Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.6 L
EMD Value
₹29,220
Closing Date
29 Jun 2020, 4:00 pmClosed
Executive Engineer
PWD R and B Spl. Sub Division Doda
As per NIT/SBD
2020_PWDJK_98687_1
e-NIT 01/MCD of 2020-21
Open Tender
Civil Works
Item Rate
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer
₹29,220
Yes
15 Jul 2020
22 Jun 2020
30 Jun 2020
22 Jun 2020
29 Jun 2020
22 Jun 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1O sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil (including all leads, lifts and carriages) What so ever.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Nallah (including all leads, lifts and carriages)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed with 20% boulders. (Nallah) (including all leads, lifts and carriages)
Centring and shuttermg including strutting, propping etc. and removal of form for· (including all leads, lifts and carriages)
Foundations: footings, bases of columns etc. for mass concrete.
Suspended floors, roofs, landings, balconies and access platform.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level. 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) (including all leads, lifts and carriages)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. (including all leads, lifts and carriages)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) (including all leads, lifts and carriages)
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mmthick with 20mm nominal size stone aggregate. Crushed. (including all leads, lifts and carriages)
Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works (including all leads, lifts and carriages)
MANZOOR AHMED NATNOO
m/s thukar const
Mohd Waseem Sheikh
Mr. Aftab Ahmed Indrabi
Asif ahmed
M/S Khora Construction and traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .