Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | L1 | Accepted-Finance _ | |
| 2 | L2₹3.3 L+₹1.2 L (57.2%)Accepted-Finance | L2 | Accepted-Finance _ | |
| 3 | L3₹3.8 L+₹1.7 L (80.2%)Accepted-Finance | L3 | Accepted-Finance _ | |
| 4 | L4₹4.1 L+₹2.0 L (92.7%)Accepted-Finance MUNICIPALITY ROAD OPPOSITE DPL BHAT BUILDING KARAN NAGAR BATAMALOO SRINAGAR SRINAGAR JAMMU KASHMIR 190010 | SRINAGAR | JAMMU AND KASHMIR | 190010 | L4 | Accepted-Finance _ |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
26 Aug 2021, 11:00 amClosed
Executive Engineer, ED Budgam, KPDCL
Office of the Executive Engineer, ED Budgam, KPDCL
Repairing of High Mast Lights, Lighting of Imambaras _ approach roads falling under the jurisdiction of ED Budgam, KPDCL (URGENT NATURE OF WORK IN VIEW OF MUHARRAM)
2021_PDD_134749_1
EDB_59_of_2021_22
Open Tender
Electrical and Maintenance Works
Turn-key
3 days
BUDGAM
AS PER SBD
7 documents required · 7 mandatory
₹500
Executive Engineer, ED Budgam, KPDCL
₹10,000
30 Aug 2021
16 Aug 2021
26 Aug 2021
16 Aug 2021
26 Aug 2021
16 Aug 2021
16 Aug 2021 - 16 Aug 2021
Amount
Repairing of High Mast Lights by way of replacement of non functional units, DP MCB's and 1.5 sqmm multi standard PVC Copper wire.
Supply installation, testing and comissioning of 30 watt LED lights mounted on iron bends including providing of requisite length of flexible wire and switch. (LEDs must be Havells, philips or equivalent make)
Supply installation, testing and comissioning of 9 watt, 230 volts 50Hz LED Bulbs/ Lamps including providing of requisite length of flexible wire and switch. (LED Bulbs/Lamps must be Havells, philips or equivalent make).
Supply installation, testing and comissioning of 1.5 sqmm multi standard PVC copper wire.
Supply installation, testing and comissioning of 1 sqmm multi standard PVC copper wire.
Supply installation, testing and comissioning of MCB DP of 6 Amps.
Supply installation, testing and comissioning of 16 sqmm 2-core cable.
Supply installation, testing and comissioning of Pandent Holder.
Supply installation, testing and comissioning of Pandent Switches.
Supply installation, testing and comissioning of insulation tape.
Hiring of Gen Sets 2800 VA for 5 days with fuel alongwith providing of changeover facility.
NOTE: 1.The rates quoted by the bidder for all the line items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges.The quantity of material is subjected to vary.
M/S G E C ELECTRICALS
M/S AL-MUSTAFFA ELECTRICAL
AL HASSAN ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .