Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC Negosatated Ratesuoted rate | |
| 2 | L2₹10.3 L+₹37,550 (3.79%)Rejected-Finance | L2 | Rejected-Finance hair bidders | |
| 3 | L3₹14.7 L+₹4.8 L (48.0%)Rejected-Finance HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L3 | Rejected-Finance hair bidders | |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE PANJSEI P O HOLI TEHSIL BHARMOUR DISTRICT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹9.7 L
EMD Value
₹19,416
Closing Date
2 Jul 2024, 11:00 amClosed
AGM WSD SJPNL
AGM WSD SJPNL US CLUB SHIMLA 171001
LWSS Shimla From Chair pumping station SH Repair of centrifugal pump 670HP installed at set No 1 from LWSS Chair
2024_SJPNL_89526_1
2074 dated 21/06/2024
Open Tender
Pumps/Motors
Item Rate
90 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Yes
₹19,416
Yes
3 Sept 2024
21 Jun 2024
2 Jul 2024
21 Jun 2024
2 Jul 2024
21 Jun 2024
21 Jun 2024 - 2 Jul 2024
Amount
Removal of pump from foundation and shifting to workshop for repair including loading and unloading at both side including carriage of material upto all leads and lifts complete in all respect and as per directionof Engineer-in-charge.
Dismantling of complete pump after heating with complete in all respect and as per the direction of Engineer-in-charge.
P/Fbearing 3310BTNG-C3,SKF make complete in all respect and as per the direction of Engineer-in-charge.
P/F bearing bushes complete in all respect and as per the direction of Engineer-in-charge.
P/F impeller complete in all respect and as per the direction of Engineer-in-charge.
P/F shaft of SS 410 material complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
Repair of diffusers complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer -in-charge.
P/F neck ring complete in all respect i/c carriage upto all leads and lifts and as per the direction of the Engineer-in-charge.
P/F guide bushes complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
P/F gland sleeves complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
P/F of o Rings complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
P/F Balance disc complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
P/F coupling complete in all respect i/c carriage upto all leads and lifts and as per the direction of Engineer-in-charge.
SIDDARTH BAKSHI
SS ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .