Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.3 CrAccepted-AOC | ₹20.3 Cr Quoted ₹20.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹20.4 Cr+₹8.9 L (0.44%)Rejected-AOC S NO 280 2 A GALO NO 1 2 3 PLOT NO 358 2 MANIK ELITE BARAMATI DIST PUNE 413102 | PUNE | MAHARASHTRA | 413102 | ₹20.4 Cr+₹8.9 L (0.44%) | L2 | Rejected-AOC L2 |
| 3 | L3₹20.6 Cr+₹20.4 L (1.00%)Rejected-Finance | ₹20.6 Cr+₹20.4 L (1.00%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical 13 UTKARSH HOUSING SOCIETY SHARADA NAGAR CHOWK AMBAJOGAI ROAD LATUR 413512 | LATUR | MAHARASHTRA | 413512 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Narendra R Kale L1 | K H CONSTRUCTION L3 | AVT INFRASTRUCTURE PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00PART – A (Work Portion) | ||||||
| 2.00I) Civil Work Portion | ||||||
| 3.00ITEM No. 1 :- Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) | ||||||
| 4.00 | A) Proper Building | 481.55 | One Cubic Metre | 228 ₹1,09,793.4 Lowest | 230 ₹1,10,756.5 | 229 ₹1,10,274.95 |
| 5.00 | B) Compound Wall | 101.97 | One Cubic Metre | 228 ₹23,249.16 Lowest | 230 ₹23,453.1 | 229 ₹23,351.13 |
| 6.00 | C) Water Storage Tank | 43.51 | One Cubic Metre | 228 ₹9,920.28 Lowest | 230 ₹10,007.3 | 229 ₹9,963.79 |
| 7.00 | D) CC Road | 1,334.85 | One Cubic Metre | 228 ₹3,04,345.8 Lowest | 230 ₹3,07,015.5 | 229 ₹3,05,680.65 |
| 8.00ITEM No. 2 :- Excavation for foundation in Hard murum including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre ) | ||||||
| 9.00 | A) Proper Building | 481.55 | One Cubic Metre | 250 ₹1,20,387.5 Lowest | 253 ₹1,21,832.15 | 251 ₹1,20,869.05 |
| 10.00 | B) Compound Wall | 101.97 | One Cubic Metre | 250 ₹25,492.5 Lowest | 253 ₹25,798.41 | 251 ₹25,594.47 |
Tender Value
₹19.4 Cr
EMD Value
₹9.7 L
Closing Date
8 Apr 2026, 6:55 pmClosed
Executive Engineer Public Works Division, Latur
Executive Engineer Public Works Division, Latur
Construction of Sahakar Sankul in the premises of Dalda Factory Survey No.142 B, Latur, Tq.Latur, District Latur.
2026_PWR_1291452_1
Notice No. B-2 LTR- 28/01 For 2025-26 E-Tender
Open Tender
Civil Works
Item Rate
547 days
Latur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹9.7 L
Chief Engineer, P W Region, Nanded
22 Jul 2026
30 Mar 2026
10 Apr 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART – A (Work Portion) | |||||
| 2I) Civil Work Portion | |||||
| 3ITEM No. 1 :- Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) | |||||
| 4A) Proper Building | |||||
| 5B) Compound Wall | |||||
| 6C) Water Storage Tank | |||||
| 7D) CC Road | |||||
| 8ITEM No. 2 :- Excavation for foundation in Hard murum including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre ) | |||||
| 9A) Proper Building | |||||
| 10B) Compound Wall | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
TENDERDOCUMENT2801.pdf
Tender Documents • 3.98 MB
BOQ_2219890.xls
BOQ • 0.73 MB
Date2026_PWR_1291452_1.pdf
PDF • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .