Tender Value
₹56.6 L
EMD Value
₹56,600
Closing Date
5 Oct 2026, 2:00 pm
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_706922_1
OT-026/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Tindivanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹56,600
Yes
22 Sept 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for Clearing of juliflora jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site. | 375 | M2 | - | - |
| 2 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 291.55 | M3 | - | - |
| 3 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Soft Disintegrated Rock not requiring blasting including cost of all materials lead lift etc complete | 17.15 | M3 | - | - |
| 4 | Earth work excavation and depositing on bank with initial lead of 10m and lift of 2m in Medium rock and dense medium rock not requiring blasting including the cost of all materials lead lift etc complete as directed by the department engineer at site. | 34.3 | M3 | - | - |
| 5 | Supplying and filling with M- Sand for foundation layer not more than 15cm thick including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 23 | M3 | - | - |
| 6 | Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 35 | M3 | - | - |
| 7 | Labour charges for back filling of pits with excavated earth other then sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete. | 273.1 | M3 | - | - |
| 8 | Labour charges for removal of surplus earth from the site and putting into low lying area inside the yard upto 5 Kms away from the site including the cost of all labour, transport, lead, lift etc., complete as directed by the department engineer at site. | 69.9 | M3 | - | - |
| 9 | R:C:C 1:11/2:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 61.82 | M3 | - | - |
| 10 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 176.28 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_849619.xls
BOQ • 0.31 MB
OT026.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .