| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹59.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹86.1 L+₹3.9 L (4.74%)Rejected-Finance | L-2 | Rejected-Finance Not found L-1 | |
| 3 | L-3₹90.0 L+₹7.8 L (9.52%)Rejected-Finance | L-3 | Rejected-Finance Not found L-1 | |
| 4 | L-4₹90.3 L+₹8.1 L (9.90%)Rejected-Finance | L-4 | Rejected-Finance Not found L-1 |
| Sl No | Description | Qty | Unit | popular pipes L4 | H.N.SINGH AND COMPANY L1 | ABTAR SINGH AND COMPANY L2 | Moti lal kapila L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Transportation of Rig along with allied accessories etc. complete including errection and levelling at site, through all kinds of roads, approaches fields errection and levelling at site, through all kinds of roads, approaches fields etc. in all leads and lifts completed in all respects as per the directions of Engineer - in-Charge. | 2 | Job | 30,000 ₹60,000 Lowest | 35,000 ₹70,000 | 40,000 ₹80,000 | 40,000 ₹80,000 |
| 2.00Drilling of bore as per specifaction laid down in IS2800-1991 (part-I) with upto-date amnedments,if any,with Direct Rotary Rig or combination drilling rig,Precussion Rig starting with 650-600 mm dia M.S pipe reduced to 450-400 mm dia M.S pipe conforming to IS 4270-2001 with up-to-date amendements,if any, in all kind of soils, boulders, rocks, collapsible strata,sturated soils,artesian conditions including the cost of all consumable,stores,water,fuel,lubricants and including cost on account of logging of drilled bore hole, if any other accessories etc. complete in all respects as per the directions of the Engineer -in -Charge. | |||||||
| 2.01 | i) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 3-30 mtrs below ground level within all leads and lifts. | 60 | Meter | 9,000 ₹5,40,000 | 6,000 ₹3,60,000 | 6,150 ₹3,69,000 | 5,500 ₹3,30,000 Lowest |
| 2.02 | ii) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 30-60 mtrs below ground level within all leads and lifts. | 60 | Meter | 10,000 ₹6,00,000 | 6,500 ₹3,90,000 Lowest | 6,650 ₹3,99,000 | 7,400 ₹4,44,000 |
| 2.03 | iii) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 60-90 mtrs below ground level within all leads and lifts. | 60 | Meter | 11,000 ₹6,60,000 | 7,600 ₹4,56,000 | 7,550 ₹4,53,000 Lowest | 8,400 ₹5,04,000 |
| 2.04 | iv) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 90-140 mtrs below ground level within all leads and lifts. | 100 | Meter | 12,000 ₹12,00,000 | 8,600 ₹8,60,000 Lowest | 8,850 ₹8,85,000 | 9,400 ₹9,40,000 |
| 2.05 | v) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 140-190 mtrs below ground level within all leads and lifts. | 60 | Meter | 13,000 ₹7,80,000 | 9,600 ₹5,76,000 Lowest | 9,800 ₹5,88,000 | 11,000 ₹6,60,000 |
| 2.06 | vi) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 190-240 mtrs below ground level within all leads and lifts. | 50 | Meter | 14,000 ₹7,00,000 | 10,600 ₹5,30,000 Lowest | 11,000 ₹5,50,000 | 13,000 ₹6,50,000 |
| 2.07 | vii) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 240-290 mtrs below ground level within all leads and lifts. | 50 | Meter | 15,000 ₹7,50,000 | 11,600 ₹5,80,000 Lowest | 12,000 ₹6,00,000 | 14,000 ₹7,00,000 |
| 2.08 | vi) Drilling and lowering of M.S. Casing pipe conforming to IS 4270-2001 with up-to-date amendments,if any, of suitable sizes as mentioned above,from 290-300 mtrs below ground level within all leads and lifts. | 10 | Meter | 16,000 ₹1,60,000 | 12,600 ₹1,26,000 Lowest | 13,000 ₹1,30,000 | 15,000 ₹1,50,000 |
Tender Value
₹59.2 L
EMD Value
₹91,710
Closing Date
23 Nov 2021, 5:00 pmClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
Construction of irrigation tubewells for left out area of various villages of Haroli constituency in Distt. Una HP (SH Drilling , lowering of assembly and development of 150 mtrs deep T/well at Saloh and 300 mtrs deep T/well at Baliwal)
2021_HPIPH_53349_1
No. JSV-I/TA/E-tender/21-10814-44 dt 09-11-2021
Open Tender
Civil Works
Item Rate
60 days
150 mtrs deep T/well at Saloh and 300 mtrs deep
as per NIT
9 documents required · 9 mandatory
₹800
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹91,710
Yes
17 Nov 2025
9 Nov 2021
24 Nov 2021
9 Nov 2021
23 Nov 2021
9 Nov 2021
9 Nov 2021 - 23 Nov 2021
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .