Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ZION LIFTS L1 |
|---|---|---|---|---|
| 2.00Description of Items : | ||||
| 3.00 | Design, supply, delivery at site, installation, testing and commissioning of 6 passengers lift in the machine room with gearless machine for G+2 floors with AC VVVF drive control for constant load of 408 Kg respectively traveling @ 1.0 mps with Simplex operation without attendant, car position indicators, battery operated alarm bell and emergency light, stainless steel finish car interior, power operated center opening automatic sliding stainless steel doors for car entrance and hoist way entrance etc. including all steel, civil and electrical materials as specified such as machine beams, buffer support channels, fascia plates, landing sills, pit ladder metal screen in elevator pit etc., as per the specification including cost of all civil and electrical works required for installation of elevator in the existing lift well and machine room, scaffolding, cutting holes, grouting and making good to damages in wall, floor, ceiling etc. for fixing accessories, foundation bolts etc., hoist way wiring and other associated Wirings including Fireman's switch complete in all respect as per direction of Engineer-in-charge. the Lift car should be fabricated by utilising maximum Space in the lift well. (i.e. moving car should be customized according to lift well size only). Warranty of the lift should be 3 years from the date of handing over of the lift | 1 | No's | 11,29,000 ₹13,32,220 Lowest |
| 4.00 | Dismantling of old lifts | 1 | No's | 48,000 ₹56,640 Lowest |
| 5.00 | Civil and Electrical works as per the site conditions | 1 | No's | 99,000 ₹1,16,820 Lowest |
| 6.00 | Buyback Amount for disposal ( loading/unloading, freight charges etc in the scope of contractor only) | 1 | No's | -78,000 ₹-92,040 |
| 7.00 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 1st Year CAMC charges | 1 | No's | 52,500 ₹61,950 Lowest |
| 8.00 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 2nd Year CAMC Charges | 1 | No's | 60,000 ₹70,800 Lowest |
| 9.00 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 3rd Year CAMC Charges | 1 | No's | 70,000 ₹82,600 Lowest |
| 10.00 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 4th Year CAMC Charges | 1 | No's | 82,000 ₹96,760 Lowest |
| 11.00 | Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 5th Year CAMC Charges | 1 | No's | 95,000 ₹1,12,100 Lowest |
Tender Value
₹15.6 L
EMD Value
₹31,500
Closing Date
12 Jan 2026, 2:00 pmClosed
Director NGRI
uppal Road Hyderabad
Dismantling of Existing 6-Passenger Lift and SITC of New 6-Passenger Lift in Main Building, CSIR-NGRI
2025_CSIR_260650_1
NGRI-03/09/2025-Works
Open Tender
Machineries/ Mechanical Engg Items
Works
90 days
NGRI hyderabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Director NGRI
₹31,500
16 Jan 2026
29 Dec 2025
13 Jan 2026
29 Dec 2025
12 Jan 2026
29 Dec 2025
29 Dec 2025 - 5 Jan 2026
Description of Items :
Design, supply, delivery at site, installation, testing and commissioning of 6 passengers lift in the machine room with gearless machine for G+2 floors with AC VVVF drive control for constant load of 408 Kg respectively traveling @ 1.0 mps with Simplex operation without attendant, car position indicators, battery operated alarm bell and emergency light, stainless steel finish car interior, power operated center opening automatic sliding stainless steel doors for car entrance and hoist way entrance etc. including all steel, civil and electrical materials as specified such as machine beams, buffer support channels, fascia plates, landing sills, pit ladder metal screen in elevator pit etc., as per the specification including cost of all civil and electrical works required for installation of elevator in the existing lift well and machine room, scaffolding, cutting holes, grouting and making good to damages in wall, floor, ceiling etc. for fixing accessories, foundation bolts etc., hoist way wiring and other associated Wirings including Fireman's switch complete in all respect as per direction of Engineer-in-charge. the Lift car should be fabricated by utilising maximum Space in the lift well. (i.e. moving car should be customized according to lift well size only). Warranty of the lift should be 3 years from the date of handing over of the lift
Dismantling of old lifts
Civil and Electrical works as per the site conditions
Buyback Amount for disposal ( loading/unloading, freight charges etc in the scope of contractor only)
Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 1st Year CAMC charges
Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 2nd Year CAMC Charges
Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 3rd Year CAMC Charges
Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 4th Year CAMC Charges
Supply of all required spares and Annual Comprehensive Maintenance Contract (AMC) after the expiry of the guarantee period of 3 YEARS including cost, conveyance, loading, unloading, royalties, taxes of all materials and cost of all labors, sundries etc., as per the direction of the Engineer -in -charge. 5th Year CAMC Charges
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_301453.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .