| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.0 LAccepted-AOC TUTICORIN TAMIL NADU | ₹20.0 L Quoted ₹25.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹27.5 LRejected-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹27.5 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S YOGARAJ CONTRACTOR L1 | CKEE ENGINEERING PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Cutting, removal and re-erection of existing platforms, structural members at 34 M level. This work involves cutting, removal and re erection of existing platforms, structural members to facilitate movement of new & old headers with stub for replacement of eroded SH steam cooled wall header No:4, arranging scaffolding wherever required for cutting, lifting and lowering the structural members. | 2 | No. | 90,226 ₹1.1 L | 97,446 ₹1.1 L |
| 2.00 | Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at super heater steam cooled wall area for replacement of the header and removal of platform and scaffolding after completion of work. | 2 | No. | 1,74,142 ₹2.1 L | 1,88,074 ₹2.2 L |
| 3.00 | Charges for drawl of 1 no. new superheater steam wall header No:4 from stores, leading lifting and transporting to boiler area, arranging scaffoldings, sling were ever required, leading & lifting the new header to the boiler 34mtr level, lowering released eroded header to the ground floor and devolution the eroded header to stores. | 2 | No. | 1,29,884 ₹1.5 L | 1,40,276 ₹1.7 L |
| 4.00 | Charges for transportation of T & P’s, Platform Materials, gas and other consumables to the work area, arresting the super heater steam cooled wall header No.5 with proper supports and after completion of new header erection work normalizing the header No.5 | 2 | No. | 84,056 ₹99,186.08 | 90,782 ₹1.1 L |
| 5.00 | Charges for cutting of existing superheater steam cooled wall header by grinding, edge preparation of existing header | 2 | No. | 2,49,270 ₹2.9 L | 2,69,212 ₹3.2 L |
| 6.00 | Charges for welding the new super heater steam cooled wall header No:4 with the existing header by IBR welder including T&P's and consumables | 2 | Joint | 3,47,274 ₹4.1 L | 3,75,058 ₹4.4 L |
| 7.00 | Charges for welding the super heater steam cooled wall header stubs to existing steam cooled wall tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. | 122 | Joint | 9,22,564 ₹10.9 L | 9,96,496 ₹11.8 L |
| 8.00 | Stress relieving the welded area of the super heater steam cooled wall header No:4 | 2 | No. | 98,682 ₹1.2 L | 1,06,578 ₹1.3 L |
| 9.00 | Radiography of the welded area of the super heater steam cooled wall header No:4 | 2 | No. | 52,500 ₹61,950 | 56,700 ₹66,906 |
| 10.00 | Charges for fin welding by cleaning, surface preparation and welding. | 250 | Mtr. | 2,42,750 ₹2.9 L | 2,62,250 ₹3.1 L |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
29 Dec 2025, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I Replacement of eroded super heater steam cooled wall header No 04 left right by cutting grinding welding and commissioning in Unit I Boiler during overhaul 2025 2026
2025_EB_630518_1
CE/TTPS/SE/M-II/No.312/2025-26
Open Tender
Miscellaneous Works
40 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹18,000
Yes
25 Mar 2026
9 Dec 2025
30 Dec 2025
9 Dec 2025
29 Dec 2025
9 Dec 2025
Cutting, removal and re-erection of existing platforms, structural members at 34 M level. This work involves cutting, removal and re erection of existing platforms, structural members to facilitate movement of new & old headers with stub for replacement of eroded SH steam cooled wall header No:4, arranging scaffolding wherever required for cutting, lifting and lowering the structural members.
Charges for leading lifting of scaffolding materials and erection of platform and scaffolding at super heater steam cooled wall area for replacement of the header and removal of platform and scaffolding after completion of work.
Charges for drawl of 1 no. new superheater steam wall header No:4 from stores, leading lifting and transporting to boiler area, arranging scaffoldings, sling were ever required, leading & lifting the new header to the boiler 34mtr level, lowering released eroded header to the ground floor and devolution the eroded header to stores.
Charges for transportation of T & P’s, Platform Materials, gas and other consumables to the work area, arresting the super heater steam cooled wall header No.5 with proper supports and after completion of new header erection work normalizing the header No.5
Charges for cutting of existing superheater steam cooled wall header by grinding, edge preparation of existing header
Charges for welding the new super heater steam cooled wall header No:4 with the existing header by IBR welder including T&P's and consumables
Charges for welding the super heater steam cooled wall header stubs to existing steam cooled wall tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
Stress relieving the welded area of the super heater steam cooled wall header No:4
Radiography of the welded area of the super heater steam cooled wall header No:4
Charges for fin welding by cleaning, surface preparation and welding.
Charges for providing refractory over the newly erected steam cooled wall header stubs including transportation of refractory from stores/Pocket Store and water from 0 m level to the required elevation, etc complete.
Charges for renewal and repairing of Insulation and Re fixing Skin casing inclusive of necessary Scaffolding arrangements
Charges for supply of Fire crete castable refractory cement in HDPE Bags
CKEE ENGINEERING PRIVATE LIMITED (BID ID -1546851)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_753974.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid