Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹26.8 L
Closing Date
13 Aug 2026, 10:00 am4d left
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-04 LOT-02
2026_UPIDC_1175306_2
04/SE-VII/2026-27
Open Tender
Civil Works - Canal
Item Rate
270 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹26.8 L
Lucknow
8 Aug 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick jungle and thorney bushes without uprooting with proper disposal including labour and t&p etc, required for proper completion of work | 7,35,529.84 | Sqm | - | - |
| 2 | Earth work in Strengthening of left Bank ,Common Bank repair of outer & inner slopes including all lead & lift excluding mechnical compaction but including manual compaction & dressing to profile, including labour and t&p etc, required for proper completion of work | 5,52,949.2 | Cum | - | - |
| 3 | Providing and fixing of 3.50 m long Bamboos khutta 50 to 80 mm including all cost of material, labour T& P etc | 57,799 | No | - | - |
| 4 | Providing and fixing of Bamboos bracing 50 to 80 mm including all cost of material, labour T& P etc | 1,04,038.2 | Rmt | - | - |
| 5 | Providing & laying E.C. bag filled with Local earth/silt including all cost of material, labour T& P etc | 85,782 | No | - | - |
| 6 | Providing and filling of jhankar including all cost of material, labour T& P etc | 15,605.73 | Cum | - | - |
| 7 | Earth work in excavation of foundation including initial lead upto 30m & lift upto 1.5m ,manual compaction and dressing to profile. | 2,655 | Cum | - | - |
| 8 | P.C.C. 1:4:8 With cement , coarse sand and Stone Ballast 20 to 40 mm size including all cost of material, labour T & P etc. for requred for proper competion of work. | 49.34 | Cum | - | - |
| 9 | Centering & Shuttering for C.C. work including rent of shuttering material labour and T&P required for proper complition of work. | 1,847.15 | Sqm | - | - |
| 10 | P.C.C. 1:2:4 With cement , coarse sand and Stone Ballast 13.2 to 20 mm size including all cost of material, labour T & P etc.for requred for proper competion of work. | 312.81 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2208704.xls
BOQ • 0.33 MB
BID04LOT02.pdf
Tender Documents • 2.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].