| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.7 LAccepted-AOC | ₹14.7 L | 1 | Accepted-AOC L1 |
| 2 | 2₹15.3 LRejected-AOC POST BIRHU PS KHUNTI IDRI KHUNTI JHARKHAND 835210 | KHUNTI | JHARKHAND | 835210 | ₹15.3 L | 2 | Rejected-AOC L2 |
| 3 | 3₹15.6 LRejected-AOC | ₹15.6 L | 3 | Rejected-AOC L3 |
| 4 | 4₹16.0 LRejected-AOC | ₹16.0 L | 4 | Rejected-AOC L4 |
| 5 | 5₹16.7 LRejected-AOC | ₹16.7 L | 5 | Rejected-AOC L5 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
6 Jun 2026, 3:00 pmClosed
EXECUTIVE OFFICER
NAGAR PANCHAYAT KHUNTI
Construction of PCC Road at Ward No08 from HO Rajesh kumar to HO Pappu kumar under Nagar Panchayat Khunti 2026 27
2026_UDD_114591_2
KNP/05/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
KHUNTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹40,000
Yes
14 Aug 2026
29 May 2026
8 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
29 May 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift,leveline ramming the foundation trenches,removing roots of tree shrubs all complete as per approved design,building specification and direction of E/I.(5.1.1+5.1.2) | - | P/M3 | 151.82 | - |
| 2 | Providing coarse clean localsand filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 lifts including cost of all materials, labours,royalty and taxes all complete as per specification and direction of Engineer Incharge (made of measurement compacted volume) ( 5.1.10) | 93.8 | P/M3 | 589.51 | ₹55,296.04 |
| 3 | Providing designation 75B one brick edge soiling filled with loacal sand including cost of watering taxes royalty all complete as per building specifications and direction of E/I | 168 | P/SQM | 525.29 | ₹88,248.72 |
| 4 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of material,rorralty,all taxes but excluding the cost of carriage all complete as per specificatio and direction of E/I (8.6.8) | 140.7 | P/M3 | 1,756.4 | ₹2,47,125.48 |
| 5 | Providing P.C.C.M -200 with normal mix of (1:1.5:3) in foundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening,, shuttering, mixing cement concrete in mixer and placing in position,vibrating ,striking, curing , taxes and royalty all complete as per building specification and direction of Engineer Incharge.(5.3.1.1) | 206.33 | CUM | 4,961.73 | ₹10,23,753.75 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 135.3 | SQM | 194.5 | ₹26,315.85 |
| 7 | Providing sign board L.S | 1 | No | 5,000 | ₹5,000 |
| 8 | Add for carriage cost materials:-
(ii) Sand 10Km | 182.52 | P/M3 | 267.96 | ₹48,908.06 |
| 9 | (iii) Stone Chips 20 km | 177.45 | P/M3 | 416.76 | ₹73,954.06 |
| 10 | (iv) Stone Boulder 20 km | 140.7 | P/M3 | 429.96 | ₹60,495.37 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.75 MB
BOQ_154871.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].