Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance | ₹2.2 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹2.3 Cr+₹10.2 L (4.58%)Rejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹2.3 Cr+₹10.2 L (4.58%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹2.4 Cr+₹16.1 L (7.19%)Rejected-Finance CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | ₹2.4 Cr+₹16.1 L (7.19%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | L4₹2.5 Cr+₹28.5 L (12.7%)Rejected-Finance GULALI VATIKA GEETA VATIKA SHAHPUR DISTRICT GORAKHPUR | ₹2.5 Cr+₹28.5 L (12.7%) | L4 | Rejected-Finance HIGH RATE BIDDER |
| 5 | L5₹2.7 Cr+₹47.3 L (21.1%)Rejected-Finance | ₹2.7 Cr+₹47.3 L (21.1%) | L5 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | M/s Vishal Construction L4 | M/S OBELION CONSTRUCTIONS L1 | M/S BHAGWATI TRADERS L3 | M/s Nav Bharat Construction L2 | M/S PRATAP NIRMAN SANSTHAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 9,929.8 | M3 | 70 ₹6,95,086 Lowest | 77.86 ₹7,73,134.23 | 81 ₹8,04,313.8 | 98.8 ₹9,81,064.24 | 105 ₹10,42,629 |
| 2.00 | Earth work in making Canal diversion in all type of soil with proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 16,368 | M3 | 80 ₹13,09,440 | 78 ₹12,76,704 Lowest | 79 ₹12,93,072 | 90 ₹14,73,120 | 100 ₹16,36,800 |
| 3.00 | Earth work in making Ringbund / coffer dam / embankment/dowla / ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. | 8,450.13 | M3 | 60 ₹5,07,007.8 Lowest | 82.5 ₹6,97,135.72 | 80 ₹6,76,010.4 | 94.4 ₹7,97,692.27 | 100 ₹8,45,013 |
| 4.00 | Laying P.C.C in 1:2:4 with cement, Hamirpur coarse sand F.M. not less than 2.00 and 20 to 40mm crushed Kabrai stone ballast with mechanical mixing, ramming, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 86.56 | M3 | 10,100 ₹8,74,256 | 8,100 ₹7,01,136 Lowest | 9,000 ₹7,79,040 | 8,812.7 ₹7,62,827.31 | 11,015 ₹9,53,458.4 |
| 5.00 | Laying C.C 1:2:4 with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 273.62 | M3 | 10,800 ₹29,55,096 | 9,285 ₹25,40,561.7 | 9,600 ₹26,26,752 | 9,125 ₹24,96,782.5 Lowest | 11,406 ₹31,20,909.72 |
| 6.00 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 514.82 | M3 | 11,500 ₹59,20,430 | 9,690 ₹49,88,605.8 Lowest | 11,500 ₹59,20,430 | 9,690 ₹49,88,605.8 Lowest | 12,113 ₹62,36,014.66 |
| 7.00 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 36.48 | M3 | 11,500 ₹4,19,520 | 9,885 ₹3,60,604.8 Lowest | 11,500 ₹4,19,520 | 9,886 ₹3,60,641.28 | 12,357 ₹4,50,783.36 |
| 8.00 | Laying R.C.C M30 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 22.51 | M3 | 12,000 ₹2,70,120 | 10,190 ₹2,29,376.9 Lowest | 12,000 ₹2,70,120 | 10,195 ₹2,29,489.45 | 12,744 ₹2,86,867.44 |
| 9.00 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 72 | M3 | 5,400 ₹3,88,800 | 4,548 ₹3,27,456 Lowest | 5,829.23 ₹4,19,704.56 | 4,663 ₹3,35,736 | 5,829 ₹4,19,688 |
| 10.00 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.
(b) Pea gravel 6mm to 10mm size | 87.19 | M3 | 5,500 ₹4,79,545 | 599 ₹52,226.81 Lowest | 6,065.78 ₹5,28,875.36 | 4,852.62 ₹4,23,099.94 | 6,065 ₹5,28,807.35 |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Construction of VRB at km 20.550 on Rapti Main Canal in District Shrawasti.
2026_UPIDC_1167986_2
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
270 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,452
₹5.8 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 9,929.8 | M3 | 123.5 | ₹12,26,330.3 |
| 0.0 | Earth work in making Canal diversion in all type of soil with proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 16,368 | M3 | 112.5 | ₹18,41,400 |
| 0.0 | Earth work in making Ringbund / coffer dam / embankment/dowla / ramp in all type of soil including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. | 8,450.13 | M3 | 118 | ₹9,97,115.34 |
| 0.0 | Laying P.C.C in 1:2:4 with cement, Hamirpur coarse sand F.M. not less than 2.00 and 20 to 40mm crushed Kabrai stone ballast with mechanical mixing, ramming, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 86.56 | M3 | 11,015.88 | ₹9,53,534.57 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 273.62 | M3 | 11,406.4 | ₹31,21,019.17 |
| 0.0 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur Coarse sand F.M. not less than 2.00 and 4.75 to 20mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 514.82 | M3 | 12,113.1 | ₹62,36,066.14 |
| 0.0 | Laying R.C.C M25 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 36.48 | M3 | 12,357.97 | ₹4,50,818.75 |
| 0.0 | Laying R.C.C M30 in super structure of bridge with cement, Hamirpur coarse sand and 4.75 to 12 mm crushed Kabrai stone grit with mechanical mixing, vibration, laying, curing etc. including all cost of material, labour, T&P etc. required for proper completion of work. | 22.51 | M3 | 12,744.94 | ₹2,86,888.6 |
| 0.0 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 72 | M3 | 5,829.23 | ₹4,19,704.56 |
| 0.0 | Supply and laying graded filter materials including cost of all material, labour, T&P etc. required for proper completion of work.
(b) Pea gravel 6mm to 10mm size | 87.19 | M3 | 6,065.78 | ₹5,28,875.36 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT02.pdf
Tender Documents • 5.95 MB
BOQ_2190564.xls
BOQ • 0.29 MB
BOQ_2190564.xls
PDF • 0.31 MB
DATE.pdf
PDF • 0.26 MB
BOQ02.xls
PDF • 0.29 MB
BOQCORRIGENDUM.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .