| 1 | L1₹15.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹17.8 L+₹2.2 L (14.2%)Rejected-Finance | L2 | Rejected-Finance REJECT |
Tender Value
₹18.8 L
EMD Value
₹38,000
Closing Date
25 Nov 2022, 10:00 amClosed
EX.EN. IRRIGATION DIVISION, BARAUT (BAGHPAT)
EX.EN. IRRIGATION DIVISION, KOTANA ROAD, BARAUT (BAGHPAT)
Reconstruction of V.R.B. at Km. 21.720 of Nala Dy.
2022_UPIDC_742389_12
07/EE/2022-23
Open Tender
Miscellaneous Works
Item Rate
90 days
BARAUT
Reconstruction of V.R.B. at Km. 21.720 of Nala Dy.
2 documents required · 2 mandatory
₹854
₹38,000
Yes
16 Dec 2022
19 Nov 2022
25 Nov 2022
19 Nov 2022
25 Nov 2022
19 Nov 2022
19 Nov 2022 - 25 Nov 2022
Amount
Earth work in excavation in foundation in all type of Soil I/C all lead, lift & back filling.
Laying Cement Concrete P.C.C. M - 10 (1:3:6) in foundation with stone ballast & Coarse sand I/C all cost of material,labour and T.& P. etc. complete.
Laying Cement Concrete P.C.C. M-15 (1:2:4 ) in foundation with stone ballast & Coarse sand I/C all cost of material,labour and T.& P. etc. complete.
Laying Cement Concrete R.C.C. M-20 (1:1.5:3 ) in Transition wall with stone ballast & Coarse sand I/C all cost of material,labour and T.& P. etc. complete.
Laying Reinforced Cement Concrete in RCC M-25 (1:1:2) (Cement,Coarse sand & Shingle 10-20 mm size) mixed with all cost of material,labour and T.& P. etc. complete.
Centering & Shuttering for R.C.C. work with all cost of material, labour & T.& P. etc. complete.
Steel Reinforcement with cutting, Bending, Binding & Placing in proper position with cost of all material,labour & T.& P. etc. complete.
S/Laying brick bats including cost of all labour and T&P etc. Complete.
Dry Brick Pitching on Side Slopes in Launching Apron Portion i/c cost of all material, labour and T&P etc. Complete.
Supplying & fixing Drainage Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.
S/Fixing thermocoal sheet on expansion joints / RM
Tar Paper Bearing Below Approach Slab
Dismantling of R.C.C. work i/c labour, T&P etc. complete of work
Dismantling of Brick Work i/c labour, T&P etc. completion of work.
SS ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .