Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 LAccepted-AOC | L1 | Accepted-AOC L1 is Less ER | |
| 2 | L2₹22.8 L+₹2.5 L (12.4%)Rejected-AOC | L2 | Rejected-AOC L2 is Above ER |
Tender Value
₹20.3 L
EMD Value
₹20,300
Closing Date
30 Jun 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER (B.P)
Panchayat Union Office Vallam - 604 206 Villupuram District
TN/VPM/Vlm/GF 25-26/SIUS Repair Work/P2
2025_RDTN_572850_1
TN/VPM/Vlm/GF 25-26/SIUS Repair Work/P2
Open Tender
Civil Works
Works
30 days
VALLAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,300
Yes
25 Jul 2025
23 Jun 2025
30 Jun 2025
23 Jun 2025
30 Jun 2025
23 Jun 2025
Amount
Repairs to PUM School RCC Building Three Class Room (North Facing) @ Kurinjipai Panchayat
Chipping of concrete and roughening the surface
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Providing Granolothic flooring CC 1:2:4 Mix 25 mm thick flooring including cost & conveyance of all charges etc to complete
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic a
Pointing With CM1:3 MIX incuding all charges
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Block Board Painting with ready mixed approved paint two coats over New iron works including cost and conveyance etc., complete
Provision for Repairs to doors and window (3 doors) & (9 windows)
Provision for Shoe Rack
Provision for Cubbord Arrangements
Provision for Bala painting
Labour welfare fund @ 1.0%
Name board and Photo charges
Repairs to PUM School RCC Building Two Class Room (East Facing) @ Kurinjipai Panchayat
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Paving wall and floor tiles any approved colour and size shape and quality laid in CM 1:3 to 20mm thick in all floors
Terrace Finishing with one course of Pressed tile of the size 23x23x2 cm with cm 1:3 and pointed with same oiled mortar including coat & conveyance
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Block Board Painting with ready mixed approved paint two coats over New iron works including cost and conveyance etc., complete
Provision for Repairs to doors and window (2 doors) & (6 windows)
Provision for Shoe Rack
Provision for Cubbord Arrangements
Provision for Bala painting
Labour welfare fund @ 1.0%
Name board and Photo charges
Contingencies
Repairs To Kitchen Shed in PUE School @ Kurinjipai Panchayat
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all
Providing Granolothic flooring CC 1:2:4 Mix 25 mm thick flooring including cost & conveyance of all charges etc to complete
Distembering Two Coats with Primer coat and Two Coat with OIL BOUND DISTEMBER over cement plastered surface including all charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer.
Block Board Painting with ready mixed approved paint two coats over New iron works including cost and conveyance etc., complete
Provision for Repairs to doors and window (1 doors) & (3 windows)
Provision for electrical arrangement
Provision for water supply arrangement
Labour welfare fund @ 1.0%
Name board and Photo charges
Contingencies
Repairs To PUE School RCC Building at Kalaiyur Pachayat
Dismantling Pressed tiles and weathering course
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Construction of chappal rack in verandah
Electrification arrangements
Provision for Bala pianting
Repairs to Doors and Windows
Towards the cost of name board.
Towards the cost of Photograph
Provison for LWF 1%
Unforeseen Contingencies.
Repairs To PUM School RCC Building at Kadambur Pachayat
Dismantling Pressed tiles and weathering course
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Construction of chappal rack in verandah
Provision for Bala pianting
Labour charges for fixing windows
Repairs to Doors and Windows
Towards the cost of name board.
Towards the cost of Photograph
Provison for LWF 1%
Unforeseen Contingencies.
Repairs To PUM School RCC Building (East Facing) at Melathipakkam Pachayat
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Pointing with CM 1:3 Mix with water proofing compound over pressed tiles
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Construction of chappal rack in verandah
Electrification arrangements
Provision for Bala pianting
Repairs to Doors and Windows
Towards the cost of name board.
Towards the cost of Photograph
Provison for LWF 1%
Unforeseen Contingencies
Repairs To PUM School RCC Building (West Facing) at Melathipakkam Pachayat
Dismantling Pressed tiles and weathering course
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Construction of chappal rack in verandah
Provision for Bala pianting
Labour charges for fixing windows
Repairs to Doors and Windows
Towards the cost of name board.
Towards the cost of Photograph
Provison for LWF 1%
Unforeseen Contingencies.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.R. CONSTRUCTIONS AND DEVELOPERS (BID ID -1378886)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_684462.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .