Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST₹14.6 LAccepted-AOC NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | FIRST | Accepted-AOC BEING LOWEST | |
| 2 | SECOND₹16.5 LRejected-Finance SITE NO 29 30 1ST CROSS NAGAPPA REDDY LAYOUT KAGGADASPURA CV RAMAN NAGAR BANGALORE 560093 | BENGALURU URBAN | KARNATAKA | 560093 | SECOND | Rejected-Finance BEING NOT LOWEST | |
| 3 | THIRD₹16.6 LRejected-Finance NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | THIRD | Rejected-Finance BEING NOT LOWEST | |
| 4 | FORTH₹16.6 LRejected-Finance BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | FORTH | Rejected-Finance BEING NOT LOWEST | |
| 5 | FIFTH₹16.7 LRejected-Finance | FIFTH | Rejected-Finance BEING NOT LOWEST |
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
15 Apr 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Marathahalli
Garrison Engineer AF Marathahalli Wind Tunnel Road Kempapura Yemalur Post Bangalore 560 037
REPAIRS AND MAINTENANCE OF SUMMER COOLING APPLIANCES UNDER GE AF MARATHAHALLI BANGALORE
2024_MES_646920_1
8684/E8
Open Tender
Civil Works
Item Rate
240 days
GE (AF) Marathahalli
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (AF) Marathahalli
₹31,000
Yes
19 Jun 2024
18 Mar 2024
20 Apr 2024
18 Mar 2024
15 Apr 2024
1 Apr 2024
Amount
Material and Labour for servicing of Window type AC and taking out the AC from its existing position/location, shifting the same, servicing the condenser and cooling coil with blower, cleaning the coils with caustic soda, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerant controls, cleaning the air filter, re-installing in its original position, connecting up all connections and testing all as directed for Window type Air Conditioner of 1.0 Ton. Note : Gas Charging shall be measured and paid separately under relevant item of this schedule
All as per item No.1 here in before but for Window type Air Conditioner 1.5 Ton
All as per item No.1 here in before but for Window type Air Conditioner 2.0 Ton
Taking out burnt/ unserviceable sealed compressor Unit from Window type air conditioner, Supply & replacement factory sealed compressor unit, connecting refrigeration system after thorough flushing out the system with dry nitrogen, leak testing with nitrogen, vaccumising including neccessery brazing and welding arresting leakages and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed for Window type Air Conditioner 1.5 Ton. Notes :– (i) Factory sealed compressor unit shall be of existing capacity and make. (ii) Gas Charging shall be measured and paid separately under relevant item of this schedule.
All as per item No.4 here in before but for Window type Air Conditioner 2.0 Ton
Material and Labour for removing the Window type Air conditioner from installed position leak testing and arresting the leakages in condensor/evaporator coil by brazing etc and refixing complete for window type AC of 1.0 ton / 1.5 ton / 2.0 ton Capacity
Material and Labour for charging of refrigerant gas F-22 / R-22 /R-32 / R-134A to the Window type Air conditioner, water coolers, Refrigerator and Split type air conditioner after vaccumising the complete system & pressure test with nitrogen to ensure complete system leak proof, testing of air conditioners, water coolers for proper functioning & cooling effect to the entire satisfaction of Engineer in Charge
Taking out the defective spare parts of window type AC of any capacity at its existing location by drawing out the AC from outer cover, supply and fixing new spare parts after thorough checking and rectification of defects in wiring circuits, pushing back the unit in its outer cover, testing and commissioning all as and directed.. NOTE:- Supply of spare parts will be measured separately under relevant items of this schedule.
Servicing the Voltage Stabilizer 4 KVA single phase of make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assemble back & fixing in its original position including testing for proper functioning complete all as specified and as directed.
Servicing the Voltage Stabilizer 5 KVA single phase of make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assemble back & fixing in its original position including testing for proper functioning complete all as specified and as directed.
Material and Labour for complete servicing after pumping down Indoor/outdoor units of split AC complete by cleaning condenser/ Evaporator coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, cleaning the air filter, connecting up all connections and testing after gas charging if required all as directed for Split type Air Conditioner up to 1.0 Ton. Notes :- (i) The rate deemed includes for minor spares (ii) Gas shall be measured and paid separately under relevant item.
All as per item No.11 here in before but for Split type Air Conditioner up to 1.5 Ton.
All as per item No.11 here in before but for Split type Air Conditioner 2.0 Ton.
All as per item No.11 here in before but for mega Split type Air Conditioner 2.5 Ton.
All as per item No.11 here in before but forvertical type Air Conditioner 3.0 Ton
Taking out burnt/ unserviceable sealed compressor Unit from split type air conditioner, Supply & replacement factory sealed compressor unit, connecting refrigeration system after thorough flushing out the system with dry nitrogen, leak testing with nitrogen, vaccumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed for Split type Air Conditioner 1.5 Ton. Notes:- (i) Factory sealed compressor unit shall be of existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separately under relavent item
All as per item No 16here in before but Split type Air Conditioner 2.0 Ton
All as per item No.16 here in before but Split type Air Conditioner 2.5 Ton
Material and Labour for removing the Split type Air conditioner outdoor unit/indoor unit from installed position leak testing & arresting the leakages in condenser coil by brazing etc complete for Split type AC 1.5 ton / 2.0 ton / 2.5 ton. Note :- Gas Charging shall be mesasured and paid separately under relavent item
Taking down the Unserviceable IDU blower motor and Supplying and Fixing IDU blower motor capacity as per existing make all as directed for 1.5 Tr split AC.
Taking down the Unserviceable IDU blower motor and Supplying and Fixing IDU blower motor capacity as per existing make all as directed for 2.0 Tr split AC.
Taking down the Unserviceable Condenser fan blade and Supplying and Fixing as per existing make all as directed for Condenser fan blade 1.5 TR.
Taking down the Unserviceable Condenser fan blade and Supplying and Fixing as per existing make all as directed for Condenser fan blade 2.0 TR.
Taking down the Unserviceable Condenser fan motor and Supplying and Fixing as per existing make all as directed for 1.5 TR split AC.
Taking down the Unserviceable Condenser fan motor and Supplying and Fixing as per existing make all as directed for 2.0 TR split AC.
Supply only Starting Capacitor of 80 / 100 mfd.
Supply only Running Capacitor 36 / 45 mfd.
Supply only Potential Relay.
Supply only Thermostat.
Supply only Control Knob.
Supply only capacitor 1.5 mfd to 4 mfd
supply only swing blade opertated motor for indoor split unit up to 2 ton
Supply only Blower bush for indoor split unit up to 2 ton capacity
Supply and fixing AC timer suitable for controlling 2 Nos split AC
Supplying and Fixing in repairs Copper refrigerant pipe Copper tube 1/2 " x 1/4".
Supplying and Fixing in repairs Copper refrigerant pipe Copper tube 5/8 " x 1/4".
Taking down perished Unserviceable insulation cover of refrigerent piping and Supplying & Fixing brutile rubber insulation for refrigerent pipings of suitable size.
Taking out existing Unserviceable Remote Control and Supplying & Fixing Remote Control with cord wire for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Taking out existing Unserviceable Air Filter and Supplying & Fixing Air filter for Split type 1.5 ton / 2 ton /2.5 ton
Removing existing Unserviceable fan motor of Condenser of Split type AC & rewinding of fan motor with suitable size of super enamelled copper winding wire etc Complete for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supply Only Controller Card for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supply Only Micro Controller with Embedded software for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supply Only Relays for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supply Only Sensors with 5 mtr cable for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supply Only Fuses for Split type AC 1.5 ton / 2.0 ton / 2.5 ton.
Supplying and Fixing PVC flexible Conduit pipe 20mm dia medium grade including all accessories for drain out pipe all as directed.
Supplying and Fixing inlet / outlet gas Valves suitable for split AC 1.5 ton / 2.0 ton / 2.5 ton all as directed.
Material and Labour for servicing water coolers of 40 / 80 ltrs Capacity Complete with cleaning condenser coil with air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed.
Material and Labour for servicing water coolers of 60 / 120 ltrs Capacity Complete with cleaning condenser coil with air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed.
Taking out burnt / unserviceable Sealed Compressor Unit from Water coolers 40 / 80 Ltrs per Hr Cooling capacity, Supply & replacement factory Sealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separately under relavent item
Taking out burnt / unserviceable Sealed Compressor Unit from Water coolers 60 / 120 Ltrs per Hr Cooling capacity, Supply & replacement factory Sealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all as directed. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separately under relavent item
Material and Labour for removing the Water cooler from position and arresting the Leakages in condenser coil by brazing etc Complete for Water cooler 40 / 60 Ltrs per Hr Cooling Capacity.
Taking out Unserviceable starting capacitor, Supplying & Fixing Starting capacitor suitable for Water cooler 40 Litres/Hr or 60 litres/Hr Cooling capacitor.
Taking out Unserviceable running capacitor, Supplying & Fixing running capacitor suitable for Water cooler 40 Litres/Hr or 60 litres/Hr Cooling capacitor.
Taking out existing unserviceable thermostat, Supplying & Fixing thermostat for Water cooler 40 Litres / Hr or 60 litres/ Hr Cooling capacity.
Taking out existing Unserviceable potential relay, Supplying & Fixing Potential relay of for Water cooler of 40Ltr/Hr or 60 Ltrs/Hr Cooling capacity.
Taking out Unserviceable OLP from Water cooler, Supplying & Fixing OLP suitable for Compressor all as directed.
Taking out Unserviceble fan motor, Supplying & Fixing Fan motor (for Water Cooler Capacity 40 Ltrs/Hr or 60 Ltrs/Hr cooling capacity).
Material and Labour for taking out defective fan blade of Water Cooler of any make & size Supplying and Fixing new Fan blade of same size and design as existing all as directed.
Taking Out defective PVC flexible connector, Supplying & Fixing heavy duty PVC flexible connection braided type 15mm dia and 450mm long with nuts/ washers on either end all as directed.
Material and Labour for Servicing Refrigerators up to 185 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed.
Material and labour for Servicing Refrigerators up to 185 - 400 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed.
Taking Out Unserviceable / burntout Sealed Compressor Unit from Refrigerator, Supply & replacement Factory Sealed Compressor unit, connecting with copper piping by braziing & Copper tubing etc Complete Up to 185 Lts capacity. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separtely under relavent item
Taking Out Unserviceable / burntout Sealed Compressor Unit from Refrigerator, Supply & replacement Factory Sealed Compressor unit, connecting with copper piping by braziing & Copper tubing etc Complete Up to 185 - 400 Lts capacity. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separtely under relavent item
Removing the Refrigerator from position and arresting the Leakages in Condenser Coil by brazing etc. complete for refrigerator Up to 285 Ltrs.
Taking Out existing Unserviceable Thermostat and Supplying and Fixing Thermostat for Refrigerator 165 Ltrs / 285 ltrs.
Taking Out existing Unserviceable Box Type Relay, Supplying and Fixing Box type Relay for Refrigerators 165 Ltrs / 285 Ltrs.
Taking Out existing Unserviceable OLP, Supplying and Fixing OLP for Refrigerator 165 Ltrs / 285 ltrs.
Supply and Fixing in repairs Metal clad switch socket double pole and neutral enclosure with a two pin and earth plug and socket complete with One Single pole MCB SP 20 to 32 Amps and fixed concealed in walls Complete all as specified and as directed.
Pumping down the Compressor before dismantling inner and outer units disconnecting electric connections also without any damage to existing system, reinstalling of inner and outer units in new locations Complete with brackets and civil works (making holes in wall) complete finishing as required, assembling of inner & outer units including connection of suction and discharge pipes, testing connection etc with topping up refrigerant gas as required to maintaining pressure all as specified and directed.
Material and labour for servicing Deep freezer upto 400 Lts capacity complete with cleaning condenser coil with air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testing all as directed.
Taking down of old u/s AC manager and Supply & fix AC load manager with built in programme for on/off of 2 Nos of 1.5 TR/2 TR capacity split type Acs suitable for operating on single phase 230 volts all as specified and directed.
Taking down un serviceable MCB SP 20 to 32 Amp Supply and Fixing in repairs MCB SP 5 to 32 Amps rating, 10 KA Ç 'curve 240V, 50 Hz AC Complete all as specified and as directed.
Taking down un serviceable MCB SPN 20 to 32 Amp Supply and Fixing in repairs MCB SPN 20 to 32 Amps rating, 10 KA Ç 'curve 240V, 50 Hz AC Complete all as specified and as directed.
Aavani BUILDERS AND CONTRACTORS
devan enterprises
RAHUL ENTERPRISES
RAMESH BABU CO
M/S SRI BALAJI ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .