Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.4 LAccepted-AOC | ₹3.4 L | L-1 | Accepted-AOC Accepted as a L-1 Bidder |
| 2 | L-2₹3.4 LRejected-Finance KHANDRA BARDHAMAN 713363 WEST BENGAL INDIA | KHANDRA | BARDHAMAN | WEST BENGAL | 713363 | ₹3.4 L | L-2 | Rejected-Finance Rejected as a L- 2 Bidder |
| 3 | Rejected-Technical 59 R G S ROAD USHAGRAM DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical Not Eligible for price bid opening |
| Sl No | Description | Qty | Unit | KEKA ARMATURE REPAIRING SHOP L2 | NEW ELECTRICAL CONCERN L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of core winding from
Transformer Tank | 1 | NOS. | 3,625 ₹3,625 | 3,500 ₹3,500 |
| 2.00 | Supply & installation of new electrolyte grade
copper wire/strip for primary coil & secondary coil (180 Kg + 153 Kg) = 333 Kg x 876 = 2,91,708/- Less scrap = 327 Kg x 508 = 1,66,116/- Total Value = (2,91,708 - 1,66,116) = 1,25,592/- | 1 | Nos. | 1,35,250 ₹1.4 L | 1,34,595 ₹1.3 L |
| 3.00 | Re-insulation cost of primary & secondary barecopper strip of secondary bare copper strip by double cover nomex paper of thickness 2 mm | 333 | KG. | 141 ₹46,953 | 140 ₹46,620 |
| 4.00 | Supply & installation of F class insulation
materials such as glass fiber board, phase
separator, oil duet etc | 1 | Nos. | 16,250 ₹16,250 | 16,250 ₹16,250 |
| 5.00 | Re-formation of primary & Secondary coils
(Barreltype) | 333 | KG. | 51 ₹16,983 | 50 ₹16,650 |
| 6.00 | Cost of wooden forma for formation of coils | 1 | Nos. | 3,450 ₹3,450 | 3,200 ₹3,200 |
| 7.00 | Supply of F class varnish | 10 | Ltr. | 520 ₹5,200 | 510 ₹5,100 |
| 8.00 | Supply of Thinner | 3 | Ltr. | 210 ₹630 | 200 ₹600 |
| 9.00 | Re-assembly of new coils with
interconnection with proper blazing,
bakingiheating properly to improve lR value
up to require level | 1 | NOS. | 6,700 ₹6,700 | 6,500 ₹6,500 |
| 10.00 | CompleteTesting charges | 1 | NOS. | 3,250 ₹3,250 | 3,000 ₹3,000 |
Tender Value
₹3.1 L
EMD Value
₹4,000
Closing Date
8 Jul 2025, 5:00 pmClosed
General Manager, Kunustoria Area
O/o The General Manager, Kunustoria Area, P.O- Toposi, Paschim Bardhaman, 713362
Complete repairing/rewinding 315KVA, 3.3KV/550V TSU at 19R u/g substation of Kunustoria Colliery
2025_ECL_338493_1
ECL/KNT/EnM/e-Ten/25-26/2 26.06.2025
Open Tender
Miscellaneous Works
10 days
Kunustoria Area
As per NIT
4 documents required · 4 mandatory
₹4,000
8 Jun 2026
27 Jun 2025
9 Jul 2025
27 Jun 2025
8 Jul 2025
28 Jun 2025
28 Jun 2025 - 1 Jul 2025
Amount
Dismantling of core winding from Transformer Tank
Supply & installation of new electrolyte grade copper wire/strip for primary coil & secondary coil (180 Kg + 153 Kg) = 333 Kg x 876 = 2,91,708/- Less scrap = 327 Kg x 508 = 1,66,116/- Total Value = (2,91,708 - 1,66,116) = 1,25,592/-
Re-insulation cost of primary & secondary barecopper strip of secondary bare copper strip by double cover nomex paper of thickness 2 mm
Supply & installation of F class insulation materials such as glass fiber board, phase separator, oil duet etc
Re-formation of primary & Secondary coils (Barreltype)
Cost of wooden forma for formation of coils
Supply of F class varnish
Supply of Thinner
Re-assembly of new coils with interconnection with proper blazing, bakingiheating properly to improve lR value up to require level
CompleteTesting charges
Painting of the entire Transformer
Heating, testing drying
Cost of rod, gas oxygen
Supply of moulded 3.3KV bush insulator
Add. Overhead & supervision cost @ 10% on above
Both side transportation with handling charges
Total impact of GST for the purpose of CTC
KEKA ARMATURE REPAIRING SHOP (BID ID -1164833)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid