Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11.5 L
EMD Value
₹11,460
Closing Date
24 Nov 2021, 5:00 pmClosed
RM RIICO LTD
RIICO LTD., ABU ROAD
Operation and Maintenance work of water supply scheme of various Industrial areas Abu Road
2021_RIICO_246623_2
2021/Abu Road/6461/17
Open Tender
Civil Works
Item Rate
365 days
Various industrial areas Abu road.
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹1,180
RIICO Ltd., ABU ROAD
₹11,460
Yes
3 Dec 2021
15 Nov 2021
25 Nov 2021
15 Nov 2021
24 Nov 2021
15 Nov 2021
Amount
Regular O & M of Existing Water Supply system of Industrial Areas as under- I.A Arbuda:- 1 no. Open well, 1 SR, 1CWR, Industrial area Ambaji:- 1 No. Tube well, 1 no. Open well, 1 No. Pump Room, 1 no. Pump House, 1 SR, 1CWR,H C Ambaji:- 2 Nos. Tube well, 1 no. Open well, 2 Nos. Pump Room, 1 no. Pump House, 1 SR, 1CWRI A GC-I & H C Chandrawati:- 1 No. Tube well, 1 no. Open well, 1 No. Pump Room, 1 no. Pump House, 1 SR, 1CWR,I A GC-II:- 1 No. Tube well, 3 no. Open well, 4 No. Pump Room, 2 no. Pump House, 2 SR, 2 CWR, The scope work includes:-1. Operation of Booster pumps to lift Water from source to CWR to SR (as per requirement and to maintain Hydraulic head.2. Ensure uninterrupted regular water supply to industrial units residential units, daily or alternatively as per decided or direction issued by Engineer in-charge .3. Regular supervision or Maintenance of Clear Water reservoir, Service reservoir, And all Pipe (Rising or Distribution) Network pump Room, Switch Room, Electrical motor and Complete system to ensure adequate storage of row Water for Proper supply of Water .4. All materials Like nut bolts, washers, gland packing, socket, making thread etc. required for fitting of G.I. Pipes to Pumps have to be arranged by the contractor with labour charge for the same.5. Local transportation of all types of Material required for repairing or replacement of Pipe lines, cables from Repair Engineering shop or Electrical shop for all lead and lift.6.In case of burning of motor (mono block and submersible pump and motor etc.), contractor will make immediate rewinding or maintenance of electrical motor and rectification of electrical fault on his own cost as well as, at site must have every time available Standby arrangement of Electrical motor of suitable power and capacity. Agency has to resolve all Electrical problems related of JDVVNL Line etc. In any case Water supply must be resumed within 24 hrs without assigning any reason.7. Regular maintenance of Pipelines of industrial Area for rising main line, distribution line, sluice valve or NRV etc. of complete Water supply scheme by removing of leakage as and when required without jointing material.8. Contractor has to add or mix the required quantity of alum or bleaching powder or disinfectant materials in regular water supply as per norms at his own level.9. Contractor will also maintain residual chlorine in consumption.10. Regular watch and ward for 24 hrs.of water supply campus contractor will be complete responsible for safety and security of these areas as well as for the network and system of Pipeline. (Rising main and distribution pipe line etc.)11. Contractor will be responsible for timely collection and deposition of Electrical bill of areas each month.12. Contractor will also have to execute connection or disconnection of water connection as directed by Engineer In charge. Dead plugs for disconnection will be arranged by contractor. No extra payment will be made for this work.13. Contractor or Agency will be solely responsible for any type of mishappening or accident during the awarded work of WSS, RIICO will be not Responsible or involved for any matter either legal dispute or other matter .14. At the time of completion of the work contractor will hand over the water system completely in proper order and in running condition along with details of inventory.15. Contractor will maintain the daily log book for water supply in the prescribed format as provided by the Engineer in charge. At the end of month Contractor will have to submit Photocopy of log book of concerned month duly signed and certified by him along with bill, only after due verification of this log book and after satisfactory performance of Agency during the billing period, monthly payment will be released .16. Every major problem or Fault in operation of water supply scheme for the concerned industrial area must be resolve within 24 Hrs. Any type of complain must be attainted or resolved within 24 hours by the agency or Contractor and in no case water supply will be closed or stopped for more than 24 hours. The labor cost of lowering or unlowering from tube well or open well etc. will be bear by contractor. Contractor will provide minimum 10 nos skilled staff for O & M with their ID proof and mobile No. and contractor have to submit duly signed staff payment certificate for the previous month before raising bill for monthly payment. Also contractor have to submit insurance of all 10 staff deputed in O & M of WSS work. All T and P will be provided by the contractor including all safety measure for water supply. In case agency or Contractor fails to comply the above terms and Conditions, a daily penalty of Rs. 1000 will be imposed or recovered from his bill without assigning any reason. The corporation reserve full rights to reject the contract any time if services not found satisfactory or without assigning any reason
UNIVERSAL ELECTRICALS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .