Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -55.30% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -47.79% | ₹1.7 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹3.2 L
EMD Value
₹6,440
Closing Date
7 Mar 2026, 4:00 pmClosed
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_304546_4
e-NIT 94 of 2025-26
Open Tender
Civil Works
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹6,440
Yes
12 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
7 Mar 2026
26 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for oundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete withCement mortar 1:6 (1 Cement : 6 coarse sand) Nallah .
Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone Nallah.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Dumping stone including cost of stones. in Horizontal on level
Carriage of Meterial by Mechanical Transport including loading and unloading and stacking complete job at site.
Carriage of Stone at an average lead of 05.00kms by MT
Carriage of Sand at an average lead of 22.00kms by MT.&100 mtr H/l
Carriage of Bajree Below 40mm) at an average lead of 10.00kms by MT..&100 mtr H/l
Carriage of Bajree (Above 40mm) at an average lead of 10.00kms by MT..&100 mtr H/l
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_989207.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid