Tender Value
₹17.3 L
EMD Value
₹17,300
Closing Date
2 Jan 2025, 3:00 pmClosed
BDO
PT UNION OFFICE
Construction of Computer Lab Building at Melasthanam PUMS in Mumbalai Panchayat
2024_RDTN_515400_1
Construction of Computer Lab Building at Melasthanam PUMS in Mumbalai Panchayat
Open Tender
Civil Works - Buildings
Works
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,300
Yes
2 Jan 2025
30 Dec 2024
2 Jan 2025
30 Dec 2024
2 Jan 2025
30 Dec 2024
Amount
Construction of Computer Lab Building at Melasthanam PUMS in Mumbalai Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the site and all labour charges etc
Filling in Basement with excavated earth including cost and conveyance to the site and all labour charges etc
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Below GL
Above GL
Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete
Special Ceiling Plastering with Cement Mortar 1:3 mix 10mm thick including cost and conveyance of all materials and all labour charges etc,. complete.
Plastering with Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials and all labour charges etc,. complete.
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 by the Volume laid over a Single layer and Consolidated to the required etc
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Paving the floor with kotta stone of size 610x610x 20mm cm 1:3 20mm thick including Cost and Conveyance of all materials to site etc
Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges etc
Distember Painting two coats inluding cost and conveyance of all materials to site and all labour charges
Emulsion Painting two coats inluding cost and conveyance of all materials to site and all labour charges
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats with approved Black Oxide for Black board including cost and conveyance of paint and all labour charges etc d at the ends are welded to the outer frame of the door. Tower bolt 2 Nos. at the top provided.
Supply and Fixing of Steel Door and Window etc
Door 1.20 x 2.40M
Window1.20 x 1.60M
Provision for Electrification
Light & Fan Point SD.23
Tube Light SD .88
CFL SD .80
Street Light SD .94
Fan SD 110
Plug Point SD 39
Service Connection SD 68
Supplying and Fixing of PVC Rain Water down Fall Pipe 100mm dia with necessary including all labour Charges etc
Sub Estimate for Chappal Rack
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two Coats of newly Plastered wall surface with ready mixed paint plastic emulsion paint of first class quality and of approved colour over a primimg coat including thorough Scrapping,Clean removal of dirt including necessary plaster od paris putty,wherever requried etc.,
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
CONSTRUCTION OF CUP BOARD WITH SHUTTER
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two Coats of newly Plastered wall surface with ready mixed paint plastic emulsion paint of first class quality and of approved colour over a primimg coat including thorough Scrapping,Clean removal of dirt including necessary plaster od paris putty,wherever requried etc.,
Providing cuddapah slab 38 to 40mm for shelfs etc., all complete
labour charges for fixing cuddapah slab 38 to 40mm for shelfs etc., all complete
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work
Special design Art work with first class quality emulsion paint including wall putty, Priming coat etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M. HAPEEP RAHMAN (BID ID -1223829)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .