Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.9 LAccepted-AOC R O VILLAGE ARDHA P O NASLOH TEHSIL SADAR DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | L-1 | Accepted-AOC ok | |
| 2 | L-2₹55.5 L+₹1.3 L (2.39%)Rejected-Finance | L-2 | Rejected-Finance Reject | |
| 3 | L-3₹60.4 L+₹6.3 L (11.6%)Rejected-Finance | L-3 | Rejected-Finance Reject | |
| 4 | L-4₹61.1 L+₹7.0 L (12.9%)Rejected-Finance | L-4 | Rejected-Finance Reject | |
| 5 | L-5₹62.2 L+₹8.0 L (14.8%)Rejected-Finance | L-5 | Rejected-Finance Reject |
Tender Value
₹61.7 L
EMD Value
₹94,000
Closing Date
28 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE HPPWD DIVISION BHARWAIN
O/o The EE HPPWD DIVISION BHARWAIN
Construction of 10- Bedded Ayurvedic Hospital at Talmehra Distt. Una (SH. C/O main building civil work, water supply and sanitary installation,septic tank and rain water harvesting tank
2022_PWD_65334_1
Construction of 10- Bedded Ayurvedic Hospital
Open Tender
Civil Works - Buildings
Item Rate
365 days
Talmehra
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
₹94,000
Yes
3 Jul 2023
22 Sept 2022
29 Sept 2022
22 Sept 2022
28 Sept 2022
22 Sept 2022
75 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work in foundation and trenches etcetera in all kind and classification of soil such as pick work, jumper work, pick jumper work, blasting work and hard blasting work and saturated soil any other mixed verity of soil in dry or saturated condition upto any depth and lift upto any height including chiseling/wedging out rocks where blasting prohibited dewatering pumping or bailing out water where required and/ removal of slush seprately as directed which may arise during the execution including stacking the serviceable and unserviceable material and then returning stacked soil in any thickness of layers when required into plinth side of foundation etcetera consolidating each deposited layers by ramming and watering then disposing of all surplus unserviceable excavated earth as specified dumping place as per the direction by Engineer in charge including entire carriage of materials sale tax with in all leads and lifts and other incidentialss. Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Per Cubic meter . | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per CPWD specifications 2019 complete and direction by the Engineer in charge including entire carriage of materials within all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | 10.88 | Per Cubic meter . | - | - |
| - | Excavating trenches of required width for pipes, cables, etcetra exceeding 80 mm (eighty millimeter) dia. but not exceeding 300 mm (three hundred millimeter) dia including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth , including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm (twenty centimeter) in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within any lead as per CPWD specifications 2019 complete and direction by the Engineer in charge including entire carriage of materials within all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | 20 | Per Running meter | - | - |
| - | Providing and laying cement concrete 1:5:10 (one cement : five coarse sand : ten graded/crushed stone aggregate 40 mm (forty millimeter) nominal size up to haunches of 100mm (one hundred millimeter) dia meter S.W. pipes including bed concrete as per standard design as per the direction by the Engineer in charge including carriage of materials with in all leads and lifts and other incidentals. The rate including octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 20 | Per Running meter | - | - |
| - | Providing and filling of hard stone/boulder under floor upto 22.5 cm (twenty two point five centimeter thick at site as per the direction by the Engineer in charge and including entire carriage of materials within all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Per Cubic meter . | - | - |
| - | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work as per CPWD specifications 2019 complete specifications in foundations, footings, bases of columns, etc. for mass concrete as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | 53.06 | Per Square meter | - | - |
| - | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work as per CPWD specifications 2019 complete specifications in Columns, Pillars, Piers, Abutments, Posts and Struts as per the direction by the Engineer in charge upto any floor level including entire carriage of materials with in all leads and lifts and other incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | 110.16 | Per Square meter | - | - |
| - | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work in Suspended floors, roofs, landings, balconies and access platform as per CPWD specifications 2019 complete and direction of Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Per Square meter | - | - |
| - | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work as per CPWD specifications 2019 in Lintels, beams, plinth beams, girders, bressumers and cantilevers as per CPWD specifications 2019 complete and direction of Engineer in charge upto any floor level including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | - | Per Square meter | - | - |
| - | Providing form work with steel plates 3.15mm (three point fifteen millimeter) thick welded with angle iron in frame 30×30×5mm (thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies upto any height of propping and centring below supporting floor to ceiling upto any height and removal of the same for in-situ reinforced cement concrete and plain concrete work as per CPWD specifications 2019 complete specifications in Stairs, (excluding landings) except spiral stair cases as per the direction by the Engineer in charge including entire carriage of materials with in all leads and lifts and other incidentials . The rates are inclusive octroi, royality, Malkana, toll tax, sale tax, goods service tax, labour cess or other taxes imposed by the Government. | 44.36 | Per Square meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
10BeddedAyurvedicHospitalTalmehra.pdf
Tender Document • 2.27 MB
Tendernotice_2.pdf
Tender Document • 0.07 MB
ALLCONDITIONS.pdf
Tender Document • 0.05 MB
Tendernotice_1.pdf
Tender Document • 0.81 MB
BOQ_98372.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .