| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | -15.00% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹5,999.69 (2.35%)Admitted-Finance | -13.00% | ₹2.6 L+₹5,999.69 (2.35%) | L2 | Admitted-Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
29 Jun 2026, 4:00 pmClosed
Executive Engineer, Water Works Division Srinagar
SRINAGAR
PLEASE REFER TO BOQ
2026_PHE_313069_1
11/WWD/Sgr/Civil of 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer, Water Works Division Srinagar
₹6,000
3 Aug 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : (15 to 40mm dia nominal bore) | 120 | mtr | 109.65 | ₹13,158 |
| 2 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous Road. | 13.5 | sqm | 305.95 | ₹4,130.33 |
| 3 | Earthwork in excavation by manual means in trenches for a foundation, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All Kinds of Soil. | 40.5 | cum | 479.3 | ₹19,411.65 |
| 4Providing and fixing G.I pipes complete with G.I fittings excluding trenching and refilling etc. (external work). Light class. | |||||
| 4.01 | 40 mm dia nominal bore. | 200 | mtr | 434.65 | ₹86,930 |
| 4.02 | 25 mm dia nominal bore. | 182 | mtr | 311.95 | ₹56,774.9 |
| 5Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work | |||||
| 5.01 | 25mm dia GI pipe (desmentaled) | 120 | mtr | 33.7 | ₹4,044 |
| 6Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee including cutting and threading the pipe etc. complete. | |||||
| 6.01 | 25 to 40mm dia nominal bore | 12 | each | 730.25 | ₹8,763 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.19 MB
BOQ_1013137.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .