| 1 | L1₹82.0 CrAccepted-AOC 1 13 16 G KHAPARADEEH KOTHI CAMPUS CIVIL LINES AYODHYA UTTAR PRADESH 224001 | AYODHYA | AYODHYA | UTTAR PRADESH | 224001 | ₹82.0 Cr Quoted ₹83.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹86.6 CrRejected-Finance | ₹86.6 Cr | L2 | Rejected-Finance Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
Refer Docs
EMD Value
₹84 L
Closing Date
23 Apr 2021, 12:00 pmClosed
OFFICE OF THE SE BANDA CIRLCE PWD BANDA
OFFICE OF THE SE BANDA CIRLCE PWD BANDA
IN DISTRICT BANDA THE WIDENING AND STRENGTHENING IN KM 1 TO 16 (550) 16 (683 TO 1000) AND 17 (0 TO 611) OF THE BANDA BYPASS (ODR) ROAD AND NEW CONSTRUCTION OF REMAINING PART OF THE BANDA BYPASS ROAD IN KM 16(550 TO 683) KM 18 (270 TO 1000) TO 20(400)
2021_CEJNS_581986_1
1239/35C-BANDA CIRCLE/20-21 DATE-01-04-2021
Open Tender
Civil Works
540 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
₹84 L
Yes
OFFICE OF THE SE BANDA CIRLCE PWD BANDA
17 May 2021
15 Apr 2021
23 Apr 2021
15 Apr 2021
23 Apr 2021
15 Apr 2021
20 Apr 2021
Amount
Construction of embankment with approved materials obtained from borrow pits which CBR should not be less then 4.50 % and transpoting to site from Lead-1 Km., spreading, grading to required slope and compacting to meet requirement of table 300-2 The Rate is Including Labour Cess.
Excavation of trench and existing shoulder in soil with hydraulic excavator including cutting,trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections As per MORTH Specification No.-301 The Rate is Including Labour Cess.
Scraping of existing granular material up to depth 125 mm depth and spreading in widening with hydraulic excavator including cutting trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. As per MORTH 3.7 (301) The Rate is Including Labour Cess.
Compaction of embankment with approved materials deposited at site from road way cutting (Trench Cutting) and excavation from drain and foundation of other structure graded and compacted to meet requirement of table 300.2. As per MORTH No.-305 The Rate is Including Labour Cess.
Compaction of graunlar material up to meet requirement scrapped from existing graunlar material. The Rate is Including Labour Cess.
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade. The Rate is Including Labour Cess.
Construction of Granular sub base by providing Close graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibtatory roller to achive the desired density complete as per clause 401.The Rate is Including Labour Cess.
Recycling pavement by cold milling of existing bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 per cent of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as specified in clause 517. The Rate is Including Labour Cess.
Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with machanical paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 The Rate is Including Labour Cess.
Providing laying, spreading and compacting graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixe material by tipper to site, laying 1% OPC cement and 3.5% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to acheive the desire density. The Rate is Including Labour Cess.
Providing and applying tack coat with VG-10 using bitumen pressure dristributor @ 0.30 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H Clause 503 The Rate is Including Labour Cess.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.00 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. The Rate is Including Labour Cess.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. The Rate is Including Labour Cess.
Providing & Laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of soecified grading, premixed with bituminous binder @ 5.40 to 5.60 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, local and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH Specifications Clause 509 Complete in All respects.The Rate is Including Labour Cess.
Construction of shoulder with approved materials obtained from borrow pits which CBR should not be less then 4.50 % and transpoting to site from Lead-1 Km., spreading, grading to required slope and compacting to meet requirement of table 300-2 The Rate is Including Labour Cess.
Construction of New Devider. Construction of Granular sub base by providing Close graded material, mixing place method at O.M.C. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401. The Rate is Including Labour Cess.
Cement Concrete in 1:4:8 with cement, c. Sand including cost of all material taxes labour, T&P etc. complete. S.I. No. 281 The Rate is Including Labour Cess.
C.C. in 1:1.5:3 in curb stone including cost of all material taxes labour, T&P etc. complete. S.I. No. 289 The Rate is Including Labour Cess.
Painting on new concrete work with one coat (up to one Sq. meter) of ready mixed priming paint and two coat of approved superior quality ready mixed paint or varnish including supply of all materials labour and tools and plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950. S.I. No. 641 & 642 The Rate is Including Labour Cess.
Earth work filling in Devider by 1 Km. Carted Earth. The Rate is Including Labour Cess.
Construction of RCC U-Drain in Abadi Portion Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) The Rate is Including Labour Cess.
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) The Rate is Including Labour Cess.
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 6:3:1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. As Per SI No. 280 The Rate is Including Labour Cess.
RCC work with cement approved coarse sand and 2cm. (3/4'') gauge approved stone ballast in the proportion 1:2:4 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost. but in RCC T-beam and slab roof and -.288 The Rate is Including Labour Cess.
Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. As Per SI No. 504 The Rate is Including Labour Cess.
P.V.C. Pipe 100mm dia I.S.I. Make. The Rate is Including Labour Cess.
M/S ANMOL ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf