types of raod including supply of required materials T&P etc all complete.
C.C. Road
Interlocking Road
Bituminious Road
Provision for crossing of drain /culvert/road crossing etc complete.
100 mm dia DI pipe class (K-7)
150 mm dia DI pipe class (K-7)
100 mm dia PVC pipe @ 6 Kg/cm2
Site clearance work for rising mains & inter connections alongwith other unforseen work.
Underground Chamber
Construction of underground chamber with top cover for installation of pumping plant below ground level with supply of all labour material required and Construction of Pea gravel chamber with gravel feed arrangement around tube well with supply of all material labour T& P required.
Construction of Pump House
Construction of Pump House of size (3.60 x 3.00 m x 3.0m) cum chlorinating room size (1.8 m x 2.60 m x 3.0 m) as per type design.
Construction of inauguration wall
Construction of Wall, Including, plastering & painting etc complete with fixing of stone with writing of tube well details at T.W. site including supply of all materials, labour etc complete in all respect.
BHARTIYA ENGINEERS
M/S KRISHNA ENGINEERS ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .