Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance | ₹8.0 L | L1 | Accepted-Finance L1 |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
24 Aug 2026, 6:00 pmClosed
Administrator
GP HANUMANNAGAR
CONSTRUCTION OF ATAL GYAN KANDER (BUDGET ANNOUNCEMENT 2025-26 ATAL GYAN KANDER)
2026_PRD_586893_1
825-29 DATE 11-08-2026 GP HANUMANNAGAR
Open Tender
Civil Works
Percentage
120 days
GP HANUMANNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
MD RISL
₹16,000
Yes
25 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation excavation up to 1.5m, ramming bottom, dressing sides, back filling and disposal of surplus soil disposal of surplus soil
with in a lead of 50m. | 17.67 | Cum | 143.92 | ₹2,543.61 |
| 2 | Cement concrete in foundation and plinth with brick ballast size 40mm including curing and compaction etc in mix 1:5:10 | 2.36 | Cum | 2,590.14 | ₹6,103.66 |
| 3 | Brick work in foundation and plinth using bricks of class designation-75 in CM 1:6 | 22.02 | cum | 4,686.84 | ₹1,03,220.96 |
| 4 | Brick work in super structure using bricks of class designation-75 in CM 1:6 | 19.48 | cum | 4,935.45 | ₹96,150.28 |
| 5 | Reinforced cement concrete work including curing compaction, finishing with rendering in cement sand mortar 1:3 and making good and joints excluding cost of centering, shuttering and reinforcement in 1:1.5:3 (1cement: 1.5course sand: 3- graded stone aggregate 20mm nominal size) | 14.89 | cum | 5,705.33 | ₹84,973.52 |
| 6 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) in foundation and super structure up to 4.5m height above plinth level hot rolled deformed (IS: 1139) cold twisted (IS:1786) bars | 1,563.84 | kg | 97.94 | ₹1,53,162.42 |
| 7 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways with wooden members and removal of from work | 105.67 | sqm | 319.04 | ₹33,714.3 |
| 8 | S & F Mosaic tiles on roof | 55.81 | sqm | 845.13 | ₹47,170.93 |
| 9 | 20mm thick plaster on new work including curing and racking of joints in CM 1:6 | 225.72 | sqm | 172.46 | ₹38,928.29 |
| 10 | Providing and applying white cement based putty over plastered surface to prepare the surface even and smooth complete ( PWD BSR-2022-LESS -10%) | 225.72 | sqm | 75.6 | ₹17,064.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_1042723.xls
BOQ • 0.24 MB
NIT02DOCUMENTS.pdf
Tender Documents • 7.91 MB
corrnit02hanu.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .