Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5 LAccepted-AOC | L-1 | Accepted-AOC Accept | |
| 2 | L-1₹5 LAccepted-AOC 24 42 1 B BHATAI NEW COLONY NAINI PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | L-1 | Accepted-AOC Accept |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
2 Jan 2024, 1:00 pmClosed
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
FOR THE WORK OF INSTALLATION OF SINGLE PHASE METERS AT THE IDF CONSUMER PREMISES ALONG WITH OTHER ASSOCIATED WORKS UNDER EDC-1 AGRA.
2023_DVVNL_872217_1
60/EDCA/2023-24
Open Tender
Electrical Works
Piece-work
180 days
B-690 Kamla Nagar Agra
As Per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹10,000
16 Apr 2024
19 Dec 2023
2 Jan 2024
19 Dec 2023
2 Jan 2024
19 Dec 2023
Carriage of single phase energy meter & Meter Box from ESC Taj, Agra to Test Lab, Kamla Nagar Agra [Distance appxy. 15 Km] and then prepairing the meter by fixing plastic/hologram seals and entering meter data on meter ragister accordinly and then marking the Lab meter No. on meter cover with permanent marker pen and then carting the meter from the Test Lab to respective 33/11 KV substation/ site of work [Distance approx 50 Km.], as per direction of Supervising Engineer including the work of loading, unloading, Carriage and stacking the meters at the respective ends and also Including the cost of arrangement of labour, T & P, carrier required for proper completion of work.
(A) Installation of New meter & Replacement/Re-installation of single phase meter of IDF consumers premises at appropriate outside location and height (at least 5 feet), than connecting the meter with LT distribution line and consumer's cut out/electrical fitting. Work includes proper completion and submission of sealing certificate to the concern supervisory engineer with pre and post work photographs, and entry of meter advise in billing data by providing meter advise report in prescribed M.S. Excel format and conversion of consumers to MU base billing. (B) Review of connections for confirming MU base billing after 10-15 days of meter installation as per billing parameter and providing meter reading in KWH and maximum demand in M.S. Excel format.
Sai Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .