Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.1 CrAdmitted-Finance B 304 RAJAJIPURAM AMBA PALACE AWAS VIKAS COLONY LUCKNOW UTTAR PRADESH 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 3 | L1₹1.1 CrAdmitted-Finance MOHALLA ADARSH NAGAR CIVIL LINE BUDAUN | BUDAUN | BUDAUN | UTTAR PRADESH | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 4 | L1₹1.1 CrAdmitted-Finance NA | NEW DELHI | DELHI | 110001 | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
| 5 | L1₹1.1 CrAdmitted-Finance | -15.00% | ₹1.1 Cr | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8.7 L
Closing Date
3 Feb 2025, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Mannay Kallayan Singh ward me Narauana me Kakori Modh se Puliya tak RCC Dreep Drean ewm nali ka kary.
2025_DOLBU_994892_3
230/CE/24-25
Open Tender
Civil Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,746
Lucknow Municipal Corporation
₹8.7 L
21 Feb 2025
18 Jan 2025
3 Feb 2025
18 Jan 2025
3 Feb 2025
18 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling brick work or stone work in lime of cement mortar and including stacking of materials as directed by the Engineer-in-charge with in a distance of 60 metres (200ft.) | 7.16 | cum | 504 | ₹3,608.64 |
| 2 | Earth work in surface excavition not exceeding 30cm depth but exceeding 1.5m in widh as well as on plan icluding etc | 2,451.3 | cum | 156 | ₹3,82,402.8 |
| 3 | Cartage of ballast, kankar, coal, grit or sand etc including loading and unloading but excluding stacking on pucca roads. | 2,206.17 | cum | 165.7 | ₹3,65,562.37 |
| 4 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:6:12 (1 cement : 6 coarse sand (zone-III) 12 graded brick aggregate 40 mm (norminal size) | 169.34 | cum | 4,553 | ₹7,71,005.02 |
| 5 | Brick work with common burnt day ( non modular ) brick of class -150 in foundation and plinth in Cement morter 1:4 (1cement : 4 coarse sand) | 41.59 | Cum | 6,715 | ₹2,79,276.85 |
| 6 | 12 mm cement plaster of mix 1:4 ( 1 cement 4 coarse sand) | 244.2 | SQM | 186 | ₹45,421.2 |
| 7 | providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) 4 graded stone aggregate 20mm nominal size | 16.58 | cum | 6,990 | ₹1,15,894.2 |
| 8 | providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering and shuttering finishing and reinforcement all work upto plinth level 1:2:4 (1 cement : 2 coarse sand :4 graded stone aggregate 20mm nominal size | 807.28 | cum | 7,340 | ₹59,25,435.2 |
| 9 | Structural steel work in single section fixed with of without connecting plate including cuting hoisting fixing in position and applying a priming coat of approved steel primer all complete | 792.14 | Qtl | 6,900 | ₹54,65,766 |
| 10 | S/F of Name board etc all comp | 1 | No | 4,000 | ₹4,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .