| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAccepted-AOC | ₹38.3 L Quoted ₹39.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹39.6 L+₹35,103.94 (0.89%)Rejected-Finance 2 B KRISHNA NAGAR AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹39.6 L+₹35,103.94 (0.89%) | L2 | Rejected-Finance L2 |
| 3 | L3₹40.0 L+₹68,835.94 (1.75%)Rejected-Finance | ₹40.0 L+₹68,835.94 (1.75%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Neelkanth Engineers L1 | S M BUILDERS L3 | M/S Mahal Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5m in depth and getting out in soft/loose soil complete all as specified | 140 | Cum | 140 ₹19,600 | 110 ₹15,400 | 100 ₹14,000 Lowest |
| 2.00 | Material and labour for returning,filling soil in, including spreading, levelling,watering and well ramming in layers not exceeding 25 cm eachcomplete all as specified and as directed. | 100 | Cum | 40 ₹4,000 | 10 ₹1,000 Lowest | 70 ₹7,000 |
| 3.00 | Material and labour for removing excavated soils n exc. 50 m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed | 40 | Cum | 100 ₹4,000 | 10 ₹400 Lowest | 90 ₹3,600 |
| 4.00 | Taking down cement plaster of any desription on brick walls / RCC surface including racking out joints hacking for key scrubbing down with water etc complete all as specified and as directed | 240 | CUM | 10 ₹2,400 Lowest | 10 ₹2,400 Lowest | 10 ₹2,400 Lowest |
| 5.00 | Material and labour for rendering 15mm thick on fair faces of brick work or concrete surfaces etc in cement mortar 1:4 finished even and fair complete all as specified and as directed. | 2,140 | Sqm | 150 ₹3,21,000 | 140 ₹2,99,600 Lowest | 160 ₹3,42,400 |
| 6.00 | Demolition of brick work or stone masonary built in cement mortar including all quoins,arches, pillars etc complete all as specified and as directed. | 119.7 | Cum | 50 ₹5,985 Lowest | 100 ₹11,970 | 100 ₹11,970 |
| 7.00 | Material and labour for Brick work with sub class 'B' old size bricks straight or curved on plan exc 6 m mean radius built in CM 1:6 complete all as specified and as directed | 437.7 | Cum | 3,825 ₹16,74,202.5 | 3,700 ₹16,19,490 Lowest | 3,800 ₹16,63,260 |
| 8.00 | Material and labour for sub class 'B' old size bricks laid and bedded in cement mortar 1:6 and pointed flush in cement mortar1:3 complete all as specified and as directed | 60 | Sqm | 375 ₹22,500 Lowest | 500 ₹30,000 | 500 ₹30,000 |
| 9.00 | Material and labour for flush pointing to brick work etc in floor, roofs, aprons laid on edge in paving or flat in cement mortar 1:3 complete all as specified and as directed. | 6 | XSqm | 400 ₹2,400 Lowest | 500 ₹3,000 | 500 ₹3,000 |
| 10.00 | Material and labour for Brick work (except bricks) using bricks obtained from demolition straight or curved on plan exc 6 m mean radius built in CM 1:6 complete all as specified and as directed | 37.2 | Cum | 1,500 ₹55,800 | 1,190 ₹44,268 Lowest | 1,200 ₹44,640 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
18 Sept 2025, 6:00 pmClosed
CWE PATIALA
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact 01712200082
REPAIR AND MAINT OF BRICK DERAINS,PLASTERING,RCC COVER SLABS.NP2 PIPE LINES AND CONNECTED WORKS IN TECHNICAL AREA AT DAPPAR UNDER AGE(I) DAPPAR
2025_MES_727007_1
CWE/PAT/T-42/2025-26
Open Tender
Civil Works
Item Rate
180 days
AGE I DAPPAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
AGE I DAPPAR
₹1 L
21 Oct 2025
21 Aug 2025
20 Sept 2025
21 Aug 2025
18 Sept 2025
4 Sept 2025
21 Aug 2025 - 31 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .