Loading…
Loading…
Tender Value
₹24.1 L
EMD Value
₹24,077
Closing Date
17 Jul 2026, 5:00 pm
BDO KABISURYANAGAR
MAIN ROAD ,BLOCK OFFICE KABISURYANAGAR
CONSTRUCTION OF GPLF OFFICE BUILDING WITH MARKET COMPLEX AT GP LEVEL UNDER ATHAGADAPATNA GP
2026_PRBKB_134207_1
PSKSN-01/2026-27
Open Tender
Civil Works - Buildings
ATHAGADAPATNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BDO KABISURYANAGAR
₹24,077
Yes
3 Jul 2026
3 Jul 2026
21 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation of foundation & plinth in hard soil mixed with gravels including dressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within initial lead of 50 mtr & initial lift of 1.5 mtr, including cost of labour T&P articles required for the work including shoring, shuttering, propping & dewatering if required, etc. complete in all respect as per the specification & direction of the Engineer-in- Charge. | |||||
| 2Supplying and filling foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceed 23.5cm(9") in depth with all lead and lift inclujding cost, conveyance, loading, unloading, royalities and taxes of all materials, cost of all labour, sundries, T&P required for the work etc complete in all respect as per direction by the Engineer -in- Charge | |||||
| 3Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc required for the work including shoring, shuttering and dewatering if required including hire & running charges of all machineries required for the work etc complete as per the direction of the Engineer -in –charge | |||||
| 4Brick Masonry work with Fly Ash brick of size 23 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge.(Foundation and Plinth) | |||||
| 5Brick Masonry work with Fly Ash brick of size 23 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge.Ground floor( Super structure) | |||||
| 6R.C.C (M 20) using 20 mm and down graded H.G crusher broken chips of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete and cost, conveyance royalties and taxes of all materials, labour and T&P required for the work etc complete as directed by Engineer – in- charge.(Ground Floor) | |||||
| 7Providing, Cutting, straightening coiled or bent up Fe-415 grade steel welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods, Fe-415 or equivalent and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod, Fe-415 or equivalent consumed in the work and no separate payment will be made towards weight of binding wires which is to be borne by the contractor at his own cost) as per the direction of Engineer-in-charge.Ground floor | |||||
| 8Rigid and smooth centering and shuttering for R.C.C. works including false works and dismentaling them after required period of casting including cost of all materials, labour required for the work complete as directed by Engineer – in- charge.RCC work up to plinth beam (Column Footings) | |||||
| 8.1 | Rigid and smooth centering and shuttering for
R.C.C. works including false works and dismentaling them after required period of casting including cost of all materials, labour required for the work complete as directed by Engineer – in- charge.RCC work up to plinth beam (Plinth beam) | - | per 1 sqm | - | - |
| 8.2 | Rigid and smooth centering and shuttering for
R.C.C. works including false works and dismentaling them after required period of casting including cost of all materials, labour required for the work complete as directed by Engineer – in- charge.RCC work up to Lintel (Ground floor) | - | per 1 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.56 MB
BOQ_599403.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid