Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC | ₹30.2 L Quoted ₹25.6 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹27.0 LRejected-Finance | ₹27.0 L | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹29.4 LRejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹29.4 L | L3 | Rejected-Finance Not L1 bidder |
| Sl No | Description | Qty | Unit | PAWAN KUMAR L2 | SANTOSH KUMAR SINGH L3 | Nawal Kishore Pandit L1 |
|---|---|---|---|---|---|---|
| 1.00 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 27.5 | Cubic Meter | 5,250 ₹1.4 L | 5,708.24 ₹1.6 L | 5,040 ₹1.4 L |
| 2.00 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 26.5 | Cubic Meter | 1,863 ₹49,369.50 | 2,028.42 ₹53,753.15 | 1,790 ₹47,435 |
| 3.00 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 98 | Cubic Meter | 582 ₹57,036 | 633.78 ₹62,110.38 | 559 ₹54,782 |
| 4.00 | Loading of material (Cement) into tub on surface within a lead of 50m. | 22.96 | Metric Tonne | 172 ₹3,949.12 | 188.02 ₹4,316.99 | 166 ₹3,811.36 |
| 5.00 | Loading of material (Sand) into tub on surface within a lead of 50m. | 93.66 | Cubic Meter | 300 ₹28,098 | 324.52 ₹30,394.91 | 286 ₹26,786.76 |
| 6.00 | Loading of material (Bricks) into tub on surface within a lead of 50m. | 134.25 | Thousand | 556 ₹74,643 | 605.68 ₹81,312.71 | 534 ₹71,689.50 |
| 7.00 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 22.96 | Metric Tonne | 180 ₹4,132.80 | 196.11 ₹4,502.66 | 173 ₹3,972.08 |
| 8.00 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 93.66 | Cubic Meter | 311 ₹29,128.26 | 338.49 ₹31,703.29 | 298 ₹27,910.68 |
| 9.00 | Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 134.25 | Thousand | 580 ₹77,865 | 631.74 ₹84,811.51 | 558 ₹74,911.50 |
| 10.00 | Manual pushing of (Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead -14 | 22.96 | Metric Tonne | 43 ₹987.28 | 47.28 ₹1,085.55 | 42 ₹964.32 |
Tender Value
₹41.4 L
EMD Value
₹51,800
Closing Date
22 Jan 2026, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 50 Nos. ventilation stoppings in different panels of Dhelwadih UG Mine.
2026_SECL_350827_1
SECL/KB/GM/SO(M)/eNIT/25-26/20
Open Tender
Civil Works - Buildings
300 days
Korba
As per NIT
4 documents required · 4 mandatory
₹51,800
26 Feb 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
22 Jan 2026
12 Jan 2026
10 Jan 2026 - 15 Jan 2026
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Loading of material (Bricks) into tub on surface within a lead of 50m.
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Manual pushing of (Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead -14
Manual pushing of (Sand) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead -14
Manual pushing of (Bricks) tubs in underground for every 30m. or part thereof in excess of first 30m. Lead -14
Brick work with flyash F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.1.2
Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.32.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand) DSR Item No. 13.4.2
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_363576.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid