| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC BHIWANI HARYANA | BHIWANI | HARYANA | 127021 | ₹1.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹1.9 L+₹8,844.88 (4.76%)Rejected-Finance 2214 URBAN ESTATE JIND | JIND | HARYANA | 126101 | ₹1.9 L+₹8,844.88 (4.76%) | L2 | Rejected-Finance ok |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
29 May 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
Annual Maintenance Estimate of Sewerage Scheme in Secor 27and28A Hisar 2025-26.
2026_HBC_523910_1
202623359D0A 7131 4B57 9DB9 13FA08DD7B1C259HSV
Open Tender
Civil Works
Works
60 days
Hisar
Repairing the sewerage manhole by casting of RCC slab including repairing of sewer line near plot no. 70 in sector-27and28, Hisar and all other works contingent thereto.
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
19 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
29 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. | 47.42 | cum | 1,863 | ₹88,343.46 |
| 2 | [15.1.2.1]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications
Ordinary soil 2.1. Mechanical Means
Depth up to 3 m | 170.55 | cum | 79 | ₹13,473.45 |
| 3 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. | 225 | Sqm | 88 | ₹19,800 |
| 4 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | 10 | Each | 1,155 | ₹11,550 |
| 5 | [21.94.3]Providing salt glazed stone ware pipes grade ‘A’ in standard length of 600 mm each pipe marked with IS: 651 and their lowering, cutting, jointing and testing as described in item No. 21.38, 21.39, item 21.40 including the cost of jointing materials as well as carriage, loading, unloading, stacking, handling, re-handling etc. complete in all respects to the satisfaction of Engineer-in-charge. 3. 200mm i/d | 150 | Per Mtr. | 238 | ₹35,700 |
| 6 | [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level | 2.73 | cum | 4,464 | ₹12,186.72 |
| 7 | [6.29.2]Centering and shuttering including strutting, propping etc. and removal of form work for : 2. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 7.24 | Sqm | 282 | ₹2,041.68 |
| 8 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform | 8.3 | Sqm | 208 | ₹1,726.4 |
| 9 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more | 218 | Kg. | 66 | ₹14,388 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_602856.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .